← Back
Large suburban residence
53-15 241 STREET
QUEENS · BIN 4170055
💬 Discuss this project
1960Year Built
1Stories
A3Building Class
R1-2Zoning
3,522 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 8,900 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L & L CONSTRUCTION DEVELO303/22/2026
KJK ELECTRIC INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/25/2019$910K—53-15 241ST STREET HOLDINGS, LLC → Private party$258/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
W.D.ROSS, R.A., P.C405/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TK ARCDESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495305/24/2022
W.D.ROSS, R.A., P.C3758305/24/2022
Building Lifecycle
All (42)Filed (4)Permit Issued (3)Signed Off (2)Violation (4)Objection (6)Special Inspection (23)
01/18/2023
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH JOB #421959287 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00430968-I1
01/18/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION#421959287 AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00431505-I1
06/03/2022
Permit issued — Plumbing
Q00431505-I1-PL
05/31/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ROSS
05/31/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ROSS
05/31/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ROSS
05/31/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
05/24/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION#421959287 AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00431505-P3
05/23/2022
Special inspection requirement — HVAC and service water heating system controls
WILLIAM ROSS
05/23/2022
Special inspection requirement — HVAC and service water heating equipment
WILLIAM ROSS
05/23/2022
Special inspection requirement — Electrical energy consumption
WILLIAM ROSS
05/23/2022
Special inspection requirement — HVAC insulation and sealing
WILLIAM ROSS
05/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ROSS
05/23/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
05/23/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/23/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ROSS
05/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ROSS
10/12/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Violation issued (ECB, closed)
Unknown
10/12/2021
Violation issued (ECB, closed)
Construction
04/29/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION#421959287 AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00431505-P1
04/29/2021
Special inspection requirement — HVAC insulation and sealing
WILLIAM ROSS
04/29/2021
Special inspection requirement — Electrical energy consumption
WILLIAM ROSS
04/29/2021
Special inspection requirement — HVAC and service water heating system controls
WILLIAM ROSS
04/29/2021
Special inspection requirement — HVAC and service water heating equipment
WILLIAM ROSS
04/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ROSS
04/29/2021
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ROSS
04/29/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/29/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ROSS
03/10/2021
Permit issued — Plumbing
Q00431505-I1-PL
12/03/2020
Permit issued — Construction Fence
Q00430968-I1-FN
11/25/2020
Objection raised — Inspections
11/25/2020
Objection resolved — Addressed
11/25/2020
Objection raised — Other
11/25/2020
Objection resolved — Addressed
11/25/2020
Objection raised — Scope
11/25/2020
Objection resolved — Addressed
11/20/2020
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH DOB APPLICATION#421959287 AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00431505-I1
11/19/2020
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH JOB #421959287 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00430968-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC06/03/2022
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO03/10/2021
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP12/03/2020
BIS—ISSUEDL&L CONSTRUCTION DEVELOP04/25/2022
BIS—ISSUEDL&L CONSTRUCTION DEVELOP04/06/2021
BIS—ISSUEDL&L CONSTRUCTION DEVELOP01/21/2021
BIS—ISSUEDL&L CONSTRUCTION DEVELOP12/03/2020
BIS—ISSUEDBETTER WAY HOME IMPROVEMENT02/28/1994
1 project · most recent 05/18/2022
General Wiring
FiledStatusContractorScope
05/18/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/31/2022Energy Code Compliance InspectionsWILLIAM ROSSprogress
05/31/2022Fire-Resistance Rated ConstructionWILLIAM ROSSprogress
05/31/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/31/2022Fire-Resistant Penetrations and JointsWILLIAM ROSSspecial
05/31/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
05/23/2022HVAC and service water heating system controls WILLIAM ROSSenergy_progress
05/23/2022HVAC and service water heating equipment WILLIAM ROSSenergy_progress
05/23/2022Electrical energy consumptionWILLIAM ROSSenergy_progress
05/23/2022HVAC insulation and sealing WILLIAM ROSSenergy_progress
05/23/2022Fire-Resistant Penetrations and JointsWILLIAM ROSSspecial
05/23/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
05/23/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/23/2022Energy Code Compliance InspectionsWILLIAM ROSSprogress
05/23/2022Fire-Resistance Rated ConstructionWILLIAM ROSSprogress
04/29/2021HVAC insulation and sealing WILLIAM ROSSenergy_progress
04/29/2021Electrical energy consumptionWILLIAM ROSSenergy_progress
04/29/2021HVAC and service water heating system controls WILLIAM ROSSenergy_progress
04/29/2021HVAC and service water heating equipment WILLIAM ROSSenergy_progress
04/29/2021Fire-Resistance Rated ConstructionWILLIAM ROSSprogress
04/29/2021Energy Code Compliance InspectionsWILLIAM ROSSprogress
04/29/2021Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/29/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/29/2021Fire-Resistant Penetrations and JointsWILLIAM ROSSspecial
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026Q00431505-P3Request digital key ↗
08/15/2026Q00431505-P1Request digital key ↗
08/14/2026Q00431505-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00430968-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
09/26/2022440649078Open ↗
06/03/2022421959287Open ↗
08/20/2021421959287Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/01/2022421959287Open ↗
▸BISWORK PERMIT APPLICATION1
12/03/2020421959287Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/02/2020421959287Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
04/24/2023440649078Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
05/07/2023421959287Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/07/2023421959287Open ↗
▸BISZONING DIAGRAM1
11/24/2020421959287Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026Q00431505-P3Open ↗
09/02/2026Q00431505-P3Open ↗
09/02/2026Q00431505-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026Q00431505-P3Open ↗
09/02/2026Q00431505-P3Open ↗
09/02/2026Q00431505-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00430968-I1Open ↗
08/26/2026Q00431505-I1Open ↗
08/26/2026Q00431505-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/23/2020421959287Open ↗
▸Trade Schedules & Equipment5
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
11/23/2020421959287Open ↗
▸BISHEATING SYSTEMS1
05/07/2023421959287Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/07/2023421959287Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/07/2023421959287Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/02/2023421959287Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
09/26/2022440649078Open ↗
03/23/2020421959287Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
05/07/2023421959287Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/02/2020421959287Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00431505-P3Open ↗
08/26/2026Q00431505-P1Open ↗
08/14/2026Q00431505-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/23/2020421959287Open ↗
11/19/2020421959287Open ↗
▸Energy Compliance14
▸BISFENESTRATION AIR LEAKAGE1
05/07/2023421959287Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/07/2023421959287Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/02/2020421959287Open ↗
▸BISINTERIOR LIGHTING POWER1
05/07/2023421959287Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
05/07/2023421959287Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/07/2023421959287Open ↗
▸BISFENESTRATION AREAS1
05/07/2023421959287Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
05/07/2023421959287Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/23/2020421959287Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/07/2023421959287Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/07/2023421959287Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/07/2023421959287Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/07/2023421959287Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/23/2020421959287Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/02/2020421959287Open ↗
11/23/2020421959287Open ↗
11/19/2020421959287Open ↗
▸DOB NOWSOIL REPORT3
08/13/2026Q00431505-P3Open ↗
08/13/2026Q00431505-I1Open ↗
08/13/2026Q00431505-P1Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
05/07/2023421959287Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/07/2023421959287Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
05/09/2023421959287Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/07/2023421959287Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/07/2023421959287Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/07/2023421959287Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/07/2023421959287Open ↗
▸BISMASONRY1
05/07/2023421959287Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
05/07/2023421959287Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00431505-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE2
03/23/2020421959287Open ↗
—421959287Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
03/23/2020421959287Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
04/24/2023440649078Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/01/2023421959287Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
06/21/2022421959287Open ↗
08/27/2021421959287Open ↗
11/24/2020440649078Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
03/23/2020421959287Open ↗
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION3
04/24/2023440649078Open ↗
04/24/2023440649078Open ↗
04/24/2023440649078Open ↗
▸BISPLOT DIAGRAM2
05/07/2023421959287Open ↗
11/19/2020421959287Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
09/19/2022440649078Open ↗
▸BISSHUTOFF DAMPERS1
05/07/2023421959287Open ↗
▸BISSD1 & SD21
05/23/2023421959287Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/23/2020421959287Open ↗
▸BISLOWEST FLOOR ELEVATION1
05/07/2023421959287Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/19/2022440649078Open ↗
▸BISMAINTENANCE INFORMATION1
05/07/2023421959287Open ↗
▸BISPERMANENT CERTIFICATE1
05/07/2023421959287Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/24/2023440649078Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
05/07/2023421959287Open ↗