← Back
BuildNYC
Predominantly retail with other uses
5314 5TH AVENUE
BROOKLYN · BIN 3014258
💬 Discuss this project
1916Year Built
2Stories
K4Building Class
C4-3AZoning
13,975 sfGross Floor Area
4Units
0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: Foot Locker Specialty · 7,500 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFoot Locker3p · 2 filings · 16 docs
Floor 2Foot Locker1 filing · 6 docs
Floor 1Foot Locker14p · 4 filings · 19 docs
CellarFoot Locker14p · 3 filings · 20 docs
Site & exteriorFoot Locker3p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Footlocker3607/08/2026
Woolworth Co303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction110/05/2023
Leon Skvirsky PE205/11/2022
Chesapeake Design Group402/28/2022
Stratford101/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Empire City Consultants1003/21/2026
Lewsan Consulting203/21/2026
Building Brothers403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tom Rectenwald ConstructionGeneral Contractor403/21/2026
Tom Rectenwald ConstructionScaffold203/21/2026
Active SignsSign hanger207/08/2026
Lebo ElectricElectrical103/22/2026
Conditioning Control SystemsGeneral Contractor107/08/2026
Bluewater Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355110/05/2023
MEP Inspections1102101/07/2022
Metric Consulting and Ins1803101/06/2022
Building Lifecycle
All (54)Filed (8)Permit Issued (7)Signed Off (3)Violation (10)Inspection (2)Special Inspection (24)
12/04/2023
Signed off — Alteration
Install two (2) HVAC Split Systems
B00934015-I1
10/12/2023
Permit issued — Mechanical Systems
B00934015-I1-MS
10/05/2023
Filed — Alteration
Install two (2) HVAC Split Systems
B00934015-I1
10/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
10/03/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
10/03/2023
Special inspection requirement — Permanent certificate
Steven Bendoraitis
10/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
10/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
09/14/2023
Special inspection requirement — Final
Steven Bendoraitis
09/14/2023
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
09/09/2022
Signed off — Alteration
B00728442-I1
09/09/2022
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN (KIDS FOOT LOCKER)
B00728464-I1
06/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2022
Permit issued — Sign
B00728442-I1-SG
05/27/2022
Permit issued — Sign
B00728464-I1-SG
05/11/2022
Filed — Alteration
B00728442-I1
05/11/2022
Filed — Alteration
INSTALL ILLUMINATED WALL SIGN (KIDS FOOT LOCKER)
B00728464-I1
05/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2022
Special inspection requirement — Final
LEON SKVIRSKY
03/03/2022
Permit issued — Construction Fence
B00684956-I1-FN
02/28/2022
Filed — Alteration
TEMPORARY INSTALLATION OF PLYWOOD FENCE AT PERIMETER OF BUILDING.
B00684956-I1
02/22/2022
Permit issued — Plumbing
B00653909-I1-PL
01/12/2022
Permit issued — Mechanical Systems
B00653869-I1-MS
01/12/2022
Permit issued — General Construction
B00653793-I1-GC
01/07/2022
Filed — Alteration
RECONFIGURE EXISTING DUCT WORK TO AVOID NEW STEEL BEAM, DIFFUSERS TO BE DETERMINED.
B00653869-I1
01/06/2022
Filed — Alteration
B00653909-I1
01/06/2022
Filed — Alteration
MODIFICATION TO AN EXISTING RETAIL SPACE (FOOTLOCKER)
B00653793-I1
01/06/2022
Filed — Alteration
PATCH EXISTING SLAB, REMOVE DETERIORATED SLAB AS NEEDED.
B00653835-I1
01/06/2022
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
01/06/2022
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
01/06/2022
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
01/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
01/06/2022
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
01/05/2022
Special inspection requirement — Lighting controls
Nicolas Crosetto
01/05/2022
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
01/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
01/05/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicolas Crosetto
01/05/2022
Special inspection requirement — Interior lighting power
Nicolas Crosetto
12/27/2021
Special inspection requirement — Final
Nicolas Crosetto
12/27/2021
Special inspection requirement — Final
ROBERT GOLDMAN
12/27/2021
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
12/27/2021
Special inspection requirement — Final
Nicolas Crosetto
03/29/2019
Violation issued (FDNY_NOV, closed)
03/29/2019
Violation issued (FDNY_NOV, closed)
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/21/1993
Violation issued (ECB, closed)
Elevators
06/06/1990
Violation issued (ECB, closed)
Construction
04/20/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offConditioning Control Systems10/12/2023
DOB NOWSignSigned-offActive Signs05/27/2022
DOB NOWSignSigned-offActive Signs05/27/2022
DOB NOWConstruction FencePermit IssuedArtur Home Improvement03/03/2022
DOB NOWPlumbingSigned-offBluewater Plumbing & Heating02/22/2022
DOB NOWMechanical SystemsSigned-offArtur Home Improvement01/12/2022
DOB NOWGeneral ConstructionPermit IssuedArtur Home Improvement01/12/2022
BISMHISSUEDConcept Air Conditioning10/20/2014
BISOTISSUEDConcept Air Conditioning10/14/2014
BISOTISSUEDTurner Busch11/13/2012
BISOTISSUEDTurner Busch06/28/2012
BISOTRE-ISSUEDRussco04/23/2012
BISBLISSUEDAgee Heating Service04/14/2011
BISPLISSUEDJD Masters Plumbing & Heating04/08/2011
BIS—ISSUEDFrank Torrone and Sons01/14/1998
BIS—ISSUEDFrank Torrone and Sons01/14/1998
BIS—ISSUEDFrank Torrone and Sons01/14/1998
BISPLISSUEDMorton Chait12/11/1997
BISOTISSUEDAtlantic Construction11/25/1997
BISMHISSUEDF.w.woolworth Co05/13/1993
3 projects · most recent 06/19/2023
General Wiring
FiledStatusContractorScope
06/19/2023CompleteLebo ElectricGeneral Wiring
05/10/2022CompleteRainbow Electric Co—
05/10/2022CompleteRainbow Electric Co—
1 project · most recent 01/06/2022
Steel Concrete
FiledStatusContractorScope
01/06/2022——Steel, Concrete
1 project · most recent 02/28/2022
Fence
FiledStatusContractorScope
02/28/2022Permit IssuedTom Rectenwald ConstructionFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/03/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
10/03/2023Maintenance informationSteven Bendoraitisenergy_progress
10/03/2023Permanent certificateSteven Bendoraitisenergy_progress
10/03/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
10/03/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/28/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/28/2023Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/14/2023FinalSteven Bendoraitisprogress
09/14/2023Mechanical SystemsABDALLAH ELCHERBINIspecial
04/29/2022FinalLEON SKVIRSKYprogress
01/06/2022Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
01/06/2022Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
01/06/2022Post-installed AnchorsSAMI HAJJAR P.Especial
01/06/2022Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
01/06/2022Structural Steel - WeldingSAMI HAJJAR P.Especial
01/05/2022Lighting controlsNicolas Crosettoenergy_progress
01/05/2022Structural Steel - DetailsSAMI HAJJAR P.Especial
01/05/2022Energy Code Compliance InspectionsNicolas Crosettoprogress
01/05/2022Fenestration and door U-factor and product ratingsNicolas Crosettoenergy_progress
01/05/2022Interior lighting powerNicolas Crosettoenergy_progress
12/27/2021FinalNicolas Crosettoprogress
12/27/2021FinalROBERT GOLDMANprogress
12/27/2021Mechanical SystemsNicolas Crosettospecial
12/27/2021FinalNicolas Crosettoprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Foot LockerRetailEntire building
Project B00728464 Alteration · LOC Issued · 05/11/2022
Project B00684956 Alteration · Permit Entire · 02/28/2022
Project B00653869 Alteration · Permit Entire · 01/07/2022
Project B00653793 Alteration · Permit Entire · 01/06/2022
Project B00653835 Alteration · Approved · 01/06/2022
Project B00653909 Alteration · Permit Entire · 01/06/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026B00653793-I1Request digital key ↗
08/31/2026B00653835-I1Request digital key ↗
08/31/2026B00653909-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION8
10/21/2014321009243Open ↗
10/15/2014321009243Open ↗
11/19/2012320466875Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
10/15/2014321009243Open ↗
04/25/2012320466875Open ↗
07/21/2011320291153Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature13
09/20/2026B00728464-I1Open ↗
09/01/2026B00653869-I1Open ↗
08/28/2026B00934015-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026B00653793-I1Open ↗
08/31/2026B00653835-I1Open ↗
08/31/2026B00653909-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
10/28/2014321009243Open ↗
10/15/2014321009243Open ↗
04/25/2012320466875Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00653869-I1Open ↗
08/28/2026B00934015-I1Open ↗
08/26/2026B00653835-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/15/2014321009243Open ↗
04/25/2012320466875Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/15/2014321009243Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/25/2012320466875Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
07/21/2011320291153Open ↗
05/03/2011320291153Open ↗
04/25/2011320291153Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/15/2014321009243Open ↗
02/10/2015321009243Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/27/2011320291153Open ↗
▸BISEQUIPMENT USE PERMITS1
02/12/2015321009243Open ↗
▸BISSCHEDULE B - PLUMBING1
04/05/2011320291153Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/15/2014321009243Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026B00653835-I1Open ↗
08/31/2026B00653909-I1Open ↗
08/13/2026B00653869-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2014321009243Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/05/2011320291153Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
04/25/2012320466875Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026B00934015-I1Open ↗
▸Energy Compliance4
▸BISEN2 - As Built Energy Analysis2
02/10/2015321009243Open ↗
10/28/2014321009243Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/05/2011320291153Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/10/2015321009243Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
04/05/2011320291153Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
10/15/2014321009243Open ↗
04/26/2012320466875Open ↗
04/05/2011320291153Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST3
02/10/2015321009243Open ↗
12/10/2014321009243Open ↗
10/28/2014321009243Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/02/2012320466875Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/10/2015321009243Open ↗
10/28/2014321009243Open ↗
10/15/2014321009243Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
10/15/2014321009243Open ↗
04/25/2012320466875Open ↗
04/05/2011320291153Open ↗
▸BISADDITIONAL INFORMATION1
11/09/2011320291153Open ↗
▸Other Documents1
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
09/27/2011320291153Open ↗