← Back
BuildNYC
Television studio
CBS Broadcast Center
530 WEST 57TH STREET · BIN 1076216
💬 Discuss this project
1937Year Built
3Stories
J6Building Class
M1-5Zoning
490,080 sfGross Floor Area
1Units
LL97 Covered4 Active Violations 4 old, status unconfirmed ▸
Television studio · Owner of record: CBS Broadcasting · 107,950 sf lot · 4.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCBS Broadcasting, ViacomCBS5p · 2 filings · 20 docs
Floor 4ViacomCBS13p · 1 filing · 15 docs
Floor 3ViacomCBS27p · 3 filings · 20 docs
Floor 2Paramount Skydance, ViacomCBSUnder Construction31p · 3 filings · 20 docs
Floor 1CBS Broadcasting, CBS Coe +125p · 5 filings · 20 docs
Site & exteriorCBS Corporation - Paramount25p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CBS51810/04/2026
CBS Broadcasting5207/08/2026
Paramount703/21/2026
Bigman Brothers203/22/2026
Felice Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design303/21/2026
Municipal Building Consultants1403/21/2026
HH Building Consulting & Architectu203/21/2026
Desarno Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM Construction ManagementGeneral Contractor1107/08/2026
Intersystem InstallationScaffold1007/08/2026
Intersystems Installation S&SScaffold603/21/2026
DNA ContractingGeneral Contractor407/08/2026
Commercial Electric ContElectrical403/21/2026
VerusGeneral Contractor310/03/2026
Bigman BrothersElectrical203/22/2026
A.W. & S. Construction CoGeneral Contractor103/21/2026
V. Vass ElectricElectrical103/22/2026
Falk Technical ServiceGeneral Contractor107/08/2026
Spieler & Ricca Electrical CoElectrical103/21/2026
R.C.M. ElectricElectrical103/21/2026
Dal ElectricalElectrical103/22/2026
Bigman BrothersElectrical103/21/2026
Aggressive Fire ProtectionFire Protection107/08/2026
Ashlar MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP Inspections1102809/28/2026
Metric Consulting and Ins1803112/12/2025
AK Engineering678102/14/2024
Mechanical Inspections334105/03/2022
Skyline Engineering267403/06/2020
Building Lifecycle
All (151)Filed (21)Permit Issued (24)Signed Off (14)Violation (60)Inspection (2)Special Inspection (30)
10/02/2026
Permit issued — General Construction
M01455378-I1-GC
10/01/2026
Permit issued — Mechanical Systems
M01455378-S1-MS
09/28/2026
Filed — Alteration
Sprinkler plans filed herewith to show the cap/removal of 14 sprinkler heads and installation of 9 new sprinkler heads. No change to use, egress, or occupancy.
M01455378-S1
09/28/2026
Filed — Alteration
Sprinkler plans filed herewith to show the cap/removal of 14 sprinkler heads and installation of 9 new sprinkler heads. No change to use, egress, or occupancy.
M01455378-I1
09/28/2026
Filed — Alteration
Sprinkler plans filed herewith to show the cap/removal of 14 sprinkler heads and installation of 9 new sprinkler heads. No change to use, egress, or occupancy.
M01455378-S2
09/18/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
09/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
09/03/2026
Special inspection requirement — Final
Nicolas Crosetto
09/03/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
09/03/2026
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
09/03/2026
Special inspection requirement — Final
Nicolas Crosetto
03/17/2026
Signed off — Alteration
M01323029-I1
01/02/2026
Permit issued — Structural
M01323029-I1-ST
12/12/2025
Filed — Alteration
M01323029-I1
01/09/2025
Signed off — Alteration
M00981429-I1
12/03/2024
Signed off — Alteration
M01092721-I1
11/20/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01123971-I1
10/10/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01123971-I1
10/10/2024
Permit issued — Supported Scaffold
M01123971-I1-SF
09/18/2024
Permit issued — General Construction
M01092721-I1-GC
09/03/2024
Filed — Alteration
M01092721-I1
07/10/2024
Signed off — Alteration
M00996613-I1
02/20/2024
Permit issued — General Construction
M00996613-I1-GC
02/14/2024
Filed — Alteration
M00996613-I1
01/05/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/28/2023
Permit issued — Sidewalk Shed
M00981429-I1-SH
12/27/2023
Filed — Alteration
M00981429-I1
12/13/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2023
Violation issued (ECB, open)
Construction
11/20/2023
Violation issued (ECB, open)
Construction
11/20/2023
Violation issued (ECB, closed)
Construction
11/17/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/2023
Signed off — Alteration
M00385418-I1
01/19/2023
Permit issued — Sidewalk Shed
M00385418-I1-SH
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2022
Signed off — Alteration
SPRINKLER WORK AS PER PLANS FILED HEREWITH.
M00551573-I1
08/04/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/03/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/01/2022
Signed off — Alteration
HVAC duct work and relocation of thermostat as per plans filed herewith. No change to Use Occupancy or Egress.
M00192756-I1
06/07/2022
Signed off — Alteration
Install (2) 3 ton units
M00699909-I1
06/07/2022
Permit issued — Mechanical Systems
M00699909-I1-MS
06/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2022
Signed off — Alteration
PAA TO UPDATE MECHNAICAL WORK FOR VENTILATION AND AIR CONDITIONING SYSTEMS AS PER PLANS FILED HEREWITH.NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00551564-I1
05/24/2022
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
05/24/2022
Special inspection requirement — Final
Nicolas Crosetto
05/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Crosetto
05/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Crosetto
05/24/2022
Special inspection requirement — Maintenance information
Nicolas Crosetto
05/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Crosetto
05/23/2022
Filed — Alteration
PAA TO UPDATE MECHNAICAL WORK FOR VENTILATION AND AIR CONDITIONING SYSTEMS AS PER PLANS FILED HEREWITH.NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00551564-P1
05/03/2022
Filed — Alteration
Install (2) 3 ton units
M00699909-I1
03/16/2022
Special inspection requirement — Mechanical Systems
BRETT POLINSKY
03/16/2022
Special inspection requirement — Final
BRETT POLINSKY
10/14/2021
Permit issued — Sprinklers
M00551573-I1-EW-SP
10/07/2021
Signed off — Alteration
GENERAL CONTRUCTION FOR RENOVATIONS AS PER PLANS FILED HEREIWHT, NOCHANGE TO USE, OCCUPANCY OR EGRESS.
M00468278-I1
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVerus10/02/2026
DOB NOWMechanical SystemsPermit IssuedVerus10/01/2026
DOB NOWStructuralSigned-offPaul Charlton01/02/2026
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S10/10/2024
DOB NOWGeneral ConstructionSigned-offPaul Charlton09/18/2024
DOB NOWGeneral ConstructionSigned-offPaul Charlton02/20/2024
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S12/28/2023
DOB NOWSidewalk ShedSigned-offIntersystem Installation01/19/2023
DOB NOWMechanical SystemsSigned-offFalk Technical Service06/07/2022
DOB NOWSprinklersSigned-offAggressive Fire Protection10/14/2021
DOB NOWMechanical SystemsSigned-offA.W. & S. Construction Co09/13/2021
DOB NOWSidewalk ShedSigned-offIntersystem Installation08/05/2021
DOB NOWGeneral ConstructionSigned-offJRM Construction Management04/19/2021
DOB NOWMechanical SystemsSigned-offJRM Construction Management04/19/2021
DOB NOWGeneral ConstructionSigned-offJRM Construction Management04/13/2021
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/24/2020
DOB NOWSidewalk ShedSigned-offIntersystem Installation08/18/2020
DOB NOWMechanical SystemsPermit IssuedJRM Construction Management04/17/2020
DOB NOWMechanical SystemsSigned-offJRM Construction Management04/16/2020
DOB NOWMechanical SystemsPermit IssuedJRM Construction Management03/13/2020
DOB NOWMechanical SystemsSigned-offJRM Construction Management01/07/2020
DOB NOWSprinklersSigned-offAshlar Mechanical09/10/2019
DOB NOWMechanical SystemsSigned-offJRM Construction Management08/30/2019
DOB NOWMechanical SystemsSigned-offVerus08/26/2019
BISOTISSUEDJRM Construction Management04/16/2020
BISOTISSUEDJRM Construction Management04/16/2020
BISOTISSUEDJRM Construction Management03/06/2020
BISOTISSUEDJRM Construction Management08/23/2019
BISMHISSUEDJRM Construction Management04/15/2019
BISOTISSUEDJRM Construction Management04/15/2019
BISSPISSUEDAshlar Mechanical11/08/2018
BISPLISSUEDWiesenberg11/08/2018
BISSPISSUEDAshlar Mechanical11/08/2018
BISPLISSUEDWiesenberg11/08/2018
BISMHISSUEDJRM Construction Management10/11/2018
BISPLISSUEDMiller Plumbing & Heating08/10/2018
BISOTISSUEDJRM Construction Management07/17/2018
BISOTISSUEDVerus07/12/2018
BISSPISSUEDSirina Fire Protection07/09/2018
BISPLISSUEDMiller Plumbing & Heating07/06/2018
+ 34 more permits on file
1 project · most recent 03/06/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2020Permit IssuedJRM Construction ManagementAir Conditioning Systems
Cooling
Iec HPY-06 625 CFM · Fan Coil Indoor ×1
HPY-14 1,000 CFM · Fan Coil Indoor ×1
1 project · most recent 09/28/2026
Sprinkler System
FiledStatusContractorScope
09/28/2026——Sprinkler System
17 projects · most recent 09/25/2026
General Wiring Lighting
FiledStatusContractorScope
09/25/2026Permit IssuedBigman BrothersGeneral Wiring
12/21/2023Permit IssuedBigman Brothers—
12/18/2023Permit IssuedAurora Electrical Contg—
04/10/2023CompleteBigman BrothersGeneral Wiring, Lighting
02/02/2023CompleteDal ElectricalGeneral Wiring
01/14/2022CompleteBigman BrothersGeneral Wiring
12/16/2020CompleteE-J Electric Installation CoGeneral Wiring
08/12/2020CompleteBigman Brothers—
08/12/2020CancelledSteven Farkas—
12/08/2019Permit IssuedV. Vass ElectricGeneral Wiring
08/26/2019CompleteBigman BrothersGeneral Wiring
06/28/2019CompleteE-J Electric Installation CoGeneral Wiring
10/30/2018CompleteDal Electrical—
08/02/2018CompleteBigman Brothers—
07/06/2018CompleteBigman BrothersGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/04/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/03/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/18/2026Post-installed AnchorsNicolas Crosettospecial
09/18/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
09/03/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
09/03/2026FinalNicolas Crosettoprogress
09/03/2026Sprinkler SystemsNicolas Crosettospecial
09/03/2026Mechanical SystemsNicolas Crosettospecial
09/03/2026FinalNicolas Crosettoprogress
05/24/2022Mechanical SystemsNicolas Crosettospecial
05/24/2022FinalNicolas Crosettoprogress
05/24/2022HVAC-R and service water heating equipmentNicolas Crosettoenergy_progress
05/24/2022HVAC-R and service water piping design and insulationNicolas Crosettoenergy_progress
05/24/2022Maintenance informationNicolas Crosettoenergy_progress
05/24/2022HVAC-R and service water heating system controlsNicolas Crosettoenergy_progress
03/16/2022Mechanical SystemsBRETT POLINSKYspecial
03/16/2022FinalBRETT POLINSKYprogress
08/18/2021FinalNicolas Crosettoprogress
08/18/2021Interior lighting powerNicolas Crosettoenergy_progress
08/18/2021Lighting controlsNicolas Crosettoenergy_progress
07/14/2021Lighting controlsNicolas Crosettoenergy_progress
07/14/2021FinalNicolas Crosettoprogress
07/14/2021Interior lighting powerNicolas Crosettoenergy_progress
07/02/2021Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/02/2021Sprinkler SystemsNicolas Crosettospecial
07/02/2021Post-installed AnchorsNicolas Crosettospecial
02/11/2021HVAC insulation and sealing Nicolas Crosettoenergy_progress
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Paramount SkydanceOfficeFloor 2
Project M01455378 Alteration · Permit Entire · 09/28/2026
CBS BroadcastingOfficeFloor 1, Roof
Project M01323029 Alteration · LOC Issued · 12/12/2025
Project M00699909 Alteration · LOC Issued · 05/03/2022
CBS Corporation - ParamountOffice—
Project M01092721 Alteration · LOC Issued · 09/03/2024
ViacomCBSOfficeFloors 2–4
Project M00551564 Alteration · LOC Issued · 08/26/2021
Project M00551573 Alteration · LOC Issued · 08/26/2021
CBS Podcast StudioOfficeFloor 1
Project M00317709 Alteration · Filing Withdrawn · 03/06/2020
CBS CoeLaboratoryFloor 1
Project M00212190 Alteration · LOC Issued · 08/21/2019
Project M00208497 Alteration · LOC Issued · 08/20/2019
CBS SportsOfficeFloor 1
Project M00192756 Alteration · LOC Issued · 08/13/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,358 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch9
09/03/2026M00551573-I1Request digital key ↗
09/03/2026M00551564-I1Request digital key ↗
09/03/2026M00551564-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00192756-I1Request digital key ↗
09/05/2026M00208497-I1Request digital key ↗
09/03/2026M00331086-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00212190-I1Request digital key ↗
08/15/2026M00212190-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00468278-P1Request digital key ↗
09/03/2026M00468278-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00385418-I1Request digital key ↗
▸Applications & Permits423
▸BISPLAN / WORK APPROVAL APPLICATION274
07/08/2025102838725Open ↗
07/01/2025102838725Open ↗
06/09/2025102838725Open ↗
Showing 3 of 274 on file for this type
▸BISWORK PERMIT APPLICATION144
03/10/2020123829170Open ↗
08/26/2019123771454Open ↗
07/15/2019123879623Open ↗
Showing 3 of 144 on file for this type
▸BISPLACE OF ASSEMBLY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Seals & Professional Certifications567
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION356
03/09/2020123829170Open ↗
03/09/2020123829170Open ↗
02/14/2020123879623Open ↗
Showing 3 of 356 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST61
03/09/2020123829170Open ↗
08/20/2019123771454Open ↗
07/16/2019123879623Open ↗
Showing 3 of 61 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT29
03/09/2020123829170Open ↗
08/20/2019123771454Open ↗
07/16/2019123879623Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
10/02/2026M01455378-S1Open ↗
10/02/2026M01455378-I1Open ↗
09/02/2026M00331086-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
10/02/2026M01455378-I1Open ↗
10/02/2026M01455378-S1Open ↗
10/02/2026M01455378-S2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/02/2026M01455378-S1Open ↗
10/02/2026M01455378-S2Open ↗
10/02/2026M01455378-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPC FULL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment171
▸BISFA - FDNY APPROVAL : FD-FAA45
02/16/2021123542416Open ↗
10/29/2020123583586Open ↗
10/29/2020123321841Open ↗
Showing 3 of 45 on file for this type
▸BISSELF-CERT PLUMBING NOTICE44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8510
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection95
▸BISANTI-HARASSMENT CHECKLIST: CLINTON64
03/09/2020123829170Open ↗
08/20/2019123771454Open ↗
07/16/2019123879623Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist21
10/02/2026M01455378-S1Open ↗
10/02/2026M01455378-I1Open ↗
10/02/2026M01455378-S2Open ↗
Showing 3 of 21 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M01092721-I1Open ↗
▸Environmental & Asbestos164
▸BISASBESTOS: CERTIFICATION (DEP ACP5)73
03/09/2020123829170Open ↗
08/20/2019123771454Open ↗
07/16/2019123879623Open ↗
Showing 3 of 73 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
10/02/2026M01455378-S1Open ↗
10/02/2026M01455378-I1Open ↗
10/02/2026M01455378-S2Open ↗
Showing 3 of 18 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
03/02/2022123542336Open ↗
10/18/2021123542416Open ↗
Showing 2 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance147
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS92
03/09/2020123829170Open ↗
03/09/2020123829170Open ↗
02/26/2020123879623Open ↗
Showing 3 of 92 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS30
02/03/2022123771454Open ↗
11/17/2020123321841Open ↗
02/26/2020123879623Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
02/08/2022123771454Open ↗
02/08/2022123771454Open ↗
02/03/2022123771454Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
02/08/2022123771454Open ↗
02/08/2022123771454Open ↗
11/17/2020123583586Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00468278-I1Open ↗
08/13/2026M00551564-I1Open ↗
08/13/2026M00331086-I1Open ↗
▸Inspections & Test Reports33
▸BISTECHNICAL REPORT: RESPONSIBILITY19
06/17/2025103790033Open ↗
06/09/2025104662152Open ↗
06/09/2025120974650Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19754
06/17/2025103790033Open ↗
06/05/2025104662152Open ↗
12/04/2024104231412Open ↗
Showing 3 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
09/30/2024104217973Open ↗
▸BIS* WELDING 27-6161
09/30/2024104217973Open ↗
▸Approvals, Objections & Sign-offs196
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST100
06/17/2025103790033Open ↗
06/16/2025120974650Open ↗
06/11/2025104662152Open ↗
Showing 3 of 100 on file for this type
▸BISADMINISTRATIVE OBJECTIONS72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 72 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
10/30/2024102838725Open ↗
04/16/2024100971192Open ↗
04/16/2024100659878Open ↗
Showing 3 of 17 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/08/2025102838725Open ↗
07/01/2025102838725Open ↗
06/09/2025102838725Open ↗
▸Cost, Insurance & Ownership266
▸BISCOST AFFIDAVIT260
06/17/2025103790033Open ↗
06/17/2025103790033Open ↗
06/09/2025120974650Open ↗
Showing 3 of 260 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
04/28/2025104662152Open ↗
11/26/2024104231412Open ↗
10/17/2024104217973Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms234
▸BISEFILING COVER SHEET137
03/09/2020123829170Open ↗
08/20/2019123771454Open ↗
07/16/2019123879623Open ↗
Showing 3 of 137 on file for this type
▸BISADDITIONAL INFORMATION45
07/07/2025102838725Open ↗
04/24/2025104662152Open ↗
10/25/2024104231412Open ↗
Showing 3 of 45 on file for this type
▸BISBOROUGH INTAKE FORM42
02/26/2020123879623Open ↗
10/03/2019123319364Open ↗
06/20/2019123468988Open ↗
Showing 3 of 42 on file for this type
▸BISeFiling Job Application Cover Sheet10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
10/03/2019123319364Open ↗
Showing 1 of 10 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7793
06/11/2025103790033Open ↗
06/05/2025104662152Open ↗
11/06/2024104231412Open ↗
▸BIS* VENT. SYS.-FIRE DAMPERS 27-343(D),7792
06/04/2025104662152Open ↗
11/06/2024104231412Open ↗
▸BIS* SPRAY ON FIREPROOF.-NEW INSTALL 27-324(F)2
10/10/2024104217973Open ↗
08/09/2024104217973Open ↗
▸BIS* FIRE STOPS 27-3452
11/06/2024104231412Open ↗
10/10/2024104217973Open ↗
▸BIS* REFRIGERATION SYSTEM 27-7811
11/06/2024104231412Open ↗