1975Year Built
20Stories
D4Building Class
R7-2Zoning
—Gross Floor Area
368Units
31 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: RIVERCROSS TENANTS' CORP. · 6.98 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 2 filings · 20 docs
Floor 12Under Construction9p · 2 filings · 20 docs
Floor 11Under Construction6p · 1 filing · 16 docs
Floor 10Under Construction6p · 1 filing · 16 docs
Floor 9Under Construction6p · 1 filing · 16 docs
Floor 8Under Construction6p · 1 filing · 16 docs
Floor 7Under Construction6p · 1 filing · 16 docs
Floor 6Under Construction6p · 1 filing · 16 docs
Floor 5Under Construction14p · 2 filings · 20 docs
Floor 4Under Construction14p · 2 filings · 20 docs
Floor 3Under Construction14p · 2 filings · 20 docs
Floor 2Under Construction17p · 3 filings · 20 docs
Floor 1Under Construction19p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP1407/08/2026
CRISTINA MICHAELS CONSTRUCTION MANA407/08/2026
C+C MANAGEMENT907/08/2026
VIK XS SERVICES606/27/2026
ROOSEVELT ISLAND HOUSING103/22/2026
DEPT. OF GENERAL SERVI856103/22/2026
HPD 806103/22/2026
STEEL SYSTEMS403/21/2026
ROOSEVELT LANDINGS OWNER LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1203/21/2026
Rigid Structural Design, LLC1103/21/2026
NEW YORK ENGINEERING ASSOCIATES P1003/21/2026
AO CONSULTING AND DRAFTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor1407/08/2026
GM ENTERPRISE, CORPGeneral Contractor804/09/2026
JASA NYC GROUP INCGeneral Contractor507/08/2026
VIK XS SERVICES INCGeneral Contractor207/08/2026
NAT'L MECH. SVCS PLBG LLCPlumbing207/08/2026
GEORGE BASSOLINOPlumbing103/21/2026
JOSEPH SORTINOElectrical103/21/2026
PLBG P & H INCPlumbing107/08/2026
ZITO, ROCCOElectrical103/21/2026
4 BROTHERS & SONS FENCEGeneral Contractor104/09/2026
MJE MECHANICAL LLCGeneral Contractor107/08/2026
G.BASSOLINO PLUMBING LTDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843411/20/2025
AG ENGINEERING PLLC8899107/22/2025
NEW YORK ENGINEERING ASSO851506/18/2024
Building Lifecycle
All (161)Filed (22)Permit Issued (29)Signed Off (12)Facade (FISP) (3)Violation (60)Inspection (5)Special Inspection (30)
07/21/2026
Signed off — Alteration
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01199292-I1
07/16/2026
Violation issued (ECB, open)
Elevators
07/06/2026
Violation issued (HPD, closed)
C
07/06/2026
Violation issued (HPD, open)
B
07/04/2026
Violation issued (HPD, open)
A
07/04/2026
Violation issued (HPD, open)
A
07/04/2026
Violation issued (HPD, closed)
B
06/24/2026
Signed off — Alteration
Exterior Renovations to existing Multi-Family building including overcladding with exterior insulation finish system (EIFS) on lower Level and Floors 1-5, Roof. No other work is proposed. There is no change to the proposed use, egress or occupancy
M00468985-S1
06/23/2026
Signed off — Alteration
M01127115-I1
06/23/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01267819-I1
06/23/2026
Permit issued — Suspended Scaffold
M00468985-S1-SC
06/18/2026
Permit issued — Suspended Scaffold
M00468959-S2-SC
06/17/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
M00468959-S2
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
C
06/17/2026
Violation issued (HPD, closed)
C
06/17/2026
Violation issued (HPD, open)
C
06/08/2026
Signed off — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
M00468959-S1
05/30/2026
Violation issued (ECB, closed)
Unknown
05/15/2026
Violation issued (HPD, open)
I
05/15/2026
Violation issued (HPD, closed)
I
05/15/2026
Violation issued (HPD, closed)
I
05/15/2026
Violation issued (HPD, closed)
I
05/14/2026
Permit issued — Protection and Mechanical Methods
M01127115-I1-PMM
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, open)
C
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, open)
C
05/12/2026
Violation issued (HPD, open)
B
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, open)
B
05/12/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, open)
B
05/12/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
B
04/30/2026
Violation issued (HPD, open)
A
04/23/2026
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01211231-I1
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, closed)
C
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, open)
B
04/18/2026
Violation issued (HPD, open)
B
04/18/2026
Violation issued (HPD, closed)
B
04/03/2026
Violation issued (HPD, open)
C
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offCRISTINA MICHAELS CONS MN06/23/2026
DOB NOWSuspended ScaffoldPermit IssuedCRISTINA MICHAELS CONS MN06/18/2026
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWGeneral ConstructionPermit IssuedGM ENTERPRISE, CORP02/19/2026
DOB NOWGeneral ConstructionPermit IssuedJASA NYC GROUP INC11/13/2025
DOB NOWGeneral ConstructionPermit IssuedJASA NYC GROUP INC11/13/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP10/15/2025
DOB NOWGeneral ConstructionPermit IssuedGM ENTERPRISE, CORP08/14/2025
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP08/08/2025
DOB NOWSuspended ScaffoldSigned-offCRISTINA MICHAELS CONS MN07/09/2025
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE05/06/2025
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP05/01/2025
DOB NOWGeneral ConstructionPermit IssuedJASA NYC GROUP INC03/24/2025
DOB NOWGeneral ConstructionPermit IssuedJASA NYC GROUP INC03/24/2025
DOB NOWSuspended ScaffoldSigned-offCRISTINA MICHAELS CONS MN03/07/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP10/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP10/17/2024
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC06/18/2024
DOB NOWGeneral ConstructionPermit IssuedVIK XS SERVICES INC06/14/2024
DOB NOWPlumbingSigned-offG.BASSOLINO PLUMBING LTD06/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/13/2024
DOB NOWPlumbingSigned-offNAT'L MECH. SVCS PLBG LLC04/30/2024
DOB NOWGeneral ConstructionPermit IssuedVIK XS SERVICES INC03/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP09/13/2023
DOB NOWPlumbingSigned-offNAT'L MECH. SVCS PLBG LLC05/30/2023
DOB NOWGeneral ConstructionSigned-offGM ENTERPRISE, CORP01/13/2022
DOB NOWMechanical SystemsPermit IssuedGM ENTERPRISE, CORP01/07/2022
DOB NOWMechanical SystemsPermit IssuedMJE MECHANICAL LLC10/14/2021
DOB NOWPlumbingSigned-offPLBG P & H INC08/09/2021
BISEQISSUEDSTEEL SYSTEMS LLC07/07/2016
BISEQISSUEDSTEEL SYSTEMS LLC08/10/2015
BISEQISSUEDSTEEL SYSTEMS LLC07/08/2015
BISEQISSUEDROMA SCAFFOLDING INC02/06/2014
BISEQISSUEDROMA SCAFFOLDING INC02/06/2014
BISEQISSUEDROMA SCAFFOLDING INC05/06/2013
BISEQISSUEDROMA SCAFFOLDING INC05/06/2013
BISPLISSUEDWAWEL PLBG AND HTG CORP04/30/2013
BISMHISSUEDEVCO MECHANICAL CORP04/15/2013
1 project · most recent 11/20/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/20/2025Permit IssuedGM ENTERPRISE, CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXAQ09PVJU 9,500 BTU · Vrf Indoor ×8
FXMQ72MVJU 6 tons · Vrf Indoor ×4
FXAQ07PVJU 7,500 BTU · Vrf Indoor ×2
FXAQ18PVJU 18,000 BTU · Vrf Indoor ×2
FXAQ24PVJU 24,000 BTU · Vrf Indoor ×2
RXYQ168TATJA 14 tons · Vrf Outdoor ×2
RXYQ72TATJA 6 tons · Vrf Outdoor ×2
Ventilation
Greenheck SQ-60-VG 100 CFM · Exhaust Fan ×2
4 projects · most recent 10/15/2024
General Wiring
FiledStatusContractorScope
10/15/2024CompleteTOP SHELF ELECTRIC CORP—
08/22/2023CompleteTOP SHELF ELECTRIC CORP—
10/12/2022CompleteP & Z ELECTRIC CORPGeneral Wiring
08/09/2019CompletePINPOINT ELECTRIC CORPGeneral Wiring
2 projects · most recent 08/07/2025
Sidewalk Shed Fence
FiledStatusContractorScope
08/07/2025Signed-offSKYLINE SCAFFOLDING GROUPSidewalk Shed
05/05/2025Signed-off4 BROTHERS & SONS FENCEFence
2 projects · most recent 06/17/2026
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
06/17/2026Permit IssuedCRISTINA MICHAELS CONS MNSuspended Scaffold
07/22/2025Permit IssuedGM ENTERPRISE, CORPTenant Protection Plan 72 Hour
1 project · most recent 06/17/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/17/2026Permit IssuedCRISTINA MICHAELS CONS MNSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/29/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
12/29/2025Mechanical SystemsJOHN MCMONAGLEspecial
12/29/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
12/29/2025FinalJOHN MCMONAGLEprogress
12/29/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
07/22/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
07/18/2025FinalNICHOLAS BRINENprogress
06/05/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
06/05/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
06/05/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
06/05/2025FinalJOHN MCMONAGLEprogress
06/05/2025Mechanical SystemsJOHN MCMONAGLEspecial
04/25/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
04/25/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/25/2023Exterior Insulation and Finish Systems (EIFS)Jennifer Szespecial
10/25/2023Energy Code ComplianceJennifer Szeprogress
10/25/2023FinalJennifer Szeprogress
10/25/2023Insulation placement and R valuesJennifer Szeenergy_progress
10/13/2023Exterior Insulation and Finish Systems (EIFS)Jennifer Szespecial
10/13/2023Energy Code ComplianceJennifer Szeprogress
10/13/2023Insulation placement and R valuesJennifer Szeenergy_progress
10/13/2023FinalJennifer Szeprogress
05/12/2021Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/12/2021Lighting controlsJOHN MCMONAGLEenergy_progress
05/12/2021Interior lighting powerJOHN MCMONAGLEenergy_progress
Latest 25 of 31.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch15
09/03/2026M00468959-S1Request digital key ↗
09/03/2026M00468959-S2Request digital key ↗
08/29/2026M00932986-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/03/2026M00477209-I1Request digital key ↗
09/03/2026M00468959-I1Request digital key ↗
08/27/2026M00468985-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/20/2026M00477218-I1Request digital key ↗
08/20/2026M00477218-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00477227-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION9
07/13/2016140370480Open ↗
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
04/04/2014121555138Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026M01033643-P1Open ↗
09/01/2026M00477218-P1Open ↗
09/01/2026M00477218-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/03/2026M00477227-I1Open ↗
09/03/2026M00468959-I1Open ↗
09/03/2026M00468959-S2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M01033643-P1Open ↗
09/01/2026M00477218-P1Open ↗
08/28/2026M01257896-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
05/03/2013140071785Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
05/03/2013140071785Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
05/03/2013140071785Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/14/2017121555138Open ↗
01/30/2015121555138Open ↗
03/28/2013121555138Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
09/05/2013121555138Open ↗
03/28/2013121555138Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/04/2014121555138Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/28/2013121555138Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/05/2014121555138Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00468959-I1Open ↗
08/28/2026M00874371-P1Open ↗
08/28/2026M00874371-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/03/2026M00477227-I1Open ↗
08/13/2026M00477209-I1Open ↗
08/13/2026M00477218-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/07/2015140387445Open ↗
03/28/2013121555138Open ↗
▸Energy Compliance2
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/06/2015140370480Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00477209-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
05/03/2013140071785Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/03/2026M00477227-I1Open ↗
08/28/2026M00874371-P1Open ↗
08/28/2026M00874371-I1Open ↗
Showing 3 of 18 on file for this type
▸BISLANDMARKS APPROVAL2
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/30/2015121555138Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/28/2013121555138Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/13/2016140370480Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
03/28/2013121555138Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/30/2015121555138Open ↗
04/15/2013121555138Open ↗
03/28/2013121555138Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET4
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗
05/03/2013140071785Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
09/13/2013121555138Open ↗
▸BISEFILING COVER SHEET1
03/28/2013121555138Open ↗
▸Other Documents8
▸DOB NOWCalculations3
09/03/2026M00468959-S2Open ↗
08/13/2026M00468959-S1Open ↗
08/13/2026M00468985-S1Open ↗
▸DOB NOWManufacturer's Specifications3
09/03/2026M00468959-S2Open ↗
08/13/2026M00468959-S1Open ↗
08/13/2026M00468985-S1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
08/07/2015140387445Open ↗
07/06/2015140370480Open ↗