DOB05/01/2026EMERGENCY WORK ORDER-@ TIME OF INSP OBSVD EXP2,4 FULL HEIGHT -/+ 10FT CMU BLOCK MASONRY WALLS FREE STANDING,S/W SHED @ EXP2 WAS OBSVD NOT HAVING DIRECT SUPPORT TO METAL DECK CANTILEVER,INADEQUATE GUARDRAILS SYSTEM @ ENTIRE SITE.IMMED BRACING FOR FREE STANDING CMUC BLOCK WALLS RELOCATE CMU BLOCK TO GRADE FOUNDATION SLAB LEVER
ECB05/01/2026WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AS NOTED AT TIME OF INSPECTION OF THE CONSTRUCTION SITE, A FOUR-STORY NEW BUILDING WITH CMU BLOCK MASONRY WALLS AND A STEEL S$2K due
ECB05/01/2026FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AT THE TIME OF INSPECTION OF THE CONSTRUCTION SITE, A FOUR-STORY NEW BUILDING WITH CMU BLOCK MASONRY WALLS AND A STEEL STRUCTURE$10K due
ECB05/01/2026CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. AS NOTED AT TIME OF INSPECTION ON A A CONSTRUCTION SITE. THE NEW 4 STORY BUILDING IS A CMU BLOCK MASONRY WALL AND STEEL STRUCTURE WORKING IN PROGRE$5K due
ECB05/01/2026BC 2104.5. FAILURE TO PROVIDE MASONRY CMU BLOCK WALL CONSTRUCTION BRACING ACCORDANCE WITH TMS 602/AC 1530.1/ASCE SECTION 3.3E. AS NOTED AT TIME OF INSPECTION ON A CONSTRUCTION SITE, 4 STORY NEW BUILDING CMU BLO$2K due
ECB05/01/2026FAILURE TO PROVIDE PROTECTION OF ADJOINING PROPERTY DURING CONSTRUCTION OR DEMOLITION AS REQUIRED. AT TIME OF INSPECTION OF THE CONSTRUCTIONSITE, A FOUR STORY NEW BUILDING WITH CMU BLOCK MASONRY WALLS AND A STE$10K due
DOB05/18/2011FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/09/2011FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/25/2011NEW BUILDING OR OPEN LOT OCCUPIED W/O A VALID C OF O. NOTED: BUILDING RECORDS INDICATES PREMISES IS VACANT LAND. PREMISES NOW OCCUPIED AS COMMERCIAL PARKING/VEHICLE STORAGE (DEAD STORAGE). REMEDY: OBTAIN ANothing owed — awaiting certificate of correction
ECB12/17/2010UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. NOTE:RESPONDENT FAILED TO CORRECT THE CONDITIONS CITED IN THE PRIOR N.O.V. 34868793R FOR WORK W/O A PERMIT; CHAIN LINK FENCE OVER 8FT ERECTED ONNothing owed — awaiting certificate of correction
Zoned residential, not Manhattan · Owner of record: ONE THIRTY SIX DEVELOPMENT LLC · 1,657 sf lot · 0 FAR built · Flood zone X