← Back
Two stories - detached, small or mid-size
53-12 MORENCI LANE
QUEENS · BIN 4171196
💬 Discuss this project
2007Year Built
2Stories
A1Building Class
R2Zoning
3,572 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,540 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/06/2020$2.1M—Private party → Private party$581/sf building
11/03/2015$2.3M—Private party → Private party$650/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC209/03/2025
JIAN ENGINEERING PLLC108/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083209/03/2025
JIAN ENGINEERING PLLC7397108/18/2025
Building Lifecycle
All (33)Filed (3)Violation (2)Objection (4)Special Inspection (24)
09/12/2025
Special inspection requirement — Fenestration areas
JAN PEREZ
09/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JAN PEREZ
09/12/2025
Special inspection requirement — Maintenance information
JAN PEREZ
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
09/12/2025
Special inspection requirement — Air barrier - visual inspection
JAN PEREZ
09/12/2025
Special inspection requirement — Fenestration air leakage
JAN PEREZ
09/12/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
09/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAN PEREZ
09/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAN PEREZ
09/03/2025
Filed — Alteration
PROPOSED ELEVATOR TO BE INSTALLED ON OSP OF PROPERTY. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
Q01226058-P1
08/18/2025
Filed — Alteration
PROPOSED ELEVATOR TO BE INSTALLED ON OSP OF PROPERTY. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
Q01226058-S1
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2025
Special inspection requirement — Concrete - Cast-In-Place
08/14/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
08/14/2025
Special inspection requirement — Structural Steel - Welding
JIAN DENG
08/14/2025
Special inspection requirement — Structural Steel - Details
08/14/2025
Special inspection requirement — Final
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
08/12/2025
Special inspection requirement — Maintenance information
JAN PEREZ
08/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JAN PEREZ
08/12/2025
Special inspection requirement — Air barrier - visual inspection
JAN PEREZ
08/12/2025
Special inspection requirement — Fenestration air leakage
JAN PEREZ
08/12/2025
Special inspection requirement — Fenestration areas
JAN PEREZ
08/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAN PEREZ
08/12/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
08/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAN PEREZ
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/05/2025
Objection raised — Zoning
06/05/2025
Objection raised — Zoning
05/20/2025
Filed — Alteration
PROPOSED ELEVATOR TO BE INSTALLED ON OSP OF PROPERTY. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
Q01226058-I1
11/30/2006
Violation issued (ECB, closed)
Construction
09/28/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDH2O CONCEPT PLBG & HTG CO07/24/2009
BISPLISSUEDH2O CONCEPT PLBG & HTG CO02/17/2009
BISPLISSUEDH2O CONCEPT PLBG & HTG07/11/2008
BISEQISSUEDSTRAIGHT LINE CONSTRUCTION01/19/2007
BISOTISSUEDJ & P POOL INC12/14/2006
BIS—ISSUEDSTRAIGHT LINE CONSTRUCTION11/09/2006
BISEQISSUEDSTRAIGHT LINE CONSTRUCTION11/09/2006
BISEQISSUEDSTRAIGHT LINE CONSTRUCTION03/29/2006
BIS—ISSUEDSTRAIGHT LINE CONSTRUCTION03/29/2006
BIS—ISSUEDDISANO DEMOLITION CO. INC.03/17/2006
BISEQISSUEDDISANO DEMOLITION CO. INC.03/17/2006
1 project · most recent 09/03/2025
Steel Concrete
FiledStatusContractorScope
09/03/2025——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
09/12/2025Fenestration areasJAN PEREZenergy_progress
09/12/2025Fenestration and door U-factor and product ratingsJAN PEREZenergy_progress
09/12/2025Maintenance informationJAN PEREZenergy_progress
09/12/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
09/12/2025Air barrier - visual inspectionJAN PEREZenergy_progress
09/12/2025Fenestration air leakageJAN PEREZenergy_progress
09/12/2025Energy Code Compliance InspectionsJAN PEREZprogress
09/12/2025Fire-Resistance Rated ConstructionJAN PEREZprogress
09/12/2025Structural Stability – Alterations of existing buildingsJAN PEREZspecial
08/14/2025Tenant Protection Plan Compliance—special
08/14/2025Concrete - Cast-In-Place—special
08/14/2025Structural Steel - High Strength BoltingJIAN DENGspecial
08/14/2025Structural Steel - WeldingJIAN DENGspecial
08/14/2025Structural Steel - Details—special
08/14/2025Final—progress
08/12/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
08/12/2025Maintenance informationJAN PEREZenergy_progress
08/12/2025Fenestration and door U-factor and product ratingsJAN PEREZenergy_progress
08/12/2025Air barrier - visual inspectionJAN PEREZenergy_progress
08/12/2025Fenestration air leakageJAN PEREZenergy_progress
08/12/2025Fenestration areasJAN PEREZenergy_progress
08/12/2025Fire-Resistance Rated ConstructionJAN PEREZprogress
08/12/2025Energy Code Compliance InspectionsJAN PEREZprogress
08/12/2025Structural Stability – Alterations of existing buildingsJAN PEREZspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026Q01226058-P1Request digital key ↗
08/19/2026Q01226058-S1Request digital key ↗
08/19/2026Q01226058-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q01226058-S1Open ↗
09/02/2026Q01226058-S1Open ↗
09/02/2026Q01226058-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026Q01226058-S1Open ↗
08/26/2026Q01226058-I1Open ↗
08/26/2026Q01226058-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q01226058-I1Open ↗
08/13/2026Q01226058-S1Open ↗
08/13/2026Q01226058-P1Open ↗