Multi-story retail building (2+)
530 BAY STREET
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5013431
💬 Discuss this project
1956Year Built
2Stories
K2Building Class
C4-2Zoning
11,100 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: FIRST 530-536 BAY STREET, LLC. · 8,750 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 35p · 1 filing · 10 docs
Floor 217p · 2 filings · 20 docs
Floor 112p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRST 530-536 BAY STREET LLC3307/08/2026
FIRST 530 BAYST203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.905/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SALON VTLN INSTALLER & DEGeneral Contractor1407/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781905/09/2023
Building Lifecycle
All (92)Filed (9)Permit Issued (8)Signed Off (2)Violation (39)Inspection (6)Special Inspection (28)
03/04/2026
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (FDNY_NOV, closed)
04/22/2025
Violation issued (FDNY_NOV, closed)
12/27/2024
Violation issued (FDNY_NOV, closed)
01/29/2024
Violation issued (FDNY_NOV, closed)
09/25/2023
Signed off — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-I1
09/25/2023
Signed off — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-S1
09/20/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/26/2023
Violation issued (FDNY_NOV, closed)
07/06/2023
Permit issued — General Construction
S00632534-I1-GC
07/06/2023
Permit issued — General Construction
S00613257-I1-GC-CX
07/06/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/09/2023
Filed — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-P5
05/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
05/09/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
05/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/08/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
05/08/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
05/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
05/08/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
05/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
05/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
05/06/2023
Filed — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-P4
04/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/08/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/21/2023
Filed — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-P3
02/21/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/27/2023
Permit issued — Plumbing
S00613257-S1-PL
11/17/2022
Violation issued (FDNY_NOV, closed)
04/18/2022
Permit issued — Mechanical Systems
S00613257-I1-GC-CX
04/18/2022
Permit issued — General Construction
S00632534-I1-GC
01/06/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/29/2021
Filed — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-P2
12/09/2021
Filed — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-P1
12/02/2021
Permit issued — General Construction
S00632534-I1-GC
12/02/2021
Permit issued — Plumbing
S00613257-S1-PL
11/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/26/2021
Filed — Alteration
INTERIOR RENOVATION AT 2ND FLOOR AND 3RD FLOOR OF EXISTING 3 STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00632534-P1
11/26/2021
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/20/2021
Permit issued — General Construction
S00613257-I1-GC-CX
11/19/2021
Filed — Alteration
INTERIOR RENOVATION AT 2ND FLOOR AND 3RD FLOOR OF EXISTING 3 STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00632534-I1
11/17/2021
Filed — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-I1
11/17/2021
Filed — Alteration
PLUMBING WORK AT FIRST FLOOR BEAUTY SALON AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00613257-S1
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSALON VTLN INSTALLER & DE07/06/2023
DOB NOWGeneral ConstructionSigned-offSALON VTLN INSTALLER & DE07/06/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.01/27/2023
DOB NOWMechanical SystemsSigned-offSALON VTLN INSTALLER & DE04/18/2022
DOB NOWGeneral ConstructionPermit IssuedSALON VTLN INSTALLER & DE04/18/2022
DOB NOWGeneral ConstructionPermit IssuedSALON VTLN INSTALLER & DE12/02/2021
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/02/2021
DOB NOWGeneral ConstructionSigned-offSALON VTLN INSTALLER & DE11/20/2021
BISPLISSUEDCAPITAL CONTR P&H CORP10/17/2018
BISMHISSUEDPROPERLY ORGANIZED TIMBER03/18/2010
BIS—ISSUEDHOME IMPROVEMENT SPECIALI02/24/2009
BISEQISSUEDHOME IMPROVEMENT SPECIALI02/24/2009
BISEQISSUEDPROPERLY ORGANIZED TIMBER07/31/2008
BISEQISSUEDPROPERLY ORGANIZED TIMBER07/31/2008
BISEQISSUEDPROPERLY ORGANIZED TIMBER06/26/2008
BISOTISSUEDPROPERLY ORGANIZED TIMBER05/02/2008
BISOTISSUEDH R G CONTRACTING06/22/2007
BISMHISSUEDRICHMOND CONTRACTING CO.,INC12/17/2002
BIS—ISSUEDSTATE SECURITY INC.05/16/1997
BISSPISSUEDJOHN THOMSON INC.07/19/1991
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/20/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
04/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/08/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/06/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/09/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/09/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
05/09/2023Lighting controlsCHRISTIAN LOZADAenergy_progress
05/09/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
05/09/2023Mechanical SystemsCHRISTIAN LOZADAspecial
05/09/2023FinalCHRISTIAN LOZADAprogress
05/09/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/09/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/09/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
05/09/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
05/08/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/08/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/08/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
05/08/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
05/08/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
05/08/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
05/08/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/21/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
02/21/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/21/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/21/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
02/21/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/21/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/21/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
11/29/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
Latest 25 of 28.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026S00632534-I1Request digital key ↗
08/25/2026S00632534-P1Request digital key ↗
08/23/2026S00613257-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION15
10/10/2018520350030Open ↗
05/18/2010510033143Open ↗
03/15/2010510033143Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION12
10/18/2018520350030Open ↗
03/18/2010520022038Open ↗
04/02/2009510033143Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
12/28/2009510033143Open ↗
06/22/2009510033143Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
05/27/2010510033143Open ↗
▸Seals & Professional Certifications50
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
02/28/2019520350030Open ↗
05/28/2010510033143Open ↗
05/27/2010510033143Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026S00632534-I1Open ↗
08/25/2026S00632534-P1Open ↗
08/23/2026S00613257-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026S00613257-I1Open ↗
09/02/2026S00613257-I1Open ↗
08/28/2026S00613257-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/10/2018520350030Open ↗
02/06/2009510007083Open ↗
01/08/2009510033143Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026S00613257-I1Open ↗
08/28/2026S00613257-S1Open ↗
08/27/2026S00632534-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
07/25/2008510048743Open ↗
07/25/2008510048734Open ↗
04/18/2008510033143Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/10/2018520350030Open ↗
▸BISPC FULL REPORT1
06/21/2007510007083Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
06/21/2007510007083Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING6
03/15/2010510033143Open ↗
12/15/2009510033143Open ↗
05/11/2009510033143Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/13/2010520022038Open ↗
11/02/2009520022038Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/10/2018520350030Open ↗
▸BISEQUIPMENT USE PERMITS1
04/13/2010520022038Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/13/2009510033143Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/20/2008510033143Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026S00632534-P1Open ↗
08/25/2026S00632534-I1Open ↗
08/23/2026S00613257-P5Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/25/2008510048743Open ↗
07/25/2008510048734Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/18/2008510033143Open ↗
06/21/2007510007083Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026S00613257-S1Open ↗
08/13/2026S00613257-I1Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
02/28/2019520350030Open ↗
05/27/2010510033143Open ↗
04/13/2010510048743Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
10/10/2018520350030Open ↗
11/02/2009520022038Open ↗
07/25/2008510048743Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/11/2008510033143Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/17/2008510033143Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
02/28/2019520350030Open ↗
10/10/2018520350030Open ↗
05/27/2010510033143Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
10/10/2018520350030Open ↗
11/02/2009520022038Open ↗
07/25/2008510048743Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
05/28/2010510033143Open ↗
05/27/2010510033143Open ↗
12/07/2009510033143Open ↗
▸BISBOROUGH INTAKE FORM1
02/28/2019520350030Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/13/2010510048743Open ↗
04/13/2010510048734Open ↗
10/13/2009510033143Open ↗
▸BISPLOT DIAGRAM1
04/18/2008510033143Open ↗