← Back
BuildNYC
Converted dwellings or rooming house
530 WEST 178TH STREET
MANHATTAN · BIN 1063186
💬 Discuss this project
1906Year Built
5Stories
C5Building Class
R7-2Zoning
14,550 sfGross Floor Area
55Units
Rent Stabilized29 Active Violations 1 likely answered ▸
Converted dwellings or rooming house · Owner of record: Mhany Stella Heights Housing Development Fund · 4,039 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBoiler mechanical system workUnder Construction64p · 1 filing · 20 docs
Floor 5Boiler mechanical system workUnder Construction57p · 1 filing · 20 docs
Floor 4Boiler mechanical system workUnder Construction57p · 1 filing · 20 docs
Floor 3Boiler mechanical system workUnder Construction57p · 1 filing · 20 docs
Floor 2Boiler mechanical system workUnder Construction57p · 1 filing · 20 docs
Floor 1Boiler mechanical system workUnder Construction91p · 1 filing · 20 docs
CellarBoiler mechanical system workUnder Construction81p · 1 filing · 20 docs
Site & exteriorTemporary pipe scaffold installation7p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mhany Stella Heights Housing Development Fund103/22/2026
Broadway Housing Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rosenthal1210/02/2026
Eskw/Architects410/02/2026
MSM Engineering Services203/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 21472803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cegf & G PlumbingPlumbing607/08/2026
Project Eye Consultants IGeneral Contractor507/08/2026
MNK Enterprises NYScaffold507/08/2026
Aamway Service CoGeneral Contractor507/08/2026
Cegf & G PlumbingFire Protection307/08/2026
Park Contracting GroupScaffold207/08/2026
Branch PlumbingPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SJS Inspections and Consulting8286910/02/2026
Building Lifecycle
All (151)Filed (18)Permit Issued (21)Signed Off (2)Violation (60)Inspection (8)Objection (12)Special Inspection (30)
10/02/2026
Filed — Alteration
FILING HEREWITH INSTALLATION OF NEW GAS BOILER AS PER PLANS.
M00527340-A2
10/02/2026
Filed — Alteration
FILING HEREWITH INSTALLATION OF NEW GAS BOILER AS PER PLANS.
M00527340-A3
09/11/2026
Special inspection requirement — Final
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — Insulation placement and R values
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — Lighting controls
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — Interior lighting power
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — Masonry
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — Fenestration areas
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY BOLOTOV
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
09/01/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, closed)
A
04/14/2026
Permit issued — Plumbing
M00527340-S2-PL
02/27/2026
Violation issued (HPD, closed)
A
02/27/2026
Violation issued (HPD, closed)
A
02/27/2026
Violation issued (HPD, closed)
A
02/27/2026
Violation issued (HPD, closed)
A
02/27/2026
Violation issued (HPD, closed)
C
02/27/2026
Violation issued (HPD, closed)
A
02/27/2026
Violation issued (HPD, closed)
A
01/13/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/06/2026
Permit issued — General Construction
M00527340-I1-GC
12/26/2025
Permit issued — Mechanical Systems
M00527340-S1-MS
12/08/2025
Permit issued — Plumbing
M00527340-S2-PL
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Permit issued — Sprinklers
M00527340-S3-EW-SP
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
A
10/01/2025
Violation issued (HPD, open)
B
10/01/2025
Violation issued (HPD, open)
B
09/15/2025
Violation issued (HPD, open)
C
09/15/2025
Violation issued (HPD, closed)
B
09/15/2025
Violation issued (HPD, open)
A
09/15/2025
Violation issued (HPD, closed)
A
09/15/2025
Violation issued (HPD, open)
A
09/15/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/05/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01007396-I1
08/05/2025
Permit issued — Mechanical Systems
M00527340-S1-MS
07/31/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01190790-I1
07/14/2025
Permit issued — Supported Scaffold
M01190790-I1-SF
07/11/2025
Permit issued — Sidewalk Shed
M01007396-I1-SH
06/04/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
C
05/29/2025
Violation issued (HPD, closed)
C
04/09/2025
Permit issued — Mechanical Systems
M00527340-S1-MS
03/24/2025
Permit issued — Supported Scaffold
M01190790-I1-SF
03/21/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01190790-I1
03/21/2025
Permit issued — Sprinklers
M00527340-S3-EW-SP
03/17/2025
Permit issued — Plumbing
M00527340-S2-PL
03/13/2025
Permit issued — Boiler Equipment
M00527340-S4-BE
02/26/2025
Permit issued — General Construction
M00527340-I1-GC
02/19/2025
Permit issued — Sidewalk Shed
M01007396-I1-SH
01/25/2025
Violation issued (HPD, closed)
C
12/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
SERGEY BOLOTOV
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCegf & G Plumbing04/14/2026
DOB NOWGeneral ConstructionPermit IssuedProject Eye Consultants I01/06/2026
DOB NOWMechanical SystemsPermit IssuedAamway Service Co12/26/2025
DOB NOWPlumbingPermit IssuedBell Construction Service12/08/2025
DOB NOWSprinklersSigned-offCegf & G Plumbing11/14/2025
DOB NOWMechanical SystemsPermit IssuedAamway Service Co08/05/2025
DOB NOWSupported ScaffoldSigned-offPark Contracting Group07/14/2025
DOB NOWSidewalk ShedSigned-offPark Contracting Group07/11/2025
DOB NOWMechanical SystemsPermit IssuedAamway Service Co04/09/2025
DOB NOWSupported ScaffoldSigned-offMNK Enterprises NY03/24/2025
DOB NOWSprinklersSigned-offCegf & G Plumbing03/21/2025
DOB NOWPlumbingPermit IssuedBell Construction Service03/17/2025
DOB NOWBoiler EquipmentSigned-offBell Construction Service03/13/2025
DOB NOWGeneral ConstructionPermit IssuedProject Eye Consultants I02/26/2025
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY02/19/2025
DOB NOWMechanical SystemsPermit IssuedAamway Service Co04/05/2024
DOB NOWSprinklersSigned-offCegf & G Plumbing03/22/2024
DOB NOWBoiler EquipmentSigned-offBell Construction Service03/18/2024
DOB NOWPlumbingPermit IssuedBell Construction Service03/14/2024
DOB NOWGeneral ConstructionPermit IssuedProject Eye Consultants I03/01/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY02/20/2024
1 project · most recent 10/02/2026
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScope
10/02/2026Permit IssuedProject Eye Consultants IAssociated Ducts and Piping, Heating Systems, Ventilation Systems
1 project · most recent 10/02/2026
Sprinkler System
FiledStatusContractorScope
10/02/2026Signed-offTrident MechanicalSprinkler System
1 project · most recent 10/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/02/2026Permit IssuedTrident MechanicalGas, Water/Sanitary
4 projects · most recent 03/04/2025
General Wiring
FiledStatusContractorScope
03/04/2025Permit IssuedGramercy ElectricGeneral Wiring
02/19/2024CompleteRichard Neu—
08/23/2023CancelledAmerican Power Electric ConsGeneral Wiring
12/15/2019Permit IssuedCounty Electrical Contractor IGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/13/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/15/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/09/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/19/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
09/11/2026Lighting controlsSERGEY BOLOTOVenergy_progress
09/11/2026Insulation placement and R valuesSERGEY BOLOTOVenergy_progress
09/11/2026Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
09/11/2026HVAC-R and service water heating system controlsSERGEY BOLOTOVenergy_progress
09/11/2026HVAC-R and service water piping design and insulationSERGEY BOLOTOVenergy_progress
09/11/2026HVAC-R and service water heating equipmentSERGEY BOLOTOVenergy_progress
09/11/2026Tenant Protection Plan Compliance—special
09/11/2026MasonrySERGEY BOLOTOVspecial
09/11/2026FinalSERGEY BOLOTOVprogress
09/11/2026Fenestration areasSERGEY BOLOTOVenergy_progress
09/11/2026Interior lighting powerSERGEY BOLOTOVenergy_progress
12/30/2024HVAC-R and service water heating equipmentSERGEY BOLOTOVenergy_progress
12/30/2024HVAC-R and service water piping design and insulationSERGEY BOLOTOVenergy_progress
12/30/2024Tenant Protection Plan ComplianceSERGEY BOLOTOVspecial
12/30/2024HVAC-R and service water heating system controlsSERGEY BOLOTOVenergy_progress
11/27/2024HVAC-R and service water heating system controlsSERGEY BOLOTOVenergy_progress
11/27/2024Maintenance informationSERGEY BOLOTOVenergy_progress
11/27/2024HVAC-R and service water heating equipmentSERGEY BOLOTOVenergy_progress
11/27/2024Shutoff dampersSERGEY BOLOTOVenergy_progress
11/27/2024HVAC-R and service water piping design and insulationSERGEY BOLOTOVenergy_progress
11/27/2024Mechanical SystemsSERGEY BOLOTOVspecial
11/27/2024Heating SystemsSERGEY BOLOTOVspecial
11/27/2024Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
11/27/2024Tenant Protection Plan ComplianceSERGEY BOLOTOVspecial
11/27/2024FinalSERGEY BOLOTOVprogress
Latest 25 of 83.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/28/2026M01007396-I1Request digital key ↗
08/25/2026M00527340-A1Request digital key ↗
08/25/2026M00527340-S2Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/28/2016122910083Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature18
10/05/2026M00527340-A3Open ↗
10/05/2026M00527340-A2Open ↗
08/28/2026M01007396-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
10/05/2026M00527340-A2Open ↗
10/05/2026M00527340-A3Open ↗
10/05/2026M00527340-A2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/05/2026M00527340-A2Open ↗
09/23/2026M00527340-S4Open ↗
09/23/2026M00527340-S4Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/28/2016122910083Open ↗
▸Safety & Tenant Protection18
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist18
10/05/2026M00527340-A3Open ↗
10/05/2026M00527340-A2Open ↗
08/25/2026M00527340-P4Open ↗
Showing 3 of 18 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWDEP Variance (V5) letter5
08/13/2026M00527340-I1Open ↗
08/13/2026M00527340-S4Open ↗
08/13/2026M00527340-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
10/05/2026M00527340-A2Open ↗
08/25/2026M00527340-P1Open ↗
08/25/2026M00527340-I1Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/28/2016122910083Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/28/2016122910083Open ↗