← Back
Over six families without stores
Ft Greene
53 ST FELIX STREET · Fort Greene · BIN 3326132
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6BZoning
27,530 sfGross Floor Area
32Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Over six families without stores · Owner of record: FT GREENE TB HOUSING DEVELOPMENT FUND CO RPORATION · 11,990 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 33p · 2 filings · 16 docs
Floor 22p · 1 filing · 7 docs
Floor 11p · 1 filing · 9 docs
Basement3p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BLOCK ASSOCIATES103/22/2026
TRI BLOCK FTG LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLADO ENGINEERING309/16/2025
CTA ARCHITECTS108/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MDG DESIGN & CONSTR LLCGeneral Contractor104/09/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004209/09/2024
Building Lifecycle
All (87)Filed (4)Permit Issued (2)Signed Off (2)Violation (31)Inspection (2)Objection (40)Special Inspection (6)
01/02/2026
Violation issued (HPD, open)
C
12/18/2025
Signed off — Alteration
Replacing plumbing fixtures on existing roughing as per plans filed herewith. No change to use, egress, or occupancy.
B01094312-I1
12/05/2025
Signed off — Alteration
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
B01063389-I1
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/26/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/22/2025
Objection raised — Plumbing
09/22/2025
Objection raised — Cost
09/16/2025
Filed — Alteration
Replacing plumbing fixtures on existing roughing as per plans filed herewith. No change to use, egress, or occupancy.
B01094312-P2
06/12/2025
Violation issued (HPD, closed)
A
06/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Filed — Alteration
Replacing plumbing fixtures on existing roughing as per plans filed herewith. No change to use, egress, or occupancy.
B01094312-P1
01/31/2025
Permit issued — Plumbing
B01094312-I1-PL
01/30/2025
Permit issued — General Construction
B01063389-I1-GC
10/30/2024
Objection resolved — Addressed
10/23/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
10/04/2024
Objection resolved — Addressed
10/04/2024
Objection resolved — Addressed
09/30/2024
Objection raised — Scope
09/25/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/10/2024
Objection raised — Scope
09/10/2024
Objection raised — Admin
09/10/2024
Objection raised — Energy
09/10/2024
Objection raised — Admin
09/10/2024
Objection raised — Scope
09/10/2024
Objection raised — Structural
09/10/2024
Objection raised — Admin
09/10/2024
Objection raised — Inspections
09/10/2024
Objection raised — Fire_Protection
09/09/2024
Filed — Alteration
Replacing plumbing fixtures on existing roughing as per plans filed herewith. No change to use, egress, or occupancy.
B01094312-I1
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Other
08/20/2024
Filed — Alteration
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
B01063389-I1
08/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
08/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
08/05/2024
Special inspection requirement — Final
Christa Waring
08/05/2024
Special inspection requirement — Interior lighting power
ERIC BERLENT
08/05/2024
Special inspection requirement — Lighting in dwelling units
ERIC BERLENT
08/05/2024
Special inspection requirement — Lighting controls
ERIC BERLENT
10/11/2022
Violation issued (HPD, closed)
B
10/11/2022
Violation issued (HPD, closed)
C
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP01/31/2025
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC01/30/2025
1 project · most recent 06/19/2025
General Wiring
FiledStatusContractorScope
06/19/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/12/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
08/05/2024Tenant Protection Plan ComplianceERIC BERLENTspecial
08/05/2024FinalChrista Waringprogress
08/05/2024Interior lighting powerERIC BERLENTenergy_progress
08/05/2024Lighting in dwelling unitsERIC BERLENTenergy_progress
08/05/2024Lighting controlsERIC BERLENTenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01094312-P2Request digital key ↗
08/24/2026B01094312-P1Request digital key ↗
08/24/2026B01094312-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01094312-P2Open ↗
08/24/2026B01094312-P1Open ↗
08/24/2026B01094312-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B01063389-I1Open ↗
08/22/2026B01063389-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026B01063389-I1Open ↗
08/22/2026B01063389-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01094312-P2Open ↗
08/24/2026B01094312-P1Open ↗
08/24/2026B01094312-I1Open ↗
Showing 3 of 4 on file for this type