← Back
Professional building / stand-alone funeral home
530 5 AVENUE
BROOKLYN · BIN 3023413
💬 Discuss this project
1915Year Built
2Stories
O7Building Class
C4-3AZoning
4,719 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: BROOKLYN RAINBOW ASSOCIATES · 2,446 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAVERICK MANAGEMENT607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCORD CONSULTING ENGINEERING PC209/13/2021
EUGENE KHANANOV AIA112/31/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE MECHANICAL CORGeneral Contractor107/08/2026
RITE WAY PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEEL CORE ENGINEERING PL1098105/13/2021
EUGENE KHANANOV ARCHITECT2816112/31/2019
Building Lifecycle
All (18)Filed (3)Permit Issued (2)Signed Off (2)Violation (2)Special Inspection (9)
11/11/2021
Signed off — Alteration
Installation of new air conditioning system for tenant fit out in existing commercial space
B00522123-I1
09/29/2021
Permit issued — Mechanical Systems
B00522123-I1-MS
09/13/2021
Filed — Alteration
Installation of new air conditioning system for tenant fit out in existing commercial space
B00522123-P1
09/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/13/2021
Special inspection requirement — Mechanical Systems
09/13/2021
Special inspection requirement — Final
09/13/2021
Special inspection requirement — Electrical motors and elevators
09/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
09/13/2021
Special inspection requirement — Ventilation and air distribution system
09/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
09/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
09/13/2021
Special inspection requirement — Maintenance information
05/13/2021
Filed — Alteration
Installation of new air conditioning system for tenant fit out in existing commercial space
B00522123-I1
11/04/2020
Signed off — Alteration
B00287508-I1
01/03/2020
Permit issued — Plumbing
B00287508-I1-PL
12/31/2019
Filed — Alteration
B00287508-I1
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offINNOVATIVE MECHANICAL COR09/29/2021
DOB NOWPlumbingSigned-offRITE WAY PLUMBING & HEATING01/03/2020
BISOTISSUEDEUROREMONT INC01/03/2020
BISOTISSUEDSTRUCTURETECH ENGINEERING05/22/2015
BISMHISSUEDDANIEL GROUP ARCH01/28/2005
1 project · most recent 02/13/2020
General Wiring
FiledStatusContractorScope
02/13/2020CompleteLENS ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/13/2021Fire-Resistant Penetrations and Joints—special
09/13/2021Mechanical Systems—special
09/13/2021Final—progress
09/13/2021Electrical motors and elevators—energy_progress
09/13/2021HVAC-R and service water piping design and insulation—energy_progress
09/13/2021Ventilation and air distribution system—energy_progress
09/13/2021HVAC-R and service water heating system controls—energy_progress
09/13/2021HVAC-R and service water heating equipment—energy_progress
09/13/2021Maintenance information—energy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/01/2026B00522123-I1Request digital key ↗
09/01/2026B00522123-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00287508-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸BISWORK PERMIT APPLICATION2
01/07/2020322019846Open ↗
05/27/2015321135455Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/24/2019322019846Open ↗
07/16/2015321135455Open ↗
05/27/2015321135455Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00522123-P1Open ↗
09/01/2026B00522123-I1Open ↗
08/13/2026B00287508-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/24/2019322019846Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00287508-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/24/2019322019846Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2021322019846Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/18/2021322019846Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00522123-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/18/2021322019846Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/22/2021322019846Open ↗
09/15/2015321135455Open ↗
09/15/2015321135455Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/15/2015321135455Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/24/2019322019846Open ↗
07/16/2015321135455Open ↗
05/27/2015321135455Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/18/2021322019846Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸Other Documents1
▸BISOP-4 - Special Report1
09/15/2015321135455Open ↗