← Back
Multi-story retail building (2+)
531 86 STREET
BROOKLYN · BIN 3153220
💬 Discuss this project
1926Year Built
2Stories
K2Building Class
C4-2AZoning
32,941 sfGross Floor Area
4Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: CA 531 86TH STREET LLC · 18,100 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 2 filings · 12 docs
Floor 27p · 5 filings · 20 docs
Floor 16p · 4 filings · 20 docs
Mezzanine10p · 4 filings · 20 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACHS MANAGMENT2807/08/2026
CA 531 86TH STREET LLC103/22/2026
E P ASSOCIATES1803/22/2026
E&P ASSOCIATES WAYNE EISE103/22/2026
EISENBAUM103/22/2026
OWNER OF 531-36 ST103/22/2026
ALL IN PERMIT CONSULTANTS103/22/2026
DYKER ASSOCIATES, W.E. DYKER, LL203/21/2026
NEW YORK & COMPANY203/21/2026
DYKER ASSOCIATES2803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2020$14.1M—— → —$429/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC702/16/2026
YOU GAO305/06/2025
BGM ENGINEERING112/17/2024
BRICOLAGE DESIGNS312/13/2024
CELIN MUNOZ CONSULTING ENGINEER, PC108/07/2024
SALVATOR A. CARADONNA JR.203/16/2023
JOSE L. PENA,P.E.103/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AXIUM CONSTRUCTION1403/21/2026
BRICOLAGE DESIGNS503/21/2026
INDESIGN STUDIO603/21/2026
LOUIS STRIAR203/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AXIUM CONSTRUCTION CORPGeneral Contractor507/08/2026
NEPTUNE SIGNS AWNINGSScaffold407/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
ACTIVE SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803502/16/2026
YOU GAO9407305/06/2025
Building Lifecycle
All (214)Filed (18)Permit Issued (12)Signed Off (11)Violation (58)Inspection (7)Objection (78)Special Inspection (30)
06/08/2026
Signed off — Alteration
B01251816-I1
05/05/2026
Signed off — Alteration
INSTALL CONSTRUCTION FENCE AS PER PLANS
B01044616-S2
03/16/2026
Permit issued — Mechanical Systems
B01251816-I1-MS
02/16/2026
Filed — Alteration
B01251816-I1
01/20/2026
Signed off — Alteration
B01094630-I1
12/16/2025
Signed off — Alteration
B01156587-I1
12/16/2025
Signed off — Alteration
INSTALLATION OF PLUMBING FOR SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01096767-I1
12/16/2025
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR ORANGETHEORY FITNESS.
B00822437-I1
12/16/2025
Permit issued — Mechanical Systems
B01094630-I1-MS
12/15/2025
Permit issued — Sign
B00822437-I1-SG
10/27/2025
Permit issued — Structural
B01156587-I1-ST
09/16/2025
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01212215-I1
08/26/2025
Permit issued — Sign
B01212215-I1-SG
08/19/2025
Violation issued (FDNY_ORDER, closed)
07/07/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
07/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
07/07/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
07/07/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
05/06/2025
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01212215-I1
05/06/2025
Signed off — Alteration
B01212228-I1
05/06/2025
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01212229-I1
04/30/2025
Permit issued — Sign
B01212229-I1-SG
04/30/2025
Permit issued — Sign
B01212228-I1-SG
04/22/2025
Filed — Alteration
B01212228-I1
04/22/2025
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01212229-I1
04/17/2025
Special inspection requirement — Final
You Gao
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
04/02/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01093235-I1
04/02/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/26/2025
Filed — Alteration
INSTALLATION OF PLUMBING FOR SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01096767-P3
03/26/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/25/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/19/2025
Filed — Alteration
INSTALLATION OF PLUMBING FOR SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01096767-P2
03/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/18/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/14/2025
Filed — Alteration
INSTALLATION OF PLUMBING FOR SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01096767-P1
03/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/20/2024
Objection raised — Zoning
12/20/2024
Objection resolved — Addressed
12/20/2024
Objection raised — Fire_Protection
12/20/2024
Objection resolved — Addressed
12/20/2024
Objection raised — Structural
12/20/2024
Objection resolved — Addressed
12/20/2024
Objection raised — Fire_Protection
12/20/2024
Objection resolved — Addressed
12/20/2024
Objection raised — Fire_Protection
12/20/2024
Objection resolved — Addressed
Latest 60 of 214 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAXIUM CONSTRUCTION03/16/2026
DOB NOWMechanical SystemsSigned-offAXIUM CONSTRUCTION12/16/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH12/15/2025
DOB NOWStructuralSigned-offAXIUM CONSTRUCTION10/27/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH08/26/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH04/30/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH04/30/2025
DOB NOWSprinklersSigned-offANTHONY CAIAZZO11/13/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR10/15/2024
DOB NOWGeneral ConstructionSigned-offAXIUM CONSTRUCTION10/04/2024
DOB NOWFoundationSigned-offAXIUM CONSTRUCTION09/19/2024
DOB NOWSignSigned-offACTIVE SIGNS INC04/12/2019
BIS—ISSUEDAXIUM CONSTRUCTION CORP12/30/2024
BIS—ISSUEDAXIUM CONSTRUCTION CORP07/09/2024
BIS—ISSUEDAXIUM CONSTRUCTION CORP04/26/2024
BISPLISSUEDULTIMATE PLBG AND HTG COR03/13/2020
BISOTISSUEDN-STORE SERVICES LLC07/23/2019
BISSPISSUEDULTIMATE P & H CORP03/07/2019
BISPLISSUEDULTIMATE PLBG AND HTG COR02/19/2019
BISMHISSUEDN-STORE SERVICES LLC02/12/2019
BISOTISSUEDN-STORE SERVICES LLC02/12/2019
BIS—ISSUEDFRANK TORRONE & SONS INC12/22/2017
BISMHISSUEDCOIL TECHS HVAC SERVICES10/11/2017
BISOTISSUEDFAST TRACK ELECTRIC CORP02/16/2016
BISFPISSUEDFIREMASTERS05/15/2014
BIS—ISSUEDCONBOY & MANNION CONTRACT05/12/2014
BISEQISSUEDCONBOY & MANNION CONTRACT04/04/2014
BIS—ISSUEDMAUCERI SIGN CO., INC03/19/2014
BIS—ISSUEDMAUCERI SIGN CO., INC03/19/2014
BISPLISSUEDADVANCED PLBG LLC03/14/2014
BISSPISSUEDADVANCED PLUMBING LLC03/14/2014
BISOTISSUEDCONBOY & MANNION CONTRACT02/28/2014
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/30/2013
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/30/2013
BISSPISSUEDUNITED STATES SPRINKLER04/29/2013
BISEQISSUEDHENRY MODELL & CO. INC03/14/2013
BISOTISSUEDHENRY MODELL & CO. INC03/14/2013
BISOTISSUEDHENRY MODELL & CO. INC01/07/2013
BISMHISSUEDDONNELLY MECHANICAL CORP04/02/2008
BIS—ISSUEDPARKER SERVICE INDUSTRIES10/01/2003
+ 21 more permits on file
4 projects · most recent 04/10/2025
General Wiring
FiledStatusContractorScope
04/10/2025CompleteALL PURPOSE ELECTRIC CORPGeneral Wiring
03/02/2023CancelledRAINBOW ELECTRIC CO., INC—
04/23/2019CompleteROBERT S. COVELLO—
02/08/2019CompleteM.C. ELECTRICAL NY INCGeneral Wiring
1 project · most recent 08/07/2024
Steel Concrete
FiledStatusContractorScope
08/07/2024Signed-offAXIUM CONSTRUCTION CORPSteel, Concrete
1 project · most recent 08/07/2024
Fence
FiledStatusContractorScope
08/07/2024Signed-offAXIUM CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/02/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/07/2025Mechanical SystemsSAMI HAJJAR P.Especial
07/07/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/07/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
07/07/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/07/2025FinalSAMI HAJJAR P.Eprogress
04/17/2025FinalYou Gaoprogress
04/17/2025Structural Stability – Alterations of existing buildingsYou Gaospecial
03/26/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/26/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/26/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/26/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/25/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/25/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/25/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/25/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/18/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/18/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/18/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/18/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/10/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/10/2024Public Assembly Emergency LightingSAMI HAJJAR P.Eprogress
12/10/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/10/2024HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/10/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
08/12/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
Latest 25 of 36.
▾Documents — 422 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
08/27/2026B00822437-I1Request digital key ↗
08/27/2026B00822437-P1Request digital key ↗
08/24/2026B01044616-S2Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/23/2026B01153999-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00135806-I1Request digital key ↗
▸Applications & Permits72
▸BISPLAN / WORK APPROVAL APPLICATION45
10/29/2025321783361Open ↗
05/07/2025320897534Open ↗
05/05/2025320897534Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION23
04/30/2024320897534Open ↗
03/16/2020321760661Open ↗
07/23/2019321760661Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
12/05/2019321760661Open ↗
12/08/2016321238718Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/21/2018321783361Open ↗
▸Seals & Professional Certifications92
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
05/22/2019340662535Open ↗
05/22/2019340662535Open ↗
02/04/2019321760661Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026B00135806-I1Open ↗
08/27/2026B00822437-P1Open ↗
08/27/2026B00822437-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/27/2026B00822437-P1Open ↗
09/01/2026B01094630-I1Open ↗
09/01/2026B01094630-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
02/04/2019321760661Open ↗
10/12/2017321667255Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/21/2019340662535Open ↗
10/12/2017321667255Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
02/21/2019340662535Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01093235-I1Open ↗
09/01/2026B01094630-I1Open ↗
09/01/2026B01212215-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)3
02/04/2019321760661Open ↗
02/04/2019321760661Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment34
▸BISEQUIPMENT USE APPLICATION-PERMIT10
11/03/2014340118679Open ↗
11/03/2014340118679Open ↗
08/20/2020321760661Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
03/11/2021321912551Open ↗
09/12/2017321390473Open ↗
02/16/2016321238718Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
06/10/2015340118679Open ↗
05/27/2015340118679Open ↗
11/06/2014340118679Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
03/16/2020321760661Open ↗
02/04/2019321760661Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
08/20/2020321760661Open ↗
12/04/2017321667255Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
02/21/2019340662535Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
05/27/2015340118679Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
03/04/2019321912551Open ↗
02/21/2019340662535Open ↗
02/04/2019321760661Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026B00135806-I1Open ↗
08/27/2026B00822437-P1Open ↗
08/27/2026B00822437-I1Open ↗
Showing 3 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
02/04/2019321760661Open ↗
02/04/2019321760661Open ↗
10/22/2018321783361Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
02/13/2026340662535Open ↗
08/12/2020321760661Open ↗
12/04/2017321667255Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections3
11/06/2014340118679Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/21/2019340662535Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/12/2020321760661Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/13/2026340662535Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/18/2026B01251816-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/12/2020321760661Open ↗
03/07/2019340662535Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/16/2018321783361Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/26/2019320897534Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01044616-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01044616-S2Open ↗
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
09/30/2021321912551Open ↗
08/20/2020321760661Open ↗
04/03/2019320897534Open ↗
Showing 3 of 31 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE17
05/07/2025320897534Open ↗
05/05/2025320897534Open ↗
05/02/2025320897534Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/14/2015320930739Open ↗
02/14/2015320930739Open ↗
02/12/2015320897534Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT26
09/30/2021321912551Open ↗
08/20/2020321760661Open ↗
03/04/2019321912551Open ↗
Showing 3 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/20/2025340662535Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION29
04/03/2019320897534Open ↗
03/26/2019320897534Open ↗
03/04/2019320897534Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING COVER SHEET12
03/04/2019321912551Open ↗
02/04/2019321760661Open ↗
02/04/2019321760661Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
04/03/2019320897534Open ↗
03/26/2019320897534Open ↗
03/04/2019320897534Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
02/21/2019340662535Open ↗
Showing 1 of 4 on file for this type
▸Other Documents8
▸BISOP-4 - Special Report4
11/06/2014340118679Open ↗
Showing 1 of 4 on file for this type
▸BISPLOT DIAGRAM2
09/21/2018321783361Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/19/2024320897534Open ↗
▸BISSupporting Document: Fee Exempt1
08/09/2017321390473Open ↗