← Back
BuildNYC
Two stories - detached, small or mid-size
531 RICHARD AVENUE
STATEN ISLAND · BIN 5175670
💬 Discuss this project
2024Year Built
2Stories
A1Building Class
R3XZoning
2,567 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: The L&L Morgan Protective Trust Dated 8/ 10/20 · 4,204 sf lot · 0.61 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDetached One Family Residences2p · 1 filing · 20 docs
Floor 2Detached One Family Residences26p · 2 filings · 20 docs
Floor 1Detached One Family Residences53p · 2 filings · 20 docs
BasementDetached One Family Residences1p · 1 filing · 20 docs
Site & exteriorDetached One Family Residences7p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group505/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rogers Calvanico Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ashland BuildingGeneral Contractor507/08/2026
Capital Contracting P&Hspecialty_contractor407/08/2026
R&M Piping & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677405/20/2024
C&P Design Consultant8472202/28/2024
Building Lifecycle
08/06/2024
Permit expired, never signed off — Earth Work
The city's record still shows this permit as issued, with no sign-off on its filing
S00852433-I1-GC-CX
06/12/2024
Signed off — New Building
Installation of new water service with BFPA & and fire sprinkler system
S00852433-S2
06/12/2024
Signed off — New Building
Installation of new water service with BFPA & and fire sprinkler system
S00852433-S1
06/07/2024
Signed off — New Building
Installation of new water service with BFPA & and fire sprinkler system
S00852433-S3
06/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMark Erdman05/13/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H04/22/2024
DOB NOWEarth WorkPermit IssuedMark Erdman02/13/2024
DOB NOWPlumbingSigned-offR&M Piping & Heating01/26/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H10/06/2023
DOB NOWPlumbingSigned-offCapital Contracting P&H07/27/2023
DOB NOWSprinklersSigned-offCapital Contracting P & H07/27/2023
DOB NOWStructuralPermit IssuedMark Erdman06/08/2023
1 project · most recent 05/20/2024
Sprinkler System
FiledStatusContractorScope
05/20/2024Signed-offCapital Contracting P & HSprinkler System
1 project · most recent 05/20/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2024Signed-offCapital Contracting P&HGas, Storm, Water/Sanitary
1 project · most recent 08/23/2023
General Wiring
FiledStatusContractorScope
08/23/2023CompleteD and H Electrical ConstructionGeneral Wiring
1 project · most recent 05/20/2024
Steel Wood
FiledStatusContractorScope
05/20/2024Signed-offAshland BuildingSteel, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/30/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/18/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
05/21/2024Subgrade InspectionsWILLIAM MONTAGUEspecial
05/21/2024Structural Steel - DetailsWILLIAM MONTAGUEspecial
05/21/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
05/21/2024Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
05/21/2024Structural Steel - WeldingWILLIAM MONTAGUEspecial
05/21/2024Wood – Prefabricated I-JoistsWILLIAM MONTAGUEspecial
05/21/2024Mechanical SystemsWILLIAM MONTAGUEspecial
05/21/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)WILLIAM MONTAGUEspecial
05/21/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
05/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
05/21/2024Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
05/21/2024FinalWILLIAM MONTAGUEprogress
05/21/2024Lowest Floor ElevationWILLIAM MONTAGUEprogress
05/21/2024Footing and FoundationWILLIAM MONTAGUEprogress
05/21/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
05/21/2024Structural Wood FrameWILLIAM MONTAGUEprogress
05/21/2024Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
05/21/2024Fenestration areasWILLIAM MONTAGUEenergy_progress
05/21/2024Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
05/21/2024Fenestration air leakageWILLIAM MONTAGUEenergy_progress
05/21/2024FireplacesWILLIAM MONTAGUEenergy_progress
05/21/2024Air barrier — testing WILLIAM MONTAGUEenergy_progress
05/21/2024Maintenance informationWILLIAM MONTAGUEenergy_progress
05/21/2024Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
05/21/2024Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
Latest 25 of 70.
62 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account