← Back
BuildNYC
Professional building / stand-alone funeral home
530 5TH AVENUE
BROOKLYN · Park Slope · BIN 3023413
💬 Discuss this project
1915Year Built
2Stories
O7Building Class
C4-3AZoning
4,719 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: Brooklyn Rainbow Associates · 2,446 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Diamond Braces8p · 2 filings · 8 docs
Floor 1Diamond Braces8p · 2 filings · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Concord Associates209/13/2021
Eugene Khananov AIA112/31/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Innovative Mechanicalspecialty_contractor107/08/2026
Rite Way Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steel Core Engineering PL1098105/13/2021
Eugene Khananov Architect2816112/31/2019
Building Lifecycle
All (18)Filed (3)Permit Issued (2)Signed Off (2)Violation (2)Special Inspection (9)
11/11/2021
Signed off — Alteration
Installation of new air conditioning system for tenant fit out in existing commercial space
B00522123-I1
09/29/2021
Permit issued — Mechanical Systems
B00522123-I1-MS
09/13/2021
Filed — Alteration
Installation of new air conditioning system for tenant fit out in existing commercial space
B00522123-P1
09/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/13/2021
Special inspection requirement — Mechanical Systems
09/13/2021
Special inspection requirement — Final
09/13/2021
Special inspection requirement — Electrical motors and elevators
09/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
09/13/2021
Special inspection requirement — Ventilation and air distribution system
09/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
09/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
09/13/2021
Special inspection requirement — Maintenance information
05/13/2021
Filed — Alteration
Installation of new air conditioning system for tenant fit out in existing commercial space
B00522123-I1
11/04/2020
Signed off — Alteration
B00287508-I1
01/03/2020
Permit issued — Plumbing
B00287508-I1-PL
12/31/2019
Filed — Alteration
B00287508-I1
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offInnovative Mechanical09/29/2021
DOB NOWPlumbingSigned-offRite Way Plumbing & Heating01/03/2020
BISOTISSUEDEuroremont01/03/2020
BISOTISSUEDStructuretech Engineering05/22/2015
BISMHISSUEDDaniel Group Arch01/28/2005
1 project · most recent 02/13/2020
General Wiring
FiledStatusContractorScope
02/13/2020CompleteLens ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/13/2021Fire-Resistant Penetrations and Joints—special
09/13/2021Mechanical Systems—special
09/13/2021Final—progress
09/13/2021Electrical motors and elevators—energy_progress
09/13/2021HVAC-R and service water piping design and insulation—energy_progress
09/13/2021Ventilation and air distribution system—energy_progress
09/13/2021HVAC-R and service water heating system controls—energy_progress
09/13/2021HVAC-R and service water heating equipment—energy_progress
09/13/2021Maintenance information—energy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Diamond BracesMedical / HealthcareFloors 1, 2
Project B00522123 Alteration · LOC Issued · 05/13/2021
Project B00287508 Alteration · LOC Issued · 12/31/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/01/2026B00522123-I1Request digital key ↗
09/01/2026B00522123-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00287508-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸BISWORK PERMIT APPLICATION2
01/07/2020322019846Open ↗
05/27/2015321135455Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/24/2019322019846Open ↗
07/16/2015321135455Open ↗
05/27/2015321135455Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00522123-P1Open ↗
09/01/2026B00522123-I1Open ↗
08/13/2026B00287508-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/24/2019322019846Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00287508-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/24/2019322019846Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2021322019846Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/18/2021322019846Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00522123-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/18/2021322019846Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/22/2021322019846Open ↗
09/15/2015321135455Open ↗
09/15/2015321135455Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/15/2015321135455Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/24/2019322019846Open ↗
07/16/2015321135455Open ↗
05/27/2015321135455Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/18/2021322019846Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
12/24/2019322019846Open ↗
05/27/2015321135455Open ↗
▸Other Documents1
▸BISOP-4 - Special Report1
09/15/2015321135455Open ↗