Roof7p · 8 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
East Elevation Facade Repairs. No change in use, egress or occupancy
On file for this job
4 documents · 1 drawing sheet
INTERIOR RENOVATION WORK AT GROUND FLOOR AND CELLAR LEVEL RETAIL SPACES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this job
28 documents · 1 drawing sheet
Filing mechanical work for 4th-5th fl tenant build out, including demo of ex. mechanical ductwork/equipment. Installation of AC/OA units and associated ducting/piping at 4th fl. Installation of (3) new VRF units at roof. No change of use/egress/occupancy.
On file for this job
14 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 115p · 5 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 1 drawing sheet
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications/infills. Steel dunnage for mechanical equipment at roof per Alteration #M00810497.
On file for this job
18 documents · 2 drawing sheets
Int. demo work at 4-11 fl office spaces to remove tenant work and/or ex. stairs/misc. work. Prop. infill of floor openings at 4-11 fl. Filed in assoc. with Alt 1 #120942757. 4 fl tenant build-out filed under Alt GC #M00840313. No change of use/egress/occ.
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 106p · 6 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 1 drawing sheet
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications/infills. Steel dunnage for mechanical equipment at roof per Alteration #M00810497.
On file for this job
18 documents · 2 drawing sheets
Int. demo work at 4-11 fl office spaces to remove tenant work and/or ex. stairs/misc. work. Prop. infill of floor openings at 4-11 fl. Filed in assoc. with Alt 1 #120942757. 4 fl tenant build-out filed under Alt GC #M00840313. No change of use/egress/occ.
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 97p · 5 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 2 drawing sheets
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications/infills. Steel dunnage for mechanical equipment at roof per Alteration #M00810497.
On file for this job
18 documents · 3 drawing sheets
Int. demo work at 4-11 fl office spaces to remove tenant work and/or ex. stairs/misc. work. Prop. infill of floor openings at 4-11 fl. Filed in assoc. with Alt 1 #120942757. 4 fl tenant build-out filed under Alt GC #M00840313. No change of use/egress/occ.
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 85p · 5 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 1 drawing sheet
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications/infills. Steel dunnage for mechanical equipment at roof per Alteration #M00810497.
On file for this job
18 documents · 2 drawing sheets
Int. demo work at 4-11 fl office spaces to remove tenant work and/or ex. stairs/misc. work. Prop. infill of floor openings at 4-11 fl. Filed in assoc. with Alt 1 #120942757. 4 fl tenant build-out filed under Alt GC #M00840313. No change of use/egress/occ.
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 712p · 9 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 2 drawing sheets
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications/infills. Steel dunnage for mechanical equipment at roof per Alteration #M00810497.
On file for this job
18 documents · 3 drawing sheets
Int. demo work at 4-11 fl office spaces to remove tenant work and/or ex. stairs/misc. work. Prop. infill of floor openings at 4-11 fl. Filed in assoc. with Alt 1 #120942757. 4 fl tenant build-out filed under Alt GC #M00840313. No change of use/egress/occ.
On file for this job
21 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 65p · 4 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 1 drawing sheet
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications/infills. Steel dunnage for mechanical equipment at roof per Alteration #M00810497.
On file for this job
18 documents · 3 drawing sheets
Int. demo work at 4-11 fl office spaces to remove tenant work and/or ex. stairs/misc. work. Prop. infill of floor openings at 4-11 fl. Filed in assoc. with Alt 1 #120942757. 4 fl tenant build-out filed under Alt GC #M00840313. No change of use/egress/occ.
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 513p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Filing mechanical work for 4th-5th fl tenant build out, including demo of ex. mechanical ductwork/equipment. Installation of AC/OA units and associated ducting/piping at 4th fl. Installation of (3) new VRF units at roof. No change of use/egress/occupancy.
On file for this job
14 documents · 1 drawing sheet
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 4 drawing sheets
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications/infills. Steel dunnage for mechanical equipment at roof per Alteration #M00810497.
On file for this job
18 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 415p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
Filing mechanical work for 4th-5th fl tenant build out, including demo of ex. mechanical ductwork/equipment. Installation of AC/OA units and associated ducting/piping at 4th fl. Installation of (3) new VRF units at roof. No change of use/egress/occupancy.
On file for this job
14 documents · 2 drawing sheets
Filing plumbing/sprinkler work for 4th-11th fl office spaces. Removal of plumbing fixtures at 4th-5th fl as shown on plans. Installation, relocation and removal of sprinkler heads at 4th-11th fl as shown on plans. No change in use, egress or occupancy.
On file for this job
18 documents · 3 drawing sheets
Int. demo work at 4-11 fl office spaces to remove tenant work and/or ex. stairs/misc. work. Prop. infill of floor openings at 4-11 fl. Filed in assoc. with Alt 1 #120942757. 4 fl tenant build-out filed under Alt GC #M00840313. No change of use/egress/occ.
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 312p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Filing plumbing/sprinkler work for 2nd-3rd floor tenant build out. Installation of plumbing fixtures and water heaters, as shown on plans. Installation, relocation and removal of sprinkler heads, as shown on plans. No change in use, egress or occupancy.
On file for this job
9 documents · 2 drawing sheets
Filing mechanical work for 2nd-3rd floor tenant build out. Installation of AC/OA units and associated ducting/piping/supply/exhaust at 2nd-3rd floors. Installation of (6) new VRF units at roof. No change in use, egress or occupancy.
On file for this job
14 documents · 2 drawing sheets
Removal/relocation of sprinkler heads, and installation of new sprinkler heads, as shown on plans. Removal of plumbing fixtures/equipment and associated piping, as shown on plans.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 211p · 7 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
INTERIOR RENOVATION WORK AT GROUND FLOOR AND CELLAR LEVEL RETAIL SPACES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this job
28 documents · 1 drawing sheet
Filing plumbing/sprinkler work for 2nd-3rd floor tenant build out. Installation of plumbing fixtures and water heaters, as shown on plans. Installation, relocation and removal of sprinkler heads, as shown on plans. No change in use, egress or occupancy.
On file for this job
9 documents · 2 drawing sheets
Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor modifications. Steel dunnage for mechanical equipment at roof per approved Alteration #M00688169.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 116p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Construction Fence
INTERIOR RENOVATION WORK AT GROUND FLOOR AND CELLAR LEVEL RETAIL SPACES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this job
28 documents · 6 drawing sheets
REMOVAL OF SPRINKLER HEADS; REPLACEMENT SPRINKLER HEADS TO PROVIDE CODE SPRINKLER COVERAGE OF NEW ARCHITECTURAL LAYOUT FILED UNDER SEPARATE APPLICATION
On file for this job
8 documents · 1 drawing sheet
INSTALLATION OF NEW 2 HR FIRE RATED DEMISING WALL AND 90 MIN. FIRE RATED EGRESS DOOR AT EXISTING FIRST FLOOR RETAIL SPACE
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Cellar27p · 14 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
INTERIOR RENOVATION WORK AT GROUND FLOOR AND CELLAR LEVEL RETAIL SPACES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this job
28 documents · 8 drawing sheets
Interior demolition for new convenience door opening. No change of use, egress, or occupancy.
On file for this job
13 documents · 2 drawing sheets
Modification and demolition of existing plumbing and sprinkler work at ground floor retail spaces, as shown on plans. No change of use, egress, or occupancy.
On file for this job
14 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.