BuildNYC
Condo, cultural / medical / educational
Nyu Medical Center Condominium
530 FIRST AVENUE · BIN 1081694
💬 Discuss this project
1900Year Built
—Stories
RABuilding Class
R8Zoning
2,216,199 sfGross Floor Area
8Units
LL97 CoveredRent Stabilized27 Active Violations 24 unresolved · 3 paperwork only ▸FISP: SWARMP
Condo, cultural / medical / educational · 362,642 sf lot · 6.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNYU Langone Health, Schwartz Health Care CenterUnder Construction47p · 6 filings · 18 docs
PenthouseCompassUnder Construction1p · 1 filing · 7 docs
Floor 16Construction hoist complex installation2p · 1 filing · 6 docs
Floor 15NYU Langone HealthUnder Construction3p · 1 filing · 16 docs
Floor 14Compass, NYU Langone HealthUnder Construction56p · 3 filings · 18 docs
Floor 13CompassUnder Construction10p · 1 filing · 7 docs
Floor 12NYU Langone HealthUnder Construction33p · 3 filings · 18 docs
Floor 11CompassUnder Construction10p · 1 filing · 7 docs
Floor 10CompassUnder Construction10p · 1 filing · 7 docs
Floor 9Construction hoist complex installation1p · 1 filing · 6 docs
Floor 8Schwartz Health Care Center, NYU Langone HealthUnder Construction65p · 10 filings · 16 docs
Floor 7NYU Langone Health111p · 9 filings · 16 docs
Floor 6NYU Langone HealthUnder Construction113p · 10 filings · 16 docs
Floor 5NYU Langone HealthUnder Construction110p · 11 filings · 16 docs
Floor 4NYU Langone Health, NYU La HealthUnder Construction143p · 13 filings · 17 docs
Floor 3NYU Langone Health, NYU La HealthUnder Construction108p · 10 filings · 16 docs
Floor 2Compass, NYU Langone HealthUnder Construction171p · 11 filings · 16 docs
Floor 1Schwartz Health Care Center, Compass +2Under Construction188p · 21 filings · 14 docs
CellarNYU Langone Health, Schwartz Health Care Center +2Under Construction204p · 20 filings · 18 docs
Sub-CellarNYU Langone Health, Schwartz Health Care Center70p · 7 filings · 17 docs
Site & exteriorSchwartz Health Care CenterUnder Construction21p · 8 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYU School of Medicine2203/21/2026
NYU803/21/2026
550 1 AVE203/21/2026
NYU Medical Center Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants14203/21/2026
AE Design Solution1203/21/2026
Eurocelt Expediting2003/21/2026
KM Associates of New York303/21/2026
RPO203/21/2026
K & M Associates303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consigli Construction CoGeneral Contractor5407/08/2026
Lendlease (US) ConstructionGeneral Contractor5307/08/2026
Universal Builders SupplyScaffold2410/04/2026
Current Fire ProtectionFire Protection2307/08/2026
Nelson Air DeviceGeneral Contractor2307/08/2026
Alliance PlumbingPlumbing1407/08/2026
Sirina Fire ProtectionFire Protection1307/08/2026
B.R. Fries & AssociatesGeneral Contractor1007/08/2026
Cardoza PlumbingPlumbing807/08/2026
Benjamin ConstructionGeneral Contractor809/15/2026
Pace PlumbingPlumbing707/08/2026
Eagle Scaffolding ServicesScaffold607/08/2026
Sirina Fire ProtectionPlumbing603/22/2026
Ashlar MechanicalFire Protection407/08/2026
Gilston Electrical ContngElectrical303/22/2026
Tri-State DismantlingScaffold307/08/2026
NYC Fire SprinklerFire Protection309/12/2026
Egg ElectricElectrical103/22/2026
Empire General ContractingGeneral Contractor107/14/2026
Erg Electric CoElectrical103/21/2026
PJP InstallersScaffold107/08/2026
Dooley Electric CoElectrical103/21/2026
Gilston Electrical ContngElectrical103/21/2026
Bigman BrothersElectrical103/21/2026
H & D Electric CoElectrical103/21/2026
Unity Electric CoElectrical103/21/2026
Millennium Maintenance & ElectricalElectrical103/21/2026
Evergreen MechanicalPlumbing107/08/2026
Robert Ackerman El. ContElectrical103/21/2026
E-J Electric Installation CoElectrical103/22/2026
Malatesta PaladinoGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlantic Engineeringlabor13812009/21/2026
Alan Margolin & Associates4235209/08/2026
Leo Y Lee Associates2481410/29/2025
Atlas ATC Engineering8011206/20/2023
Building Lifecycle
All (300)Filed (61)Permit Issued (80)Signed Off (31)Facade (FISP) (3)Violation (6)Inspection (49)Objection (40)Special Inspection (30)
09/29/2026
Violation issued (ECB, open)
Construction
09/23/2026
Permit issued — Construction Fence
M00683005-I1-FN
09/22/2026
Permit issued — Supported Scaffold
M01005765-I1-SF
09/22/2026
Permit issued — Sidewalk Shed
M00690292-I1-SH
09/21/2026
Filed — Alteration
NYU HCC - MODIFICATION TO CEILING AND NEW EQUIPMENT PLATFORM ACCORDING TO PLANS FILED HEREWITH FOR SECONDARY RPZ. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00882565-P1
09/15/2026
Permit issued — Suspended Scaffold
M01112615-I1-SC
09/14/2026
Permit issued — General Construction
M00882565-I1-GC
09/10/2026
Permit issued — Sprinklers
M01163175-I1-EW-SP
09/08/2026
Filed — Alteration
Herewith filing to document Energy Code compliance for the proposed lighting work detailed in the submitted plans. Layout updated to reflect on site conditions. Necessary electrical permits are to be filed separately by a licensed electrician
M01169545-P1
08/28/2026
Permit issued — Sidewalk Shed
M00690292-I1-SH
08/24/2026
Filed — Alteration
NYU HCC - TRANSPLANT SCOPE - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01438875-S1
08/19/2026
Signed off — Alteration
M00882569-I1
08/17/2026
Special inspection requirement — Maintenance information
Christopher O'Malley
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
08/17/2026
Special inspection requirement — Final
Christopher O'Malley
08/17/2026
Special inspection requirement — Interior lighting power
Christopher O'Malley
08/17/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Christopher O'Malley
08/17/2026
Special inspection requirement — Lighting controls
Christopher O'Malley
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
08/14/2026
Filed — Alteration
NYU HCC - TRANSPLANT SCOPE - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01438875-I1
08/14/2026
Special inspection requirement — Interior lighting power
Young Suh
08/14/2026
Special inspection requirement — Maintenance information
Young Suh
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/14/2026
Special inspection requirement — Post-installed Anchors
Young Suh
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
08/14/2026
Special inspection requirement — Lighting controls
Young Suh
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
08/12/2026
Filed — Alteration
Sprinkler modifications on cellar, ground, 2nd, 10th, 11th, 13th, 14th floors as shown on plans filed herewith. No change in egress, occupancy, or use.
M01401746-S1
08/07/2026
Special inspection requirement — Lighting controls
Young Suh
08/07/2026
Special inspection requirement — Metering
Young Suh
08/07/2026
Special inspection requirement — Interior lighting power
Young Suh
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/07/2026
Special inspection requirement — Final
Young Suh
08/07/2026
Special inspection requirement — Maintenance information
Young Suh
08/05/2026
Special inspection requirement — Sprinkler Systems
Young Suh
08/05/2026
Special inspection requirement — Post-installed Anchors
Young Suh
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/30/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/30/2026
Special inspection requirement — Final
Young Suh
07/14/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00690292-P4
07/14/2026
Signed off — Alteration
INSTALLATION OF A P/M CONSTRUCTION HOIST COMPLEX AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00691967-I1
07/13/2026
Permit issued — General Construction
M01169545-I1-GC
07/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/25/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/05/2026
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL MODIFICATION AS PER PLANS FOR FIT OUT SCOPE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01044018-I1
06/04/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00690292-P3
06/02/2026
Permit issued — Sidewalk Shed
M00690292-I1-SH
05/29/2026
Permit issued — Sprinklers
M01401746-I1-EW-SP
05/26/2026
Permit issued — General Construction
M00996396-I1-GC
05/26/2026
Permit issued — General Construction
M01169545-I1-GC
05/22/2026
Permit issued — General Construction
M00715401-I1-GC
05/22/2026
Permit issued — Structural
M00996394-I1-ST
05/22/2026
Permit issued — Mechanical Systems
M00996388-I1-MS
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedUniversal Builders Supply09/23/2026
DOB NOWSidewalk ShedPermit IssuedUniversal Builders Supply09/22/2026
DOB NOWSupported ScaffoldPermit IssuedUniversal Builders Supply09/22/2026
DOB NOWSuspended ScaffoldPermit IssuedBenjamin Constructn09/15/2026
DOB NOWGeneral ConstructionPermit IssuedBenjamin Construction09/14/2026
DOB NOWSprinklersPermit IssuedNYC Fire Sprinkler09/10/2026
DOB NOWSidewalk ShedPermit IssuedUniversal Builders Supply08/28/2026
DOB NOWGeneral ConstructionPermit IssuedEmpire General Contracting07/13/2026
DOB NOWSidewalk ShedPermit IssuedUniversal Builders Supply06/02/2026
DOB NOWSprinklersPermit IssuedNYC Fire Sprinkler05/29/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co05/26/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co05/26/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co05/22/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co05/22/2026
DOB NOWStructuralPermit IssuedConsigli Construction Co05/22/2026
DOB NOWMechanical SystemsPermit IssuedConsigli Construction Co05/22/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co05/18/2026
DOB NOWMechanical SystemsPermit IssuedNelson Air Device04/30/2026
DOB NOWSprinklersPermit IssuedAshlar Mechanical04/10/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection04/01/2026
DOB NOWSidewalk ShedPermit IssuedUniversal Build Supp03/09/2026
DOB NOWGeneral ConstructionPermit IssuedB.R. Fries & Associates03/05/2026
DOB NOWMechanical SystemsPermit IssuedB.R. Fries & Associates03/05/2026
DOB NOWStructuralPermit IssuedB.R. Fries & Associates03/05/2026
DOB NOWSupported ScaffoldPermit IssuedUniversal Build Supp02/17/2026
DOB NOWConstruction FencePermit IssuedUniversal Build Supp02/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedTri-State Dismantling01/16/2026
DOB NOWStandpipeSigned-offSirina Fire Protection12/09/2025
DOB NOWSprinklersSigned-offSirina Fire Protection12/08/2025
DOB NOWPlumbingSigned-offEvergreen Mechanical12/04/2025
DOB NOWStructuralPermit IssuedMalatesta Paladino12/03/2025
DOB NOWSprinklersPermit IssuedSirina Fire Protection11/19/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/18/2025
DOB NOWSprinklersPermit IssuedAshlar Mechanical11/17/2025
DOB NOWSuspended ScaffoldPermit IssuedBenjamin Constructn11/14/2025
DOB NOWSprinklersPermit IssuedCurrent Fire Protection I11/13/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe10/29/2025
DOB NOWStructuralSigned-offBenjamin Construction09/12/2025
DOB NOWGeneral ConstructionPermit IssuedBenjamin Construction09/12/2025
DOB NOWGeneral ConstructionPermit IssuedBenjamin Construction09/11/2025
+ 60 more permits on file
4 projects · most recent 03/23/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2026Signed-offConsigli Construction CoAir Conditioning Systems
Cooling
Stulz COS-060-C-U-EC 67 kW · Packaged Unit ×4
03/01/2024Permit IssuedConsigli Construction CoHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Ventilation
Greenheck QEI-15 4,200 CFM · Exhaust Fan ×1
02/14/2024Permit IssuedB.R. Fries & AssociatesAir Conditioning Systems
Cooling
Iec FHA08 15,190 BTU ×1
VDY16 48,167 BTU ×1
VDY30 105,800 BTU ×1
12/23/2021Permit IssuedNelson Air DeviceAir Conditioning Systems, Ventilation Systems
Ventilation
Twin City Fan QCLB 31,000 CFM · Exhaust Fan ×1
QSL 8,000 CFM · Exhaust Fan ×1
4 projects · most recent 08/12/2026
FiledStatusContractorScope
08/12/2026Permit IssuedNYC Fire Sprinkler130 heads
08/28/2025Permit IssuedSirina Fire Protection98 heads
02/14/2024Permit IssuedAshlar Mechanical—
11/21/2019———
3 projects · most recent 08/28/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/28/2025———
02/02/2023Permit IssuedPace PlumbingStorm, Water/Sanitary
12/21/2021Permit IssuedCardoza PlumbingStorm, Water/Sanitary
21 projects · most recent 10/05/2026
General Wiring
FiledStatusContractorScope
10/05/2026Permit IssuedDiane ElectricGeneral Wiring
06/01/2026Permit IssuedCorporate Electric Group—
02/10/2026Pending PaymentGilston Electrical ContngGeneral Wiring
12/01/2025Permit IssuedMarcel Electrical Contracting—
05/09/2025Permit IssuedRockmor Electric EnterprisesGeneral Wiring
04/14/2025CompleteGilston Electrical ContngGeneral Wiring
04/03/2025Permit IssuedGilston Electrical Contng—
04/03/2025Permit IssuedGilston Electrical ContngGeneral Wiring
02/05/2025Permit IssuedBigman BrothersGeneral Wiring
09/26/2024CompleteGilston Electrical ContngGeneral Wiring
07/05/2024CompleteGilston Electrical Contng—
06/14/2024Permit IssuedGilston Electrical ContngGeneral Wiring
06/14/2024CompleteGilston Electrical ContngGeneral Wiring
06/14/2023CompleteE-J Electric Installation CoGeneral Wiring
08/31/2022Permit IssuedEgg Electric—
3 projects · most recent 02/14/2024
Steel
FiledStatusContractorScope
02/14/2024Permit IssuedAshlar MechanicalSteel
09/01/2022Permit IssuedLendlease (US) ConstructionSteel
08/27/2020——Steel
1 project · most recent 07/14/2026
Sidewalk Shed
FiledStatusContractorScope
07/14/2026Permit IssuedUniversal Build SuppSidewalk Shed
1 project · most recent 10/13/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/13/2025Permit IssuedBenjamin ConstructnSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 51
DateTypeResultReport
07/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/13/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
02/13/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
02/13/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
02/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 51.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/17/2026Maintenance informationChristopher O'Malleyenergy_progress
08/17/2026Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
08/17/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Christopher O'Malleyspecial
08/17/2026FinalChristopher O'Malleyprogress
08/17/2026Lighting controlsChristopher O'Malleyenergy_progress
08/17/2026Energy Code Compliance InspectionsChristopher O'Malleyprogress
08/17/2026Interior lighting powerChristopher O'Malleyenergy_progress
08/14/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
08/14/2026Energy Code Compliance InspectionsYoung Suhprogress
08/14/2026Maintenance informationYoung Suhenergy_progress
08/14/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
08/14/2026Fire-Resistance Rated ConstructionYoung Suhprogress
08/14/2026Lighting controlsYoung Suhenergy_progress
08/14/2026Post-installed AnchorsYoung Suhspecial
08/14/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
08/14/2026Interior lighting powerYoung Suhenergy_progress
08/07/2026Lighting controlsYoung Suhenergy_progress
08/07/2026Energy Code Compliance InspectionsYoung Suhprogress
08/07/2026Interior lighting powerYoung Suhenergy_progress
08/07/2026MeteringYoung Suhenergy_progress
08/07/2026Maintenance informationYoung Suhenergy_progress
08/07/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
08/07/2026FinalYoung Suhprogress
08/05/2026Post-installed AnchorsYoung Suhspecial
08/05/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYU Langone HealthMedical / HealthcareSub-cellar, Cellar, Floors 1–8, 12, 14, 15, Roof
Project M01438875 Alteration · Approved · 08/14/2026
Project M01169545 Alteration · Permit Entire · 02/14/2025
Project M01167711 Alteration · Permit Entire · 01/23/2025
Project M01122490 Alteration · Permit Entire · 12/05/2024
Project M01044018 Alteration · LOC Issued · 05/31/2024
Project M01044386 Alteration · LOC Issued · 05/17/2024
Project M01043857 Alteration · LOC Issued · 05/15/2024
Project M01044466 Alteration · LOC Issued · 05/15/2024
Project M01033590 Alteration · LOC Issued · 04/19/2024
Project M01019987 Alteration · LOC Issued · 03/31/2024
Project M01020096 Alteration · LOC Issued · 03/26/2024
Project M00996390 Alteration · Permit Entire · 03/07/2024
CompassOfficeCellar, Floors 1, 2, 10, 11, 13–15, Roof
Project M01401746 Alteration · Permit Entire · 05/21/2026
Schwartz Health Care CenterMedical / HealthcareCellar, Floors 1, 8, Roof
Project M01163175 Alteration · Permit Entire · 02/06/2025
Project M00583046 Alteration · Permit Entire · 12/06/2021
Project M00583091 Alteration · Permit Entire · 12/06/2021
Project M00350115 Alteration · Permit Entire · 08/31/2020
NYU La HealthMedical / HealthcareFloors 3, 4
Project M01020104 Alteration · LOC Issued · 04/05/2024
NYU Hospitals CenterMedical / HealthcareCellar, Floor 1
Project M00373647 Alteration · LOC Issued · 09/16/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,846 on file (BIS + DOB NOW)
▸Plans & Drawings110
▸DOB NOWPlans/Sketch91
09/06/2026M00017240-I1Request digital key ↗
09/03/2026M00510597-P1Request digital key ↗
09/03/2026M00510475-I1Request digital key ↗
Showing 3 of 91 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00239306-P2Request digital key ↗
08/31/2026M00350115-I1Request digital key ↗
Showing 2 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00236095-I1Request digital key ↗
Showing 1 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00236105-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/04/2026M00386224-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Applications & Permits464
▸BISPLAN / WORK APPROVAL APPLICATION271
07/30/2024140931026Open ↗
07/30/2024140930740Open ↗
05/23/2023123152266Open ↗
Showing 3 of 271 on file for this type
▸BISWORK PERMIT APPLICATION191
02/26/2021123727538Open ↗
11/18/2020140948688Open ↗
06/26/2020123297226Open ↗
Showing 3 of 191 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
12/28/2021122545095Open ↗
08/07/2020123297226Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISFLOOD ZONE DESIGN CERTIFICATION3
09/11/2020140948688Open ↗
09/02/2020140930740Open ↗
08/21/2020140931026Open ↗
▸BISFLOOD ZONE COMPLIANCE3
04/04/2024140948688Open ↗
05/19/2023123152266Open ↗
02/02/2021123297226Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/05/2021123906746Open ↗
▸Seals & Professional Certifications684
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION350
10/21/2021123378521Open ↗
10/21/2021123378521Open ↗
10/21/2021123378521Open ↗
Showing 3 of 350 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature107
09/06/2026M00017240-I1Open ↗
09/05/2026M00239306-I1Open ↗
09/05/2026M00239306-P1Open ↗
Showing 3 of 107 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature86
10/14/2026M01169545-P1Open ↗
10/04/2026M00882565-I1Open ↗
10/04/2026M00882565-I1Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWProgress Inspector Seal & Signature74
10/14/2026M01169545-P1Open ↗
10/14/2026M01169545-P1Open ↗
10/04/2026M00882565-P1Open ↗
Showing 3 of 74 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/11/2020140948688Open ↗
09/02/2020140930740Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
09/11/2020140948688Open ↗
09/02/2020140930740Open ↗
08/21/2020140931026Open ↗
▸Trade Schedules & Equipment139
▸BISSCHEDULE B - PLUMBING39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISSELF-CERT PLUMBING NOTICE38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA22
04/26/2021123257304Open ↗
Showing 1 of 22 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection3
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos298
▸BISASBESTOS: CERTIFICATION (DEP ACP5)83
09/11/2020140948688Open ↗
Showing 1 of 83 on file for this type
▸DOB NOWOER: Notice to Proceed55
10/14/2026M01169545-P1Open ↗
10/04/2026M00882565-P1Open ↗
09/06/2026M00017240-I1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report48
09/05/2026M00239306-P2Open ↗
09/05/2026M00236095-I1Open ↗
09/03/2026M00517209-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWOER: Notice of Satisfaction32
10/14/2026M01169545-P1Open ↗
08/30/2026M00882569-I1Open ↗
Showing 2 of 32 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form22
09/03/2026M00580502-I1Open ↗
09/03/2026M00624266-I1Open ↗
09/03/2026M00583071-I1Open ↗
Showing 3 of 22 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED16
09/22/2020140948688Open ↗
09/02/2020140930740Open ↗
08/21/2020140931026Open ↗
Showing 3 of 16 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION5
04/04/2024140948688Open ↗
06/02/2021123727538Open ↗
12/09/2020123297226Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
09/10/2020122722367Open ↗
08/12/2020122722367Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
02/08/2023140931026Open ↗
Showing 1 of 3 on file for this type
▸Energy Compliance150
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS87
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 87 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS28
06/11/2021123727538Open ↗
06/02/2021123727538Open ↗
09/02/2020123055629Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY15
02/08/2023140931026Open ↗
06/11/2021123727538Open ↗
06/02/2021123727538Open ↗
Showing 3 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
04/04/2024140948688Open ↗
05/19/2023123152266Open ↗
11/10/2020122902083Open ↗
▸DOB NOWEN2: As Built Energy Analysis3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 2ND REVIEW1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports66
▸BISTECHNICAL REPORT: RESPONSIBILITY48
05/22/2023123152266Open ↗
05/12/2023123152266Open ↗
02/08/2023140931026Open ↗
Showing 3 of 48 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER7
08/21/2020122902083Open ↗
07/19/2020122902083Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/04/2024140948688Open ↗
05/19/2023123152266Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/04/2024140948688Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
04/04/2024140948688Open ↗
▸Approvals, Objections & Sign-offs291
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter106
09/06/2026M00017240-I1Open ↗
09/05/2026M00239306-P2Open ↗
09/05/2026M00236095-I1Open ↗
Showing 3 of 106 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST87
04/08/2024140948688Open ↗
06/02/2023123152266Open ↗
12/28/2021122545095Open ↗
Showing 3 of 87 on file for this type
▸BISADMINISTRATIVE OBJECTIONS41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION40
02/05/2021123906746Open ↗
02/05/2021123906746Open ↗
01/25/2021123906746Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDEP Variance (V5) letter14
09/03/2026M00580502-I1Open ↗
Showing 1 of 14 on file for this type
▸BISFINAL2
04/04/2024140948688Open ↗
05/19/2023123152266Open ↗
▸BISFEE DEFERRAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership256
▸BISCOST AFFIDAVIT253
04/08/2024140948688Open ↗
10/14/2021122545095Open ↗
10/05/2021122891567Open ↗
Showing 3 of 253 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/08/2024140948688Open ↗
05/19/2023123152266Open ↗
02/02/2021123297226Open ↗
▸Filing & Intake Forms281
▸BISEFILING COVER SHEET133
01/25/2021123906746Open ↗
Showing 1 of 133 on file for this type
▸BISBOROUGH INTAKE FORM90
01/25/2021123906746Open ↗
Showing 1 of 90 on file for this type
▸BISADDITIONAL INFORMATION54
05/23/2023123152266Open ↗
02/05/2021123906746Open ↗
01/19/2021123297226Open ↗
Showing 3 of 54 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/11/2020140948688Open ↗
09/02/2020140930740Open ↗
08/21/2020140931026Open ↗
Showing 3 of 4 on file for this type
▸Other Documents83
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION62
08/04/2020122891567Open ↗
Showing 1 of 62 on file for this type
▸BISSupporting Document: Fee Deferment5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSupporting Document: Fee Exempt4
05/23/2023123152266Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWCalculations4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS3
09/11/2020140948688Open ↗
09/02/2020140930740Open ↗
08/21/2020140931026Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/05/2021123906746Open ↗