← Back
Old law tenement
532 WEST 114 STREET
MANHATTAN · Morningside Heights · BIN 1057039
💬 Discuss this project
1905Year Built
4Stories
C4Building Class
R8Zoning
5,800 sfGross Floor Area
8Units
Rent Stabilized4 Open Violations ▸
Old law tenement · Owner of record: 532 W. 114TH ST. LLC · 2,018 sf lot · 2.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof23p · 1 filing · 20 docs
Floor 439p · 3 filings · 20 docs
Floor 342p · 3 filings · 20 docs
Floor 239p · 3 filings · 20 docs
Floor 140p · 3 filings · 20 docs
Cellar49p · 3 filings · 20 docs
Site & exterior9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
532 W. 114TH ST., LLC2203/22/2026
LEECO 532 REALTY203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2019$5.3M—— → —$914/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APPLIED HVAC ENGINEERING, PLLC405/22/2024
CHAN ASCHER ARCHITECTURE PLLC205/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN LIGHT EXPEDITING LLC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOTEM HOLDING INCGeneral Contractor903/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
APPLIED HVAC ENGINEERING,7563605/22/2024
RYAN SPECIAL ENGINEERING2018205/20/2023
Building Lifecycle
All (67)Filed (6)Permit Issued (4)Signed Off (1)Violation (14)Inspection (4)Objection (8)Special Inspection (30)
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
05/29/2024
Special inspection requirement — Maintenance information
Alexandra Herrera
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Alexandra Herrera
05/29/2024
Special inspection requirement — Final
Alexandra Herrera
05/29/2024
Special inspection requirement — Mechanical Systems
Alexandra Herrera
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
05/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
05/29/2024
Special inspection requirement — Sprinkler Systems
Alexandra Herrera
05/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexandra Herrera
05/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Alexandra Herrera
05/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Alexandra Herrera
05/22/2024
Filed — Alteration
PERFORM MECHANICAL WORK INCONJUNCTION WITH BUILDING HVAC SYSTEM UPGRADE. INSTALL CONDENSING UNITS ON REARYARD & ROOF. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION
M00822022-P1
05/22/2024
Filed — Alteration
PERFORM PLUMBING WORK TO CAP/REMOVE ALL EXISTING GAS PIPING TO MAIN VALVES & EXISTING GAS PLUMBING FIXTURES. INSTALL RPZ ON CELLAR LEVEL & SPRINKLER HEAD ON 1ST FLOOR. PERFORM PLUMBING FIXTURES MODIFICATION WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00821428-P1
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
05/07/2024
Special inspection requirement — Mechanical Systems
Alexandra Herrera
05/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Alexandra Herrera
05/07/2024
Special inspection requirement — Final
Alexandra Herrera
05/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Alexandra Herrera
05/07/2024
Special inspection requirement — Maintenance information
Alexandra Herrera
05/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexandra Herrera
05/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Alexandra Herrera
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
05/07/2024
Special inspection requirement — Sprinkler Systems
Alexandra Herrera
05/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/01/2024
Violation issued (HPD, closed)
A
03/13/2024
Signed off — Alteration
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION TO CREATE CELLAR RECREATION ROOM ACCESSORY TO APT#1B AS PER BB#2012-008. INSTALL CONVENIENCE STAIR FROM CELLAR TO 1ST FL-APT#1B. CREATE STAIR ACCESS TO REARYARD. INSTALL POWDER ROOM ON CELLAR.
M00821412-I1
02/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2024
Permit issued — General Construction
M00821412-I1-GC-CX
10/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
05/23/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Benjamin Ascher
05/23/2023
Special inspection requirement — Interior lighting power
Benjamin Ascher
05/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Ascher
05/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
Benjamin Ascher
05/23/2023
Special inspection requirement — Final
Benjamin Ascher
05/20/2023
Filed — Alteration
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION TO CREATE CELLAR RECREATION ROOM ACCESSORY TO APT#1B AS PER BB#2012-008. INSTALL CONVENIENCE STAIR FROM CELLAR TO 1ST FL-APT#1B. CREATE STAIR ACCESS TO REARYARD. INSTALL POWDER ROOM ON CELLAR.
M00821412-P1
05/11/2023
Permit issued — Sprinklers
M00821428-I1-PL
05/10/2023
Permit issued — Mechanical Systems
M00822022-I1-MS
05/04/2023
Permit issued — Structural
M00821412-I1-GC-CX
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2023
Violation issued (HPD, closed)
A
03/15/2023
Filed — Alteration
PERFORM PLUMBING WORK TO CAP/REMOVE ALL EXISTING GAS PIPING TO MAIN VALVES & EXISTING GAS PLUMBING FIXTURES. INSTALL RPZ ON CELLAR LEVEL & SPRINKLER HEAD ON 1ST FLOOR. PERFORM PLUMBING FIXTURES MODIFICATION WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00821428-I1
03/15/2023
Filed — Alteration
PERFORM MECHANICAL WORK INCONJUNCTION WITH BUILDING HVAC SYSTEM UPGRADE. INSTALL CONDENSING UNITS ON REARYARD & ROOF. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION
M00822022-I1
03/02/2023
Objection raised — Structural
03/02/2023
Objection resolved — Addressed
03/02/2023
Objection raised — Zoning
03/02/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Structural
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection raised — Inspections
02/16/2023
Objection resolved — Addressed
02/14/2023
Filed — Alteration
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION TO CREATE CELLAR RECREATION ROOM ACCESSORY TO APT#1B AS PER BB#2012-008. INSTALL CONVENIENCE STAIR FROM CELLAR TO 1ST FL-APT#1B. CREATE STAIR ACCESS TO REARYARD. INSTALL POWDER ROOM ON CELLAR.
M00821412-I1
11/02/2022
Violation issued (HPD, closed)
I
01/17/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTOTEM HOLDING INC01/22/2024
DOB NOWSprinklersSigned-offDPH PLUMBING & HTG CORP05/11/2023
DOB NOWMechanical SystemsPermit IssuedTOTEM HOLDING INC05/10/2023
DOB NOWStructuralSigned-offTOTEM HOLDING INC05/04/2023
BISFBISSUEDACE-ATLAS PLBG & HTG LLC02/20/2008
1 project · most recent 05/22/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/22/2024Permit IssuedTOTEM HOLDING INCHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU093SJA4 10,900 BTU · Vrf Indoor ×36
ARNU123SJA4 13,600 BTU · Vrf Indoor ×20
ARUN024GSS4 27,000 BTU · Vrf Outdoor ×20
ARNU183SKA4 21,500 BTU · Vrf Indoor ×12
ARUN038GSS4 43,000 BTU · Vrf Outdoor ×8
ARNU183M1A4 21,500 BTU · Vrf Indoor ×4
ARNU183TTD4 21,500 BTU · Vrf Indoor ×4
ARUN060GSS4 64,000 BTU · Vrf Outdoor ×4
MODEL#ARNU183SKA4 21,500 BTU · Vrf Indoor ×4
1 project · most recent 05/22/2024
FiledStatusContractorScope
05/22/2024——2 heads
1 project · most recent 05/22/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/22/2024Signed-offDPH PLUMBING & HTG CORPGas, Water/Sanitary
1 project · most recent 04/25/2025
General Wiring
FiledStatusContractorScope
04/25/2025CompleteTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
05/29/2024Maintenance informationAlexandra Herreraenergy_progress
05/29/2024Energy Code Compliance InspectionsAlexandra Herreraprogress
05/29/2024FinalAlexandra Herreraprogress
05/29/2024Mechanical SystemsAlexandra Herreraspecial
05/29/2024Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
05/29/2024Tenant Protection Plan Compliance—special
05/29/2024Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
05/29/2024Sprinkler SystemsAlexandra Herreraspecial
05/29/2024Tenant Protection Plan Compliance—special
05/29/2024HVAC-R and service water piping design and insulationAlexandra Herreraenergy_progress
05/29/2024HVAC-R and service water heating system controlsAlexandra Herreraenergy_progress
05/29/2024HVAC-R and service water heating equipmentAlexandra Herreraenergy_progress
05/07/2024Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
05/07/2024Mechanical SystemsAlexandra Herreraspecial
05/07/2024Tenant Protection Plan Compliance—special
05/07/2024Energy Code Compliance InspectionsAlexandra Herreraprogress
05/07/2024FinalAlexandra Herreraprogress
05/07/2024HVAC-R and service water heating system controlsAlexandra Herreraenergy_progress
05/07/2024Maintenance informationAlexandra Herreraenergy_progress
05/07/2024HVAC-R and service water piping design and insulationAlexandra Herreraenergy_progress
05/07/2024HVAC-R and service water heating equipmentAlexandra Herreraenergy_progress
05/07/2024Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
05/07/2024Sprinkler SystemsAlexandra Herreraspecial
05/07/2024Tenant Protection Plan Compliance—special
05/23/2023Tenant Protection Plan ComplianceWilliam Ryanspecial
Latest 25 of 42.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026M00821428-I1Request digital key ↗
08/31/2026M00821428-P1Request digital key ↗
08/31/2026M00821412-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
02/21/2008110088645Open ↗
02/20/2008110088645Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/20/2008110088645Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026M00822022-P1Open ↗
09/01/2026M00822022-P1Open ↗
09/01/2026M00822022-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M00821428-I1Open ↗
09/23/2026M00821428-I1Open ↗
09/01/2026M00822022-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026M00821428-I1Open ↗
08/31/2026M00821428-P1Open ↗
08/31/2026M00821412-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/19/2008110088645Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/19/2008110088645Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026M00821428-P1Open ↗
08/31/2026M00821428-I1Open ↗
08/27/2026M00822022-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸BISNOTIF-PROPOSED STEAM/HOT WATER INSPECTION1
02/19/2008110088645Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
02/19/2008110088645Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
08/25/2008110088645Open ↗
▸Other Documents1
▸BISUnknown1
02/19/2008110088645Open ↗