DOB11/18/1997VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB11/18/1997V-DOB VIOLATION - ACTIVE
DOB09/01/1994V-DOB VIOLATION - ACTIVE
DOB08/10/1994STOP WORK ORDER
DOB07/13/1994PERMIT REVOKED- STOP WORK ORDER
DOB04/19/1994PERMIT REVOKED-STOP WORK ORDER
DOB05/17/1993V-DOB VIOLATION - ACTIVE
DOB05/17/1993VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB05/17/1993V-DOB VIOLATION - ACTIVE
DOB09/29/1992V-DOB VIOLATION - ACTIVE
DOB09/16/1992VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
ECB10/31/2011ALTERED BUILDING IS OCCUPIED W/O A VALID C OF O. NOTED: 1 FAMILY DWELLING CONVERTED TO CHURCH. CHURCH IS IN OPERATION W/O GETTING A FINAL C OF O. WORK PERFORMED UNDER ALT TYPE 1 30255113. AS PER 28-118.3.1 -Nothing owed — awaiting certificate of correction
ECB10/31/2011FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A C OF C. NOTE: FAILURE TO FILE A C OF C FOR 15 OUTSTANDING ECB VIOLATIONS. REMEDY: FILE ALL C OF C.Nothing owed — awaiting certificate of correction
ECB01/07/2000OCCUPANCY CONTRARY TO DEPT RECORDS. ONE FAMILY DWELLING CONVERTED TO CHURCH. DISCONTINUE ILLEGAL USE.Nothing owed — awaiting certificate of correction
ECB10/30/1999ALTERED BUILDING OCCUPIED WITHOUT A VALID C OF O JOB NUMBER 300225113.PERMIT ISSUED 8/13/93. CONVERSION OF EXISTING ONE FAMILY DWELLING TO CURRENT USE AS CHURCH COMMUNITY FACILITY. OBTAIN A VALID C OF O OCCUPANothing owed — awaiting certificate of correction
ECB09/22/1999OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPARTMENT RECORDS. FROM ONE FAMILY HOUSE TO A CHURCH. DISCONTINUE ILLEGALUSE.Nothing owed — awaiting certificate of correction
ECB08/06/1999ALTERED BUILDING OCCUPIED W/O A VALID CERTIFICATE O FOCCUPANCY BLDG ALT JOB 300207407 INTERIOR EXTERIOR RENOVATION OF A SINGLE FAMILY HOUSE REMEDY OBTAIN A VALID CONothing owed — awaiting certificate of correction
ECB07/28/1999WORK WITHOUT A PERMIT. WORK NOTED: MASONRY 1ST EXTENSION WAS CONSTRUC-TED AT REAR OF BLDG. NOTE EXTENSION AT REAR IS 1ST HIGH AND IS APPROX.40 LONG X WIDTH OF BLDG. JOB #300255113 INDICATES THAT AN APPLICATIONNothing owed — awaiting certificate of correction
ECB10/25/1998OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPT RECORDS. LEGAL USE 1 FAM NOW BEING OCCUPIED AS A CHURCH. REMEDY: DISCONTINUE ILLEGAL USE OR AMEND C OF O.Nothing owed — awaiting certificate of correction
ECB01/14/1998WORK WITHOUT A PERMIT. WORK NOTED: FRONT MASONRY EXTENSION CONSTRUCTEDAPPROXIMATELY 20 FEET BY 6 FEET 10 FEET HIGH. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE THE PREMISES TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB01/14/1998ALTERED BUILIDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. ALTERATION NUMBER: 300255113. REMEDY: OBTAIN A VALID CERTIFICATE OF OCCUPANCY.Nothing owed — awaiting certificate of correction
ECB04/25/1994OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPARTMENT RECORDS.PRE-MISES HAS BEEN CHANGED FROM A PRIVATE DWELLING TO BEING ARRANGED AS A CHURCH FOR APPROX. 100 PEOPLE, WITH CHAIRS SET-UP IN ROWS FOR 25 PEOPLNothing owed — awaiting certificate of correction
ECB04/19/1994FAILURE TO COMPLY WITH STOP WORK ORDER ISSUED 12-07-93 IN CONJUNCTION WITH ECB VIOLATION #120793C17N01. REMEDY: STOP ALL WORK: NOTE: ALLINTERIOR SHEET ROCK WALLS AND CEILINGS, HAVE BEEN COMPLETED. INTERIONothing owed — awaiting certificate of correction
ECB12/07/1993REVOCATION OF PERMIT: STOP ALL WORK BASED ON REVOCATION OF PERMIT LET-TER DATED NOVEMBER 09-1993 REMEDY: STOP ALL WORK.Nothing owed — awaiting certificate of correction
ECB08/14/1993WORK WITHOUT A VARIANCE WORK NOTED FLAMING AND CLOSING EXTERIOR WALL REMEDY SOTP ALLWORK BEFORE 7AM AND AFTER 6PM MONDAY THRU FRIDAY AND AT ALL TIMES ON SATURDAY & SUNDAY UNLESS A VARIANCE IS OBTAINED FROM THISNothing owed — awaiting certificate of correction
ECB06/11/1993FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION REMEDY PROVIDE PLANSNothing owed — awaiting certificate of correction
ECB06/11/1993WORK WITHOUT A PERMIT WORK NOTED IN THAT HAVING CONSTRUCTED A 20FT X 6 FT FRONT EXTENTION WITHOUT THE PROPER PERMIT APPROVAL STOP ALL OWRK REMEDY OBTAIN THE NECESSARY PERMITS APPROVALSNothing owed — awaiting certificate of correction
ECB09/29/1992WORK WITHOUT A PERMIT: 1. EXCAVATION AT REAR YARD. (15'X2'X2'TRENCH). 2.FOOTING 40' AT REAR, PARTIAL FOUNDATION WALL APPROX. 3' HIGH CONS- TRUCTED AT PERIMETER OF REAR YARD. REMEDY: STOP ALL WORK OBTAIN NECESSNothing owed — awaiting certificate of correction