← Back
BuildNYC
Multi-story retail building (2+)
533 WEST 19TH STREET
MANHATTAN · BIN 1080293
💬 Discuss this project
1919Year Built
2Stories
K2Building Class
C6-2Zoning
13,800 sfGross Floor Area
1Units
0 Active Violations
Multi-story retail building (2+) · Owner of record: Dazw · 9,200 sf lot · 1.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDavid Zwirner Gallery184p · 4 filings · 20 docs
BulkheadDavid Zwirner Gallery6p · 1 filing · 20 docs
Floor 2David Zwirner Gallery216p · 3 filings · 20 docs
Floor 1David Zwirner Gallery220p · 5 filings · 20 docs
Site & exteriorPlywood fence installation23p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
David Zwirner5007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/01/2023$11.7M—— → —$851/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Millennium Designs of New York1003/21/2026
J.A.M. Associates3803/21/2026
Millennium Designs1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shawmut Woodworking & SupplyGeneral Contractor1407/08/2026
MC SuperstructureScaffold707/08/2026
Donato PlumbingPlumbing207/08/2026
KG SprinklerFire Protection207/08/2026
Nash Electric ServicesElectrical103/22/2026
Denali ElectricElectrical103/22/2026
Advanced PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services5441407/16/2025
Langan Engineering, Env, Surveyin1265101/30/2024
Building Lifecycle
All (135)Filed (30)Permit Issued (20)Signed Off (10)Violation (3)Inspection (11)Objection (31)Special Inspection (30)
05/05/2026
Signed off — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-S2
05/03/2026
Signed off — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-S1
12/01/2025
Signed off — Alteration
M00983314-I1
12/01/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00980146-I1
08/15/2025
Objection raised — Scope
08/11/2025
Objection resolved — Addressed
07/23/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/16/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P8
07/15/2025
Objection raised — Admin
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
07/15/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/02/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P7
07/01/2025
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Protection of exposed foundation insulation
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Vestibules
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Air barrier - visual inspection
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Sprayed fire-resistant materials
EUGENE BIFULCO
05/15/2025
Signed off — Alteration
M00994019-I1
05/15/2025
Signed off — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-S3
05/07/2025
Signed off — Alteration
M01044410-I1
04/18/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P6
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/17/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
04/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Objection resolved — Addressed
04/01/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Heating Systems
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Final
EUGENE BIFULCO
04/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Electrical motors and elevators
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
04/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Lighting controls
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Exterior lighting power
EUGENE BIFULCO
04/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
03/25/2025
Permit issued — Foundation
M00994019-I1-FO
03/25/2025
Permit issued — Structural
M00943364-S3-ST
03/20/2025
Objection raised — Energy
03/19/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P4
03/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/13/2025
Filed — No Work
M01134590-P4
03/12/2025
Filed — Alteration
M01044410-P3
03/07/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P3
03/06/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00980146-P4
03/06/2025
Permit issued — Plumbing
M00943364-S2-EW-SP
03/06/2025
Permit issued — Plumbing
M00943364-S2-PL
03/03/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offShawmut Woodworking & Supply03/25/2025
DOB NOWStructuralSigned-offShawmut Woodworking & Supply03/25/2025
DOB NOWSprinklersSigned-offH M Sprinkler03/06/2025
DOB NOWPlumbingSigned-offDonato Plumbing03/06/2025
DOB NOWMechanical SystemsSigned-offShawmut Woodworking & Supply02/21/2025
DOB NOWConstruction FenceSigned-offMC Superstructure12/19/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure12/02/2024
DOB NOWGeneral ConstructionPermit IssuedShawmut Woodworking & Supply11/12/2024
DOB NOWSupported ScaffoldSigned-offMC Superstructure07/10/2024
DOB NOWStructuralSigned-offShawmut Woodworking & Supply04/11/2024
DOB NOWSprinklersSigned-offH M Sprinkler03/26/2024
DOB NOWPlumbingSigned-offDonato Plumbing03/26/2024
DOB NOWGeneral ConstructionPermit IssuedShawmut Woodworking & Supply03/01/2024
DOB NOWMechanical SystemsSigned-offShawmut Woodworking & Supply02/27/2024
DOB NOWStructuralSigned-offShawmut Woodworking & Supply02/27/2024
DOB NOWFoundationSigned-offShawmut Woodworking & Supply02/20/2024
DOB NOWPlumbingSigned-offAdvanced Plumbing01/17/2024
DOB NOWConstruction FenceSigned-offMC Superstructure01/05/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure12/29/2023
DOB NOWGeneral ConstructionSigned-offShawmut Woodworking & Supply12/07/2023
1 project · most recent 07/16/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2025Signed-offShawmut Woodworking & SupHeating and Air Conditioning Systems
Heat / Cool
Trane TRANE DHJ240A3SBH 20 tons · Rooftop Unit ×2
TRANE YHJ090A3SBH 7 tons · Heat Pump Outdoor ×2
TRANE DHJ150A3SBH 12 tons · Rooftop Unit ×2
TRANE YHJ120A3SBH 10 tons · Heat Pump Outdoor ×2
1 project · most recent 07/16/2025
Sprinkler System
FiledStatusContractorScope
07/16/2025Signed-offKG SprinklerSprinkler System
1 project · most recent 07/16/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/16/2025Signed-offDonato PlumbingGas, Storm, Water/Sanitary
3 projects · most recent 02/28/2026
General Wiring
FiledStatusContractorScope
02/28/2026CompleteMer ElectricGeneral Wiring
06/21/2025CompleteDenali Electric—
01/08/2024CompleteNash Electric Services—
1 project · most recent 07/16/2025
Steel Concrete Masonry
FiledStatusContractorScope
07/16/2025Signed-offShawmut Woodworking & SupSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/23/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/23/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
07/23/2025Sprinkler SystemsEUGENE BIFULCOspecial
07/15/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/15/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
07/15/2025Sprinkler SystemsEUGENE BIFULCOspecial
07/01/2025Insulation placement and R valuesEUGENE BIFULCOenergy_progress
07/01/2025Fenestration areasEUGENE BIFULCOenergy_progress
07/01/2025Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
07/01/2025Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
07/01/2025Protection of exposed foundation insulationEUGENE BIFULCOenergy_progress
07/01/2025Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
07/01/2025Sprayed fire-resistant materialsEUGENE BIFULCOspecial
07/01/2025VestibulesEUGENE BIFULCOenergy_progress
07/01/2025Fenestration air leakageEUGENE BIFULCOenergy_progress
04/17/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/17/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
04/17/2025Sprinkler SystemsEUGENE BIFULCOspecial
04/01/2025Mechanical SystemsEUGENE BIFULCOspecial
04/01/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/01/2025Maintenance informationEUGENE BIFULCOenergy_progress
04/01/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/01/2025Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
04/01/2025Exterior lighting powerEUGENE BIFULCOenergy_progress
04/01/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
Latest 25 of 89.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
David Zwirner GalleryArts / Culture / EntertainmentCellar, Floors 1, 2, Roof
Project M01019957 Alteration · Filing Withdrawn · 03/20/2024
Project M00943364 Alteration CO · Permit Entire · 10/18/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 163 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch28
08/29/2026M00931245-S1Request digital key ↗
08/29/2026M00931245-I1Request digital key ↗
08/28/2026M00943364-S4Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/24/2026M01134590-P1Request digital key ↗
08/24/2026M01134590-I1Request digital key ↗
08/24/2026M01134590-P4Request digital key ↗
▸Applications & Permits6
▸DOB NOWHPD Certification Letter or CPC Special Permit4
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-P2Open ↗
08/13/2026M00943364-P7Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/13/2024141025432Open ↗
03/13/2024141025432Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00943364-I1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/29/2026M00931245-S1Open ↗
08/29/2026M00931245-I1Open ↗
08/28/2026M00983314-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/29/2026M00943364-P8Open ↗
09/19/2026M00943364-P2Open ↗
09/19/2026M00943364-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/29/2026M00943364-P8Open ↗
09/19/2026M00943364-P2Open ↗
09/19/2026M00943364-P6Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-P7Open ↗
08/13/2026M00943364-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos25
▸DOB NOWOER: Notice to Proceed11
08/13/2026M00931245-I1Open ↗
08/13/2026M00994019-I1Open ↗
08/13/2026M01023624-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026M00943364-I1Open ↗
08/13/2026M01023624-P1Open ↗
08/13/2026M00931245-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026M00943364-S3Open ↗
08/13/2026M00943364-S1Open ↗
08/13/2026M01023624-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026M00931245-I1Open ↗
08/29/2026M00931245-S1Open ↗
08/28/2026M00994019-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT2
08/13/2026M00994019-I1Open ↗
08/13/2026M00943364-S4Open ↗
▸DOB NOWConcrete Testing Exception Report2
08/13/2026M00943364-S3Open ↗
08/13/2026M00994019-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026M00943364-S4Open ↗
08/13/2026M00994019-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026M00994019-I1Open ↗
▸Other Documents20
▸DOB NOWPlot Diagram5
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026M00943364-P7Open ↗
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026M00943364-P2Open ↗
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P2Open ↗
08/13/2026M00943364-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01019957-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00943364-S3Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00943364-I1Open ↗