← Back
BuildNYC
Parochial school, yeshiva
Barkai Yeshivah
5302 21ST AVENUE · BIN 3131092
💬 Discuss this project
1931Year Built
2Stories
W2Building Class
R5Zoning
—Gross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: Barkai Foundation · 3 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarBarkai Yeshiva1 filing · 3 docs
Filed — no permit issuedBarkai Yeshiva33p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Capitol Audio & Video1303/21/2026
Barkai Foundation1010/13/2026
5300 21 AVE103/21/2026
Agecny103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Wexler Associates107/15/2026
Building Studio Architects107/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pillori Associates2317107/29/2025
Building Lifecycle
All (52)Filed (2)Violation (17)Objection (11)Special Inspection (22)
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Resolved
07/22/2026
Objection raised — Other
07/22/2026
Objection raised — Admin
07/22/2026
Objection raised — Other
07/15/2026
Filed — Alteration
DESIGN OF REINFORCEMENT FOR NEW 2-STORY REINFORCEMENT
B01428836-I1
07/15/2026
Special inspection requirement — Post-installed anchors in masonry
07/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/13/2026
Special inspection requirement — Structural Steel - Details
07/13/2026
Special inspection requirement — Subgrade Inspections
07/13/2026
Special inspection requirement — Structural Steel - Welding
07/13/2026
Special inspection requirement — Post-installed Anchors
07/13/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
07/09/2026
Special inspection requirement — Footing and Foundation
07/09/2026
Special inspection requirement — Final
11/06/2025
Violation issued (FDNY_ORDER, closed)
10/16/2025
Special inspection requirement — Combustible Exterior Wall Coverings
10/16/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Gregory Pillori
10/16/2025
Special inspection requirement — Demolition
Gregory Pillori
10/16/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Gregory Pillori
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/16/2025
Special inspection requirement — Post-installed Anchors
10/16/2025
Special inspection requirement — Sprayed fire-resistant materials
10/16/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/06/2025
Objection raised — Zoning
08/06/2025
Objection raised — Zoning
08/06/2025
Objection raised — Zoning
08/06/2025
Objection raised — Zoning
08/06/2025
Objection raised — Zoning
07/29/2025
Filed — Alteration CO
Filing for DOB denial for BSA - alteration application to add multiple stories and do interior renovation
B01258042-I1
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/19/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2004
Violation issued (ECB, closed)
Construction
05/11/2004
Violation issued (ECB, closed)
Construction
01/04/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/1999
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDReliable Plumbing & Heating08/31/2004
BISEQISSUEDRockledge Scaffold05/24/2004
BISPLISSUEDReliable Plumbing & Heating11/18/2003
BISEQISSUEDRockledge Scaffold09/22/2003
BISOTISSUEDPirot & Associates08/29/2003
BIS—ISSUEDReggev Construction03/24/2003
BISEQISSUEDJBM General Contracting09/04/1998
BIS—ISSUEDJBM General Contracting09/04/1998
1 project · most recent 07/15/2026
Steel Concrete
FiledStatusContractorScope
07/15/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/15/2026Post-installed anchors in masonry—special
07/14/2026Subsurface Investigations (Borings/Test Pits)—special
07/13/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/13/2026Structural Stability – Alterations of existing buildings—special
07/13/2026Structural Steel - Details—special
07/13/2026Subgrade Inspections—special
07/13/2026Structural Steel - Welding—special
07/13/2026Post-installed Anchors—special
07/13/2026Structural Steel - High Strength Bolting—special
07/13/2026Concrete - Cast-In-Place—special
07/09/2026Footing and Foundation—progress
07/09/2026Final—progress
10/16/2025Combustible Exterior Wall Coverings—special
10/16/2025Construction Operations Influencing Adjacent StructuresGregory Pillorispecial
10/16/2025DemolitionGregory Pillorispecial
10/16/2025Exterior Insulation and Finish Systems (EIFS)Gregory Pillorispecial
10/16/2025Fire-Resistant Penetrations and Joints—special
10/16/2025Post-installed Anchors—special
10/16/2025Sprayed fire-resistant materials—special
10/16/2025Wall Panels, Curtain Walls, and Veneers—special
10/16/2025Energy Code Compliance Inspections—progress
10/16/2025Fire-Resistance Rated Construction—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Barkai YeshivaEducationCellar
Project B01428836 Alteration · Approved · 07/15/2026
Project B01258042 Alteration CO · Objections · 07/29/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01258042-I1Request digital key ↗
08/14/2026B01428836-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01258042-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01428836-I1Open ↗
08/13/2026B01258042-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01258042-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/14/2026B01428836-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/14/2026B01428836-I1Open ↗
08/13/2026B01258042-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/13/2026B01258042-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01258042-I1Open ↗