← Back
Primarily 5-6 family with 1 store or office
533 HUDSON STREET
MANHATTAN · BIN 1011756
💬 Discuss this project
1827Year Built
3.5Stories
S5Building Class
C1-6Zoning
2,609 sfGross Floor Area
6Units
Rent Stabilized25 Open Violations 23 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: NEVINS REALTY LLC · 1,324 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Roof5p · 1 filing · 11 docs
Floor 31p · 1 filing · 9 docs
Floor 2
Floor 14p · 3 filings · 20 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEVINS REALTY6307/08/2026
RELIABLE ENTERPRISES807/08/2026
BEEF & OYSTER BAR CO. INC103/22/2026
NEVINS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RICHARD AYOTTE ARCHITECTURE, PC602/03/2025
OLD STRUCTURES ENGINEERING412/14/2022
ENTHINK ENGINEERS LLC103/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DYNAMIC BUILDING CONSULTANTS2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EKA CONTRACTING LLCGeneral Contractor2107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor607/08/2026
METRO INCORPORATEDPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352402/03/2025
CROSSCHECK INSPECTION SER544612/14/2022
Building Lifecycle
All (100)Filed (11)Permit Issued (15)Signed Off (6)Violation (43)Objection (14)Special Inspection (11)
11/03/2025
Permit issued — Sidewalk Shed
M00491951-I1-SH
09/04/2025
Signed off — Alteration
Respectfully request to renovate existing cafe. New hatch @ Cellar. No change in Use, Egress, or occupancy.
M01083031-I1
04/16/2025
Permit issued — General Construction
M01083031-I1-GC
03/03/2025
Signed off — Alteration
Respectfully request to file for roof replacement. Upper portions of chimneys (Noted on drawing set) to be rebuilt. No change in use, egress, or occupancy.
M00994767-I1
02/18/2025
Objection raised — Scope
02/18/2025
Objection resolved — Addressed
02/13/2025
Signed off — Alteration
Respectfully request to install new access hatch. Architectural work filed under DOB NOW# M01083031-I1. No change in use, egress, or occupancy. Building is located within Fire District.
M01122319-I1
02/03/2025
Filed — Alteration
Respectfully request to file for roof replacement. Upper portions of chimneys (Noted on drawing set) to be rebuilt. No change in use, egress, or occupancy.
M00994767-P1
01/27/2025
Permit issued — Structural
M01122319-I1-ST
01/22/2025
Permit issued — General Construction
M01083031-I1-GC
11/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN SEMIOLI
10/10/2024
Filed — Alteration
Respectfully request to install new access hatch. Architectural work filed under DOB NOW# M01083031-I1. No change in use, egress, or occupancy. Building is located within Fire District.
M01122319-I1
10/10/2024
Objection raised — Other
10/10/2024
Objection resolved — Addressed
10/10/2024
Objection raised — Other
10/10/2024
Objection resolved — Addressed
10/04/2024
Objection resolved — Addressed
10/04/2024
Special inspection requirement — Final
RICHARD AYOTTE
10/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN SEMIOLI
09/04/2024
Permit issued — General Construction
M00994767-I1-GC
08/02/2024
Objection raised — Scope
07/26/2024
Filed — Alteration
Respectfully request to renovate existing cafe. New hatch @ Cellar. No change in Use, Egress, or occupancy.
M01083031-I1
07/18/2024
Permit issued — General Construction
M00994767-I1-GC
07/09/2024
Permit issued — Sidewalk Shed
M00491951-I1-SH
05/22/2024
Filed — Alteration
Respectfully request to file for roof replacement. Upper portions of chimneys (Noted on drawing set) to be rebuilt. No change in use, egress, or occupancy.
M00994767-I1
03/15/2023
Violation issued (HPD, closed)
A
02/14/2023
Signed off — Alteration
Respectfully request to add new joist to existing bathroom floor framing, repair of existing masonry walls from interior & removal increase the size opening in interior masonry shear wall. No change in use, egress, or occupancy. Fees paid under M00362993-
M00459430-I1
01/31/2023
Objection resolved — Addressed
12/23/2022
Objection raised — Admin
12/14/2022
Filed — Alteration
Respectfully request to add new joist to existing bathroom floor framing, repair of existing masonry walls from interior & removal increase the size opening in interior masonry shear wall. No change in use, egress, or occupancy. Fees paid under M00362993-
M00459430-P2
10/28/2022
Signed off — Alteration
Respectfully Request to Install Ventilation Fan for New ADA Bathroom
M00363034-I1
10/06/2022
Violation issued (FDNY_NOV, closed)
10/06/2022
Violation issued (FDNY_NOV, closed)
06/22/2022
Violation issued (FDNY_NOV, closed)
06/15/2022
Permit issued — Sidewalk Shed
M00491951-I1-SH
04/25/2022
Signed off — Alteration
Respectfully Request to File for The location of Plumbing Fixtures.
M00361442-I1
05/12/2021
Permit issued — General Construction
M00459430-I1-GC
05/12/2021
Permit issued — Mechanical Systems
M00363034-I1-MS
04/19/2021
Filed — Alteration
Respectfully request to add new joist to existing bathroom floor framing, repair of existing masonry walls from interior & removal increase the size opening in interior masonry shear wall. No change in use, egress, or occupancy. Fees paid under M00362993-
M00459430-P1
04/18/2021
Special inspection requirement — Masonry
EUGENE BIFULCO
04/18/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
04/18/2021
Special inspection requirement — Final
Marie Ennis
04/15/2021
Permit issued — Plumbing
M00361442-I1-PL
04/08/2021
Permit issued — General Construction
M00459430-I1-GC
04/06/2021
Permit issued — Mechanical Systems
M00363034-I1-MS
04/01/2021
Violation issued (HPD, closed)
A
03/26/2021
Permit issued — Sidewalk Shed
M00491951-I1-SH
03/25/2021
Filed — Alteration
M00491951-I1
03/03/2021
Permit issued — Plumbing
M00361442-I1-PL
02/03/2021
Objection raised — Other
02/03/2021
Objection resolved — Addressed
01/28/2021
Filed — Alteration
Respectfully request to add new joist to existing bathroom floor framing, repair of existing masonry walls from interior & removal increase the size opening in interior masonry shear wall. No change in use, egress, or occupancy. Fees paid under M00362993-
M00459430-I1
10/14/2020
Objection raised — Other
10/14/2020
Objection resolved — Addressed
10/13/2020
Filed — Alteration
Respectfully Request to Install Ventilation Fan for New ADA Bathroom
M00363034-I1
10/12/2020
Filed — Alteration
Respectfully Request to File for The location of Plumbing Fixtures.
M00361442-I1
10/12/2020
Filed — Alteration
Respectfully request to add new joist to supplement existing floor framing, repair of existing masonry walls from the interior & the removal increase the size of the opening in an interior masonry shear wall. No change in use, egress, or occupancy.
M00362993-I1
10/12/2020
Special inspection requirement — HVAC insulation and sealing
RICHARD AYOTTE
10/12/2020
Special inspection requirement — Shutoff dampers
RICHARD AYOTTE
08/17/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC11/03/2025
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC04/16/2025
DOB NOWStructuralSigned-offEKA CONTRACTING LLC01/27/2025
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC01/22/2025
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC09/04/2024
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC07/18/2024
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC07/09/2024
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC06/15/2022
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC05/12/2021
DOB NOWMechanical SystemsSigned-offEKA CONTRACTING LLC05/12/2021
DOB NOWPlumbingSigned-offMETRO INCORPORATED04/15/2021
DOB NOWGeneral ConstructionSigned-offEKA CONTRACTING LLC04/08/2021
DOB NOWMechanical SystemsSigned-offEKA CONTRACTING LLC04/06/2021
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC03/26/2021
DOB NOWPlumbingSigned-offMETRO INCORPORATED03/03/2021
BISOTISSUEDEKA CONTRACTING LLC05/26/2022
BISOTISSUEDEKA CONTRACTING LLC02/26/2021
BISPLISSUEDHUB PLUMBING&HEATING CORP07/24/2014
BISOTISSUEDMAJOR RENOVATION MGMT INC02/01/2013
BISOTISSUEDMAJOR RENOVATION MGMT INC02/01/2013
BISOTISSUEDMAJOR RENOVATION MGMT INC01/05/2012
BISOTISSUEDMAJOR RENOVATION MGMT INC01/05/2012
BISOTISSUEDMAJOR RENOVATION MGMT INC11/17/2011
BISOTISSUEDMAJOR RENOVATION MGMT INC11/14/2011
BISPLISSUEDPLUMBING & HTG DOCTOR INC12/05/2006
BISOTISSUEDNJACC,INC11/30/2006
BISFPISSUEDACTIVE FIRE EXTING. CO., INC.10/06/2005
BISOTISSUEDKEY RESTORATION CORP08/15/2005
BISEQISSUEDOUTDOOR INSTALLATION LLC08/10/2005
BISEQISSUEDOUTDOOR INSTALLATIONS LLC08/10/2005
BISFPISSUEDFIRE COMMAND CO INC10/29/1991
1 project · most recent 03/30/2021
FiledStatusContractorScope
03/30/2021Permit IssuedRICHARD NEU—
1 project · most recent 10/12/2020
Steel Masonry Wood
FiledStatusContractorScope
10/12/2020——Steel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/13/2024Structural Stability – Alterations of existing buildingsJOHN SEMIOLIspecial
10/04/2024FinalRICHARD AYOTTEprogress
10/04/2024Tenant Protection Plan ComplianceJOHN SEMIOLIspecial
04/18/2021MasonryEUGENE BIFULCOspecial
04/18/2021Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
04/18/2021FinalMarie Ennisprogress
10/12/2020HVAC insulation and sealing RICHARD AYOTTEenergy_progress
10/12/2020Shutoff dampersRICHARD AYOTTEenergy_progress
08/17/2020Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
06/25/2020FinalRICHARD AYOTTEprogress
06/25/2020Mechanical SystemsEUGENE BIFULCOspecial
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch5
09/04/2026M00491951-I1Request digital key ↗
08/26/2026M01083031-I1Request digital key ↗
08/25/2026M00994767-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00459430-P1Request digital key ↗
08/15/2026M00459430-I1Request digital key ↗
08/15/2026M00459430-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00362993-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00363034-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00361442-I1Request digital key ↗
▸Applications & Permits25
▸DOB NOWLPC Approval/Permit10
09/04/2026M00362993-I1Open ↗
09/04/2026M00459430-P1Open ↗
08/25/2026M00994767-I1Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
02/26/2021140922330Open ↗
02/12/2013120684544Open ↗
02/12/2013120684544Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/30/2021140922330Open ↗
08/18/2020140922330Open ↗
05/19/2011120684544Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY3
06/16/2016120347776Open ↗
02/09/2011120347776Open ↗
12/13/2010120347776Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
02/10/2011120347776Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/04/2026M00362993-I1Open ↗
09/04/2026M00459430-I1Open ↗
09/04/2026M00491951-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
06/16/2016120347776Open ↗
09/16/2015104237121Open ↗
05/19/2011120684544Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00361442-I1Open ↗
08/26/2026M00363034-I1Open ↗
08/23/2026M00459430-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026M00363034-I1Open ↗
08/26/2026M00363034-I1Open ↗
08/26/2026M00363034-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/18/2020140922330Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/18/2020140922330Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
08/15/2015104237121Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
08/18/2020140922330Open ↗
▸DOB NOWTenant Protection Plan1
09/04/2026M00362993-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00362993-I1Open ↗
09/04/2026M00459430-P1Open ↗
08/26/2026M01083031-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/13/2010120347776Open ↗
12/13/2010120347776Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/18/2020140922330Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00994767-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/16/2023140922330Open ↗
05/15/2023140922330Open ↗
08/18/2020140922330Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
05/16/2023140922330Open ↗
05/15/2023140922330Open ↗
06/19/2014120684544Open ↗
▸BISTR8: Energy Code Progress Inspections2
06/19/2014120684544Open ↗
06/19/2014120684544Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/19/2011120684544Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/18/2020140922330Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00363034-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/19/2023140922330Open ↗
05/19/2023140922330Open ↗
05/16/2023140922330Open ↗
Showing 3 of 8 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/18/2020140922330Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLANDMARKS APPROVAL3
09/30/2020140922330Open ↗
06/18/2014120684544Open ↗
05/19/2011120684544Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/22/2023140922330Open ↗
09/16/2015104237121Open ↗
06/18/2014120684544Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/19/2011120684544Open ↗
12/13/2010120347776Open ↗
▸BISLANDMARKS SIGNOFF1
05/22/2023140922330Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/15/2015104237121Open ↗
▸BISFINAL1
08/18/2020140922330Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/16/2023140922330Open ↗
05/15/2023140922330Open ↗
08/18/2020140922330Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
09/29/2021140922330Open ↗
09/30/2020140922330Open ↗
08/18/2020140922330Open ↗
▸BISEFILING COVER SHEET2
05/19/2011120684544Open ↗
05/19/2011120684544Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/18/2020140922330Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building3
08/25/2026M00994767-I1Open ↗
08/13/2026M01083031-I1Open ↗
08/13/2026M00994767-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/18/2014120684544Open ↗
06/18/2014120684544Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/25/2026M00994767-I1Open ↗
08/13/2026M00994767-P1Open ↗
▸BISSupporting Document: Fee Deferment1
06/16/2016120347776Open ↗