ECB09/08/2025FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #4, SOUTH ELEVATION, CRACKED/BROKEN GLASS WINDOW AT 3RD FLOOR. SPALLING BRICK MORTAR JOINTS AT 6TH$25K due
ECB08/29/2017FAILURE TO MAINTAIN BUILDING CODE COMPLIANT MANNER.FAILURE TO COMPLY WITH LAW FOR DRAINAGE SYSTEM PER PC702.1;27-911 IN CHEMICAL LAB ROOM ONTHE 8TH FLR I OBSERVED AN IN DIRECT DRAIN MADE TO DISCHARGE INTO A LABNothing owed — awaiting certificate of correction
ECB04/29/1992OPERATION OF P.A. WITHOUT A CURRENT PERMIT SCHERHORN BUILDING LECTURE HALL 5TH FLOOR. REMEDY: OBTAIN A VALID P.A.Nothing owed — awaiting certificate of correction
ECB12/18/1989REQUIRED MEANS OF EGRESS OBSTRUCTED BY NEW BUILDING WALL AT NORTHSIDE OF PA SPACE. REMEDY: REMOVE OBSTRUCTION.Nothing owed — awaiting certificate of correction