← Back
Single or multiple dwelling with stores or offices
53 VICTORY BOULEVARD
STATEN ISLAND · BIN 5000216
💬 Discuss this project
1900Year Built
3Stories
S9Building Class
C4-2Zoning
3,144 sfGross Floor Area
4Units
Single or multiple dwelling with stores or offices · Owner of record: 53 VICTORY LLC · 2,500 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATES MANAGEMENT1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE506/02/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGG NY PLUMBING, INCPlumbing207/08/2026
HUDSON CONTRACTING GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683304/16/2025
Building Lifecycle
All (30)Filed (5)Permit Issued (3)Signed Off (3)Inspection (7)Special Inspection (12)
06/09/2025
Signed off — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-I1
06/06/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
06/02/2025
Filed — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-P2
05/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
05/09/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/05/2025
Signed off — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-S1
05/05/2025
Signed off — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-S2
04/28/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/18/2025
Permit issued — Boiler Equipment
S01102658-S2-BE
04/16/2025
Filed — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-S2
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
04/10/2025
Special inspection requirement — Heating Systems
Frank Martarella III
04/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
04/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
04/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
03/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/31/2025
Filed — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-P1
01/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
01/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
01/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
01/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
12/30/2024
Permit issued — Plumbing
S01102658-S1-PL
12/02/2024
Permit issued — General Construction
S01102658-I1-GC
11/27/2024
Filed — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-I1
11/27/2024
Filed — Alteration
APPLICATION IS FILED FOR THE BOILER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF EXISTING 3-STORY MIXED-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. ALL PLANS SUBMITTED HEREWITH.
S01102658-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offGREGG NY PLUMBING, INC04/18/2025
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC12/30/2024
DOB NOWGeneral ConstructionSigned-offHUDSON CONTRACTING GROUP12/02/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/28/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/04/2025Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
05/23/2025Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
04/10/2025Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
04/10/2025Heating SystemsFrank Martarella IIIspecial
04/10/2025HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
04/10/2025HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
04/10/2025HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
01/30/2025Energy Code Compliance InspectionsFrank Martarella IIIprogress
01/30/2025HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
01/30/2025HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
01/30/2025HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
01/30/2025Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026S01102658-S2Request digital key ↗
08/19/2026S01102658-P2Request digital key ↗
08/19/2026S01102658-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026S01102658-S2Open ↗
09/01/2026S01102658-I1Open ↗
08/31/2026S01102658-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026S01102658-S1Open ↗
08/13/2026S01102658-S2Open ↗
08/13/2026S01102658-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026S01102658-S2Open ↗
08/31/2026S01102658-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026S01102658-P1Open ↗
08/13/2026S01102658-S2Open ↗
08/13/2026S01102658-S1Open ↗
Showing 3 of 5 on file for this type