← Back
BuildNYC
Two stories - detached, small or mid-size
53-12 MORENCI LANE
QUEENS · BIN 4171196
💬 Discuss this project
2007Year Built
2Stories
A1Building Class
R2Zoning
3,572 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,540 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 18 docs
Floor 11 filing · 18 docs
Cellar1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/06/2020$2.1M—Private party → Private party$581/sf building
11/03/2015$2.3M—Private party → Private party$650/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yang Engineering209/03/2025
Jian Engineering108/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD Design Studio603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Straight Line ConstructionGeneral Contractor303/21/2026
Disano DemolitionGeneral Contractor203/21/2026
H2O Concept Plumbing & HeatingPlumbing103/21/2026
J&P PoolGeneral Contractor112/14/2006
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc Consulting Engineers4083209/03/2025
Jian Engineering7397108/18/2025
Building Lifecycle
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
09/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAN PEREZ
09/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAN PEREZ
09/12/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
09/12/2025
Special inspection requirement — Fenestration air leakage
JAN PEREZ
32 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDH2O Concept Plumbing & Heating07/24/2009
BISPLISSUEDH2O Concept Plumbing & Heating02/17/2009
BISPLISSUEDH2O Concept Plumbing & Heating07/11/2008
BISEQISSUEDStraight Line Construction01/19/2007
BISOTISSUEDJ & P Pool12/14/2006
BIS—ISSUEDStraight Line Construction11/09/2006
BISEQISSUEDStraight Line Construction11/09/2006
BISEQISSUEDStraight Line Construction03/29/2006
BIS—ISSUEDStraight Line Construction03/29/2006
BIS—ISSUEDDisano Demolition03/17/2006
BISEQISSUEDDisano Demolition03/17/2006
1 project · most recent 09/03/2025
Steel Concrete
FiledStatusContractorScope
09/03/2025——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
09/12/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
09/12/2025Structural Stability – Alterations of existing buildingsJAN PEREZspecial
09/12/2025Fire-Resistance Rated ConstructionJAN PEREZprogress
09/12/2025Energy Code Compliance InspectionsJAN PEREZprogress
09/12/2025Fenestration air leakageJAN PEREZenergy_progress
09/12/2025Air barrier - visual inspectionJAN PEREZenergy_progress
09/12/2025Maintenance informationJAN PEREZenergy_progress
09/12/2025Fenestration and door U-factor and product ratingsJAN PEREZenergy_progress
09/12/2025Fenestration areasJAN PEREZenergy_progress
08/14/2025Final—progress
08/14/2025Concrete - Cast-In-Place—special
08/14/2025Structural Steel - High Strength BoltingJIAN DENGspecial
08/14/2025Structural Steel - WeldingJIAN DENGspecial
08/14/2025Tenant Protection Plan Compliance—special
08/14/2025Structural Steel - Details—special
08/12/2025Air barrier - visual inspectionJAN PEREZenergy_progress
08/12/2025Fenestration and door U-factor and product ratingsJAN PEREZenergy_progress
08/12/2025Maintenance informationJAN PEREZenergy_progress
08/12/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
08/12/2025Structural Stability – Alterations of existing buildingsJAN PEREZspecial
08/12/2025Energy Code Compliance InspectionsJAN PEREZprogress
08/12/2025Fire-Resistance Rated ConstructionJAN PEREZprogress
08/12/2025Fenestration areasJAN PEREZenergy_progress
08/12/2025Fenestration air leakageJAN PEREZenergy_progress
18 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account