← Back
BuildNYC
Walk-up cooperative
5312 FILLMORE AVENUE
BROOKLYN · BIN 3337557
💬 Discuss this project
1955Year Built
2Stories
C6Building Class
R5Zoning
25,424 sfGross Floor Area
28Units
0 Active ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: Fillmore Gardens Co-Operative · 43,200 sf lot · 0.59 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Partial cellar demolition and mechanical work1p · 2 filings · 11 docs
CellarPartial cellar demolition and mechanical work14p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering510/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
John Fitzgerald Plumbing & HeatingPlumbing207/08/2026
STX ElectricalElectrical103/22/2026
Allpro General CntrtingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808305/26/2023
Building Lifecycle
All (26)Filed (5)Permit Issued (3)Signed Off (3)Violation (3)Inspection (4)Special Inspection (8)
11/03/2023
Signed off — Alteration
REPLACEMENT OF ONE HEATING HOT WATER BOILER AND GAS BURNER. INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857232-I1
11/03/2023
Signed off — Alteration
INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. CONNECT EXISTING GAS SERVICE PIPING TO REPLACEMENT BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857216-I1
11/03/2023
Signed off — Alteration
REPLACE ONE HEATING HOT WATER BOILER AND GAS BURNER. INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857202-I1
10/10/2023
Filed — Alteration
INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. CONNECT EXISTING GAS SERVICE PIPING TO REPLACEMENT BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857216-P2
10/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
10/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Filed — Alteration
INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. CONNECT EXISTING GAS SERVICE PIPING TO REPLACEMENT BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857216-P1
08/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
08/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/10/2023
Permit issued — Plumbing
B00857216-I1-PL
07/10/2023
Permit issued — Boiler Equipment
B00857202-I1-BE
06/27/2023
Permit issued — Mechanical Systems
B00857232-I1-MS
05/26/2023
Filed — Alteration
REPLACE ONE HEATING HOT WATER BOILER AND GAS BURNER. INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857202-I1
05/17/2023
Filed — Alteration
REPLACEMENT OF ONE HEATING HOT WATER BOILER AND GAS BURNER. INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857232-I1
05/17/2023
Filed — Alteration
INSTALL ONE NEW DOMESTIC HOT WATER HEATER AND STORAGE TANK PER PLANS. CONNECT EXISTING GAS SERVICE PIPING TO REPLACEMENT BOILER AND GAS BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00857216-I1
05/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
04/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
04/10/2023
Special inspection requirement — Final
Joseph Bazini
04/10/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
04/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/1986
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating07/10/2023
DOB NOWBoiler EquipmentSigned-offJohn Fitzgerald Plumbing & Heating07/10/2023
DOB NOWMechanical SystemsSigned-offAllpro General Cntrting06/27/2023
1 project · most recent 05/23/2023
Boiler Controls
FiledStatusContractorScope
05/23/2023CompleteSTX ElectricalBoiler Controls
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/10/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
10/02/2023Tenant Protection Plan Compliance—special
08/28/2023Tenant Protection Plan Compliance—special
05/17/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
04/10/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
04/10/2023FinalJoseph Baziniprogress
04/10/2023Mechanical SystemsJoseph Bazinispecial
04/10/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00857216-I1Request digital key ↗
08/27/2026B00857216-P1Request digital key ↗
08/27/2026B00857216-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00857216-P1Open ↗
08/27/2026B00857216-I1Open ↗
08/13/2026B00857202-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/04/2026B00857216-I1Open ↗
09/23/2026B00857202-I1Open ↗
09/01/2026B00857232-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B00857202-I1Open ↗
09/01/2026B00857232-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00857216-P1Open ↗
08/27/2026B00857216-I1Open ↗
08/13/2026B00857232-I1Open ↗
Showing 3 of 5 on file for this type