← Back
Three families
53 EAST 31 STREET
BROOKLYN · East Flatbush-Erasmus · BIN 3109310
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R6Zoning
2,048 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,000 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof1 filing · 6 docs
Floor 22p · 2 filings · 11 docs
Floor 12p · 2 filings · 11 docs
Cellar2p · 2 filings · 11 docs
Site & exterior1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELITE PROPERTIES NYC807/08/2026
ELITE PROPERTIES NYC HOMES LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/04/2023$661K—— → —$323/sf building
12/29/2022$1.1M—— → —$536/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC ENGINEERING PC201/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINLI.CONSTRUCTION LLCGeneral Contractor303/21/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC6692101/31/2024
Building Lifecycle
All (90)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Inspection (5)Special Inspection (19)
05/04/2026
Violation issued (HPD, closed)
A
11/20/2025
Violation issued (HPD, closed)
I
06/09/2025
Violation issued (HPD, closed)
A
05/30/2024
Signed off — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, BEDROOM AT CELLAR. RESTORE BACK TO PRIOR LEGAL CONDITIONS. REMEDY ECB VIOLATION # 34866942M. REPLACE EXISTING PLUMBING FIXTURES IN CONJUNCTION WITH GC/MS APPLICATION #: B00996821.
B00996825-I1
05/24/2024
Signed off — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, BEDROOM AT CELLAR. REMEDY ECB VIOLATION # 34866942M. INTERIOR RENOVATION OF (3) FAMILY HOUSE WITH MECHANICAL WORK. REPAIR DETERIORATED METAL CORNICE AT ROOF PARAPET WALL.
B00996821-I1
05/23/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/05/2024
Permit issued — Mechanical Systems
B00996821-I1-GC-CX
02/02/2024
Permit issued — Plumbing
B00996825-I1-PL
01/31/2024
Filed — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, BEDROOM AT CELLAR. RESTORE BACK TO PRIOR LEGAL CONDITIONS. REMEDY ECB VIOLATION # 34866942M. REPLACE EXISTING PLUMBING FIXTURES IN CONJUNCTION WITH GC/MS APPLICATION #: B00996821.
B00996825-I1
01/31/2024
Filed — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, BEDROOM AT CELLAR. REMEDY ECB VIOLATION # 34866942M. INTERIOR RENOVATION OF (3) FAMILY HOUSE WITH MECHANICAL WORK. REPAIR DETERIORATED METAL CORNICE AT ROOF PARAPET WALL.
B00996821-I1
01/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
01/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
01/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
01/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
01/30/2024
Special inspection requirement — Air barrier - visual inspection
XIU CHEN
01/30/2024
Special inspection requirement — Fenestration air leakage
XIU CHEN
01/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
01/30/2024
Special inspection requirement — Duct leakage testing, insulation and design
XIU CHEN
01/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
01/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
XIU CHEN
01/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
01/30/2024
Special inspection requirement — Interior lighting power
XIU CHEN
01/30/2024
Special inspection requirement — Maintenance information
XIU CHEN
01/30/2024
Special inspection requirement — Fenestration areas
XIU CHEN
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
01/30/2024
Special inspection requirement — Maintenance information
XIU CHEN
01/26/2024
Special inspection requirement — Final
XIU CHEN
01/26/2024
Special inspection requirement — Mechanical Systems
XIU CHEN
11/21/2023
Violation issued (HPD, closed)
I
03/22/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
A
08/01/2017
Violation issued (HPD, closed)
I
10/08/2015
Violation issued (HPD, closed)
I
02/18/2015
Violation issued (HPD, closed)
I
08/13/2014
Violation issued (HPD, closed)
C
08/05/2014
Violation issued (HPD, closed)
I
07/15/2014
Violation issued (HPD, closed)
C
07/15/2014
Violation issued (HPD, closed)
C
07/15/2014
Violation issued (HPD, closed)
C
07/15/2014
Violation issued (HPD, closed)
C
07/15/2014
Violation issued (HPD, closed)
C
04/28/2014
Violation issued (HPD, closed)
C
04/28/2014
Violation issued (HPD, closed)
B
04/28/2014
Violation issued (HPD, closed)
B
04/28/2014
Violation issued (HPD, closed)
C
04/28/2014
Violation issued (HPD, closed)
C
04/28/2014
Violation issued (HPD, closed)
C
02/10/2014
Violation issued (HPD, closed)
C
02/10/2014
Violation issued (HPD, closed)
C
02/10/2014
Violation issued (HPD, closed)
C
01/28/2014
Violation issued (HPD, closed)
C
01/07/2014
Violation issued (HPD, closed)
C
01/07/2014
Violation issued (HPD, closed)
C
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offXINLI.CONSTRUCTION LLC02/05/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/02/2024
BISOTISSUEDEASTERN GENERAL CONSTRUCT10/23/2014
1 project · most recent 10/25/2023
General Wiring
FiledStatusContractorScope
10/25/2023Permit IssuedAPPROVED ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/30/2024HVAC-R and service water heating equipmentXIU CHENenergy_progress
01/30/2024Fire-Resistant Penetrations and JointsXIU CHENspecial
01/30/2024HVAC-R and service water heating system controlsXIU CHENenergy_progress
01/30/2024HVAC-R and service water piping design and insulationXIU CHENenergy_progress
01/30/2024Energy Code Compliance InspectionsXIU CHENprogress
01/30/2024Air barrier - visual inspectionXIU CHENenergy_progress
01/30/2024Fenestration air leakageXIU CHENenergy_progress
01/30/2024HVAC-R and service water heating system controlsXIU CHENenergy_progress
01/30/2024Duct leakage testing, insulation and designXIU CHENenergy_progress
01/30/2024HVAC-R and service water heating equipmentXIU CHENenergy_progress
01/30/2024Fenestration and door U-factor and product ratingsXIU CHENenergy_progress
01/30/2024HVAC-R and service water piping design and insulationXIU CHENenergy_progress
01/30/2024Interior lighting powerXIU CHENenergy_progress
01/30/2024Maintenance informationXIU CHENenergy_progress
01/30/2024Fenestration areasXIU CHENenergy_progress
01/30/2024Energy Code Compliance InspectionsXIU CHENprogress
01/30/2024Maintenance informationXIU CHENenergy_progress
01/26/2024FinalXIU CHENprogress
01/26/2024Mechanical SystemsXIU CHENspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00996821-I1Request digital key ↗
08/26/2026B00996825-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/21/2024340179452Open ↗
10/13/2014340179452Open ↗
▸BISWORK PERMIT APPLICATION1
10/13/2014340179452Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00996825-I1Open ↗
09/01/2026B00996825-I1Open ↗
08/25/2026B00996821-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00996821-I1Open ↗
08/26/2026B00996825-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/13/2014340179452Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/13/2014340179452Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/13/2014340179452Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B00996821-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00996821-I1Open ↗
08/26/2026B00996825-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/13/2014340179452Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/13/2014340179452Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/13/2014340179452Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/13/2014340179452Open ↗