Condo, residential unit in elevator building
Boulevard East Condominium
53 BOERUM PLACE · BIN 3350516
💬 Discuss this project
2003Year Built
11Stories
R4Building Class
C6-2AZoning
90,234 sfGross Floor Area
100Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: THE BOARD OF MANAGERS · 13,545 sf lot · 6.66 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLSTICE RESIDENTIAL GROUP309/02/2026
TRIANGLE ENTERPRISE NYC I2107/08/2026
PRIME CONTRACTORS, INC503/22/2026
TRIANGEL ENTERPRISES NYC103/22/2026
237-41 STRATE STREET2403/22/2026
PROCIDA CONSTRUCTION103/22/2026
TKR PROPERTY SERVICES303/21/2026
BOULEVARD EAST CONDOMINIUM503/21/2026
LARDON 1330403/21/2026
53 BOERUM PLACE LLCQ103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE203/21/2026
ATLANTIC BUILDING SUPPLY INC.1003/21/2026
GAMILL ENGINEERING, PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIANGLE ENTERPRISE NYC IGeneral Contractor2207/08/2026
QUINTUNA SERVICE CORPGeneral Contractor407/08/2026
SCARPONI&SON PLBG&HTG CORPlumbing407/08/2026
PRIME CONTRACTORS, INCGeneral Contractor303/21/2026
HAROLD HEADLEY PLUMBINGPlumbing207/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MAYTA + SEBASTIAN ARCHITE5890208/03/2026
GAMILL ENGINEERING, P.C.1773104/11/2022
CASEWORKS ARCHITECTS, PLL1912106/30/2021
Building Lifecycle
All (116)Filed (12)Permit Issued (19)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (6)Special Inspection (4)
08/03/2026
Filed — Alteration
Faade repairs. No change in use, egress, or occupancy.
B01347135-I1
05/08/2026
Violation issued (HPD, open)
A
01/15/2026
Special inspection requirement — Masonry
Raul Mayta
01/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Raul Mayta
01/15/2026
Special inspection requirement — Final
Raul Mayta
11/25/2025
Cycle 10 facade report submitted
11/20/2025
Cycle 10 facade report signed — SWARMP
11/10/2025
Cycle 10 facade inspection completed
10/06/2025
Filed — Alteration
facade inspection
B01290825-I1
04/15/2024
Filed — Alteration
TEMPORARY OVERHEAD PROTECTION DURING EXTERIOR REPAIRS AT THE ADJACENT PROPERTY, 120 SCHERMERHORN ST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01035707-I1
04/15/2024
Permit issued — Protection and Mechanical Methods
B01035707-I1-PMM
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2023
Signed off — Alteration
Plumbing work as shown on plan for the replacement of tub to a shower on existing roughing and installation of new clothes washer. No change of Use, Occupancy or Means of Egress.
B00716154-I1
02/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/11/2022
Signed off — Alteration
B00545758-I1
07/07/2022
Signed off — Alteration
B00543423-I1
07/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2022
Permit issued — Plumbing
B00545758-I1-PL
06/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2022
Permit issued — Plumbing
B00545758-I1-PL
04/26/2022
Permit issued — Plumbing
B00716154-I1-PL
04/11/2022
Filed — Alteration
Plumbing work as shown on plan for the replacement of tub to a shower on existing roughing and installation of new clothes washer. No change of Use, Occupancy or Means of Egress.
B00716154-I1
04/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
03/09/2022
Violation issued (HPD, closed)
A
01/20/2022
Permit issued — General Construction
B00543423-I1-GC
11/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2021
Permit issued — Plumbing
B00545758-I1-PL
09/17/2021
Permit issued — General Construction
B00543423-I1-GC
06/30/2021
Filed — Alteration
B00545758-I1
06/30/2021
Filed — Alteration
B00543423-I1
06/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/15/2021
Cycle 9 facade report submitted
04/11/2021
Cycle 9 facade report signed — SAFE
03/02/2021
Cycle 9 facade inspection completed
12/05/2020
Permit issued — Sidewalk Shed
B00072396-I1-SH
12/02/2020
Permit issued — Supported Scaffold
B00364661-I1-SF
11/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/19/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00072483-P1
10/19/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014CODE.
B00072396-P2
09/24/2020
Permit issued — Sidewalk Shed
B00072396-I1-SH
09/23/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014CODE.
B00072396-P1
09/23/2020
Permit issued — Supported Scaffold
B00364661-I1-SF
08/10/2020
Violation issued (ECB, closed)
Construction
08/10/2020
Violation issued (ECB, closed)
Cranes and Derricks
08/10/2020
Violation issued (ECB, closed)
Construction
07/10/2020
Permit issued — Sidewalk Shed
B00072396-I1-SH
07/01/2020
Permit issued — Supported Scaffold
B00364661-I1-SF
06/30/2020
Filed — Alteration
B00364661-I1
06/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/13/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/21/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/21/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/04/2019
Permit issued — Sidewalk Shed
B00072396-I1-SH
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedPRIME CONTRACTORS, INC04/15/2024
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC06/18/2022
DOB NOWPlumbingSigned-offHAROLD HEADLEY PLUMBING05/19/2022
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR04/26/2022
DOB NOWGeneral ConstructionSigned-offQUINTUNA SERVICE CORP01/20/2022
DOB NOWPlumbingSigned-offHAROLD HEADLEY PLUMBING10/21/2021
DOB NOWGeneral ConstructionSigned-offQUINTUNA SERVICE CORP09/17/2021
DOB NOWSidewalk ShedPermit IssuedTRIANGLE ENTERPRISE NYC I12/05/2020
DOB NOWSupported ScaffoldPermit IssuedTRIANGLE ENTERPRISE NYC I12/02/2020
DOB NOWSidewalk ShedPermit IssuedTRIANGLE ENTERPRISE NYC I09/24/2020
DOB NOWSupported ScaffoldPermit IssuedTRIANGLE ENTERPRISE NYC I09/23/2020
DOB NOWSidewalk ShedPermit IssuedTRIANGLE ENTERPRISE NYC I07/10/2020
DOB NOWSupported ScaffoldPermit IssuedTRIANGLE ENTERPRISE NYC I07/01/2020
DOB NOWSidewalk ShedPermit IssuedTRIANGLE ENTERPRISE NYC I02/04/2019
DOB NOWSupported ScaffoldPermit IssuedTRIANGLE ENTERPRISE NYC I02/04/2019
DOB NOWSupported ScaffoldPermit IssuedTRIANGLE ENTERPRISE NYC I10/26/2018
DOB NOWSidewalk ShedPermit IssuedTRIANGLE ENTERPRISE NYC I10/26/2018
DOB NOWSupported ScaffoldPermit IssuedTRIANGLE ENTERPRISE NYC I08/22/2018
DOB NOWSidewalk ShedPermit IssuedTRIANGLE ENTERPRISE NYC I08/21/2018
BISOTISSUEDTRIANGLE ENTERPRISE NYC I06/10/2020
BISPLISSUEDPRECISION PLBG SVCS., INC10/11/2018
BIS—ISSUEDTRISTATE CONTRACTING GROUP CORP.02/06/2017
BISPLISSUEDVITELLO P & MECHANICAL INC06/10/2015
BISOTISSUEDHARLEM VALLEY CORPORATION05/26/2015
BISPLISSUEDMARCO POLO PLBG & HTG INC04/28/2015
BISOTISSUEDMAR-CEL RENOVATION LLC04/08/2015
BIS—ISSUEDTRISTATE CONTRACTING GROUP CORP11/05/2014
BISMHISSUEDGOLD COAST MECHANICAL INC08/01/2014
BISMHISSUEDPARK PLUS, INC11/20/2013
BISOTISSUEDBERNINI CONSTRUCTION CORP02/05/2013
BISEQISSUEDBERNINI CONSTRUCTION CORP02/05/2013
BISOTISSUEDBERNINI CONSTRUCTION CORP02/06/2012
BISEQISSUEDBERNINI CONSTRUCTION CORP09/22/2011
BISOTISSUEDBERNINI CONSTRUCTION CORP08/29/2011
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/22/2011
BISCCISSUEDPROCIDA CONSTRUCTION CORP.08/02/2005
BISPLISSUEDALADDIN PL CORP06/08/2005
BISOTISSUEDFJS CONT INC05/16/2005
BISBLISSUEDDANICA PLBG & HTG CORP08/17/2004
BISPLISSUEDDANICA PLUMBIN & HEATING CORP.07/12/2004
+ 16 more permits on file
4 projects · most recent 10/17/2021
General Wiring
FiledStatusContractorScope
10/17/2021Permit IssuedELPO ELECTRICAL CONTG INCGeneral Wiring
09/26/2018CompleteEVEREST ELEC'L CONTRG INCGeneral Wiring
08/20/2018Permit IssuedRICHARD NEU—
03/25/2018Permit IssuedAMRA ELECTRICAL CORPGeneral Wiring
2 projects · most recent 10/19/2020
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/19/2020Permit IssuedTRIANGLE ENTERPRISE NYC IScaffold
10/19/2020Permit IssuedTRIANGLE ENTERPRISE NYC ISidewalk Shed
1 project · most recent 10/06/2025
FiledStatusContractorScope
10/06/2025———
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/15/2026MasonryRaul Maytaspecial
01/15/2026Tenant Protection Plan ComplianceRaul Maytaspecial
01/15/2026FinalRaul Maytaprogress
04/11/2022Fire-Resistant Penetrations and JointsJACK GAMILLspecial
▾Documents — 200 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch8
09/02/2026B00072396-I1Request digital key ↗
09/02/2026B00072483-I1Request digital key ↗
09/01/2026B00543423-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/02/2026B00364661-I1Request digital key ↗
09/02/2026B00072483-I1Request digital key ↗
08/15/2026B00072483-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00072396-I1Request digital key ↗
08/15/2026B00072396-P2Request digital key ↗
08/15/2026B00072396-P1Request digital key ↗
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION16
06/10/2020322044364Open ↗
04/03/2020322044364Open ↗
02/07/2017320848035Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
03/13/2020322044364Open ↗
01/05/2016321131226Open ↗
10/09/2015321131226Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/16/2014320848035Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/29/2015320848035Open ↗
▸Seals & Professional Certifications53
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
04/03/2020322044364Open ↗
04/03/2020322044364Open ↗
03/13/2020322044364Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026B00072396-P2Open ↗
09/02/2026B00072396-P1Open ↗
09/02/2026B00072396-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
05/18/2015321131226Open ↗
08/01/2014321160710Open ↗
03/25/2014320848035Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/18/2015321131226Open ↗
08/01/2014321160710Open ↗
03/25/2014320848035Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B01347135-I1Open ↗
08/26/2026B01347135-I1Open ↗
08/24/2026B00716154-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/29/2011320364119Open ↗
08/25/2011320347255Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B01347135-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
09/26/2018321843742Open ↗
01/05/2016321131226Open ↗
10/09/2015321131226Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
01/24/2015321033804Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
03/13/2020322044364Open ↗
05/18/2015321131226Open ↗
03/25/2014320848035Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes2
03/13/2020322044364Open ↗
09/26/2018321843742Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/29/2011320364119Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/18/2015321131226Open ↗
08/01/2014321160710Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
09/29/2011320364119Open ↗
08/25/2011320347255Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
02/20/2019321843742Open ↗
11/20/2018321033804Open ↗
09/26/2018321843742Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/20/2019321843742Open ↗
11/20/2018321033804Open ↗
09/17/2015321131226Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
02/26/2015321033804Open ↗
09/12/2014321160710Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00543423-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/30/2020322044364Open ↗
12/30/2020322044364Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
01/05/2021322044364Open ↗
06/28/2019320364119Open ↗
02/20/2019321843742Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/01/2014321160710Open ↗
03/25/2014320848035Open ↗
12/06/2013320811449Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
06/11/2014320848035Open ↗
06/03/2014320848035Open ↗
06/03/2014320848035Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/08/2017320848035Open ↗
09/12/2014321160710Open ↗
07/01/2014320347255Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
12/30/2020322044364Open ↗
03/13/2020322044364Open ↗
02/20/2019321843742Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET8
03/13/2020322044364Open ↗
09/26/2018321843742Open ↗
05/18/2015321131226Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
04/03/2020322044364Open ↗
06/28/2019320364119Open ↗
02/20/2019321843742Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
12/31/2020322044364Open ↗
11/15/2018321033804Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
04/29/2015320848035Open ↗
03/25/2014320848035Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/03/2017320848035Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01290825-I1Open ↗