← Back
One family attached or semi-detached
53-20 37 ROAD
QUEENS · BIN 4027552
💬 Discuss this project
1940Year Built
1Stories
A5Building Class
R4Zoning
942 sfGross Floor Area
1Units
One family attached or semi-detached · 2,100 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Cellar3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASKON ARCHITECTS, P.C.506/12/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER POWER CONSTRUCTIONGeneral Contractor903/21/2026
TRI STATE PLBG & HTG INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596506/12/2022
Building Lifecycle
All (46)Filed (5)Permit Issued (6)Signed Off (2)Inspection (3)Special Inspection (30)
07/13/2022
Signed off — Alteration
FILING FOR PLUMBING WORK
Q00550436-I1
07/13/2022
Signed off — Alteration
INTERIOR RENOVATION WORK TO INSTALL (3) PIECE BATHROOM AT CELLAR, INSTALL NEW BOILER AND WATER HEATER, (2) PIECE BATHROOM AT 1ST FLOOR, RELOCATE THE STAIRCASE AT 1ST FLOOR TO CELLAR, REPLACE CONCRETE SLAB AT OPEN TERRACE AND INSTALL REAR METAL DECK
Q00504676-I1
06/29/2022
Permit issued — Plumbing
Q00550436-I1-PL
06/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
06/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
06/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
06/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
06/12/2022
Filed — Alteration
FILING FOR PLUMBING WORK
Q00550436-P2
06/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
06/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
06/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
06/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
05/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
02/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
02/25/2022
Special inspection requirement — Fenestration air leakage
Akeeb Shekoni
02/25/2022
Special inspection requirement — Fenestration areas
Akeeb Shekoni
02/25/2022
Special inspection requirement — Air barrier - visual inspection
Akeeb Shekoni
02/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
02/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
02/25/2022
Special inspection requirement — Concrete - Cast-In-Place
Akeeb Shekoni
02/25/2022
Special inspection requirement — Final
HANSA PERSAUD
02/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
02/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
01/13/2022
Permit issued — Plumbing
Q00550436-I1-PL
12/28/2021
Permit issued — General Construction
Q00504676-I1-GC
12/13/2021
Filed — Alteration
INTERIOR RENOVATION WORK TO INSTALL (3) PIECE BATHROOM AT CELLAR, INSTALL NEW BOILER AND WATER HEATER, (2) PIECE BATHROOM AT 1ST FLOOR, RELOCATE THE STAIRCASE AT 1ST FLOOR TO CELLAR, REPLACE CONCRETE SLAB AT OPEN TERRACE AND INSTALL REAR METAL DECK
Q00504676-P1
11/17/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2021
Filed — Alteration
FILING FOR PLUMBING WORK
Q00550436-P1
11/04/2021
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
11/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
11/04/2021
Special inspection requirement — Concrete - Cast-In-Place
Akeeb Shekoni
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
11/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
11/04/2021
Special inspection requirement — Fenestration air leakage
Akeeb Shekoni
11/04/2021
Special inspection requirement — Air barrier - visual inspection
Akeeb Shekoni
11/04/2021
Special inspection requirement — Final
HANSA PERSAUD
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
11/04/2021
Special inspection requirement — Fenestration areas
Akeeb Shekoni
11/04/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
10/18/2021
Permit issued — General Construction
Q00504676-I1-GC
09/20/2021
Permit issued — Plumbing
Q00550436-I1-PL
08/30/2021
Permit issued — General Construction
Q00504676-I1-GC
07/19/2021
Filed — Alteration
FILING FOR PLUMBING WORK
Q00550436-I1
05/06/2021
Filed — Alteration
INTERIOR RENOVATION WORK TO INSTALL (3) PIECE BATHROOM AT CELLAR, INSTALL NEW BOILER AND WATER HEATER, (2) PIECE BATHROOM AT 1ST FLOOR, RELOCATE THE STAIRCASE AT 1ST FLOOR TO CELLAR, REPLACE CONCRETE SLAB AT OPEN TERRACE AND INSTALL REAR METAL DECK
Q00504676-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC06/29/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC01/13/2022
DOB NOWGeneral ConstructionSigned-offSUPER POWER CONSTRUCTION12/28/2021
DOB NOWGeneral ConstructionSigned-offSUPER POWER CONSTRUCTION10/18/2021
DOB NOWPlumbingSigned-offDW PLUMBING INC09/20/2021
DOB NOWGeneral ConstructionSigned-offSUPER POWER CONSTRUCTION08/30/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/14/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
06/14/2022HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
06/14/2022HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
06/14/2022HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
06/08/2022HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
06/08/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
06/08/2022HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
06/08/2022HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
02/25/2022Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
02/25/2022Energy Code Compliance InspectionsAkeeb Shekoniprogress
02/25/2022Fenestration air leakageAkeeb Shekonienergy_progress
02/25/2022Fenestration areasAkeeb Shekonienergy_progress
02/25/2022Air barrier - visual inspectionAkeeb Shekonienergy_progress
02/25/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
02/25/2022Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
02/25/2022Concrete - Cast-In-PlaceAkeeb Shekonispecial
02/25/2022FinalHANSA PERSAUDprogress
02/15/2022Energy Code Compliance InspectionsAkeeb Shekoniprogress
02/15/2022Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
11/04/2021HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
11/04/2021HVAC-R and service water heating system controlsAkeeb Shekonienergy_progress
11/04/2021Concrete - Cast-In-PlaceAkeeb Shekonispecial
11/04/2021Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
11/04/2021Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
11/04/2021Fenestration air leakageAkeeb Shekonienergy_progress
Latest 25 of 30.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00504676-P1Request digital key ↗
08/26/2026Q00504676-I1Request digital key ↗
08/26/2026Q00550436-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026Q00550436-P1Open ↗
08/13/2026Q00550436-I1Open ↗
08/13/2026Q00504676-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00550436-P2Open ↗
08/31/2026Q00550436-I1Open ↗
08/30/2026Q00504676-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00504676-P1Open ↗
08/26/2026Q00504676-I1Open ↗
08/26/2026Q00550436-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00550436-P2Open ↗
08/31/2026Q00550436-I1Open ↗
08/30/2026Q00504676-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00504676-P1Open ↗
08/26/2026Q00504676-I1Open ↗
08/26/2026Q00550436-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00550436-I1Open ↗
08/13/2026Q00504676-I1Open ↗