← Back
Predominantly retail with other uses
Dia Center for the Arts
533 WEST 22 STREET · BIN 1012326
💬 Discuss this project
1913Year Built
6Stories
K4Building Class
M1-5Zoning
41,284 sfGross Floor Area
8Units
LL97 Covered0 Open Violations
Predominantly retail with other uses · Owner of record: DIA CENTER FOR THE ARTS INC · 7,406 sf lot · 5.57 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof6p · 5 filings · 20 docs
Floor 62p · 5 filings · 20 docs
Floor 513p · 7 filings · 20 docs
Floor 4
Floor 311p · 5 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIA ART FOUNDATION8707/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.8003/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EUROSTRUCT INCGeneral Contractor2307/08/2026
HVAC SERVICES LLCGeneral Contractor1007/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor603/21/2026
PRECISION HOIST & SCAFFO*General Contractor407/08/2026
NATIONWIDE MECHANICAL INCFire Protection307/08/2026
WTC PLBG & HEATING CORPPlumbing307/08/2026
NATIONWIDE MECHANICAL INCPlumbing207/08/2026
WTC PLUMBING & HTG CORPFire Protection207/08/2026
CS BRIDGE CORPGeneral Contractor207/08/2026
AMERICAN SIGN ELECL CONScaffold107/08/2026
PRO STAR PLBG,HTG&MECH INPlumbing107/08/2026
WAWEL PLBG AND HTG CORPPlumbing107/08/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4232604/26/2023
INTEGRITY CONSULTING SERV666509/08/2022
Building Lifecycle
All (268)Filed (44)Permit Issued (40)Signed Off (28)Violation (27)Inspection (19)Objection (80)Special Inspection (30)
04/04/2024
Signed off — Alteration
ERECT (1) NON-ILLUMINATED D/S BLADE SIGN. SIGN IS ACCESSORY TO DIA:
M00994798-I1
02/22/2024
Permit issued — Sign
M00994798-I1-SG
02/20/2024
Filed — Alteration
ERECT (1) NON-ILLUMINATED D/S BLADE SIGN. SIGN IS ACCESSORY TO DIA:
M00994798-I1
01/23/2024
Special inspection requirement — Final
SALVATOR CARADONNA
01/22/2024
Signed off — Alteration
M00772489-I1
08/01/2023
Permit issued — Supported Scaffold
M00772489-I1-SF
07/25/2023
Filed — No Work
M00347514-P1
07/25/2023
Special inspection requirement — Public Assembly Emergency Lighting
06/20/2023
Signed off — Alteration
Plumbing work on the 3rd floor. Work includes removal of 4 fixtures and the installation of 6 fixtures.
M00558673-S1
05/24/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/16/2023
Signed off — Alteration
M00753788-I1
05/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/12/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/08/2023
Signed off — Alteration
Plumbing work on the 3rd floor. Work includes removal of 4 fixtures and the installation of 6 fixtures.
M00558673-I1
04/28/2023
Signed off — Alteration
Replace existing AC system on 3rd floor and roof. Remove additional mechanical equipment from roof.
M00511302-I1
04/28/2023
Signed off — Alteration
Install generator on roof.
M00371895-I1
04/27/2023
Signed off — Alteration
Fuel storage filed for belly tank of generator.
M00371922-I1
04/26/2023
Filed — Alteration
Install generator on roof.
M00371895-P2
04/26/2023
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Young Suh
04/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
04/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/26/2023
Special inspection requirement — Mechanical Systems
Young Suh
04/26/2023
Special inspection requirement — Final
Young Suh
04/05/2023
Special inspection requirement — Sprinkler Systems
Young Suh
03/28/2023
Filed — Alteration
Plumbing work on the 3rd floor. Work includes removal of 4 fixtures and the installation of 6 fixtures.
M00558673-P3
03/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2023
Signed off — Alteration
M00753758-I1
03/14/2023
Signed off — Alteration
3RD FLOORNORTH - HEREWITH FILING FOR MODIFICATION TO EXISTING HVAC SYSTEM
M00753775-I1
03/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/12/2023
Signed off — Alteration
Interior renovations of office space on 3rd floor
M00741138-I1
01/12/2023
Signed off — Alteration
New mechanical ductwork and air distribution.
M00737119-I1
01/04/2023
Signed off — Alteration
Modification of existing sprinkler system for renovation of office space on 3rd floor.
M00737175-I1
01/03/2023
Signed off — Alteration
FILING HEREWITH FOR STRUCTURAL MODIFICATIONS
M00680204-I1
12/21/2022
Signed off — Alteration
M00676626-I1
12/21/2022
Signed off — Alteration
filing herewith for modifications to an existing hvac system
M00678555-I1
12/21/2022
Permit issued — Structural
M00680204-I1-ST
12/14/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/08/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/07/2022
Permit issued — Sprinklers
M00753788-I1-EW-SP
12/06/2022
Signed off — Alteration
Plumbing work in conjunction with 5th floor renovation.
M00208311-I1
12/02/2022
Signed off — Alteration
filing herewith for sprinkler modifications as per plans filed herewith
M00678591-I1
12/01/2022
Permit issued — Mechanical Systems
M00678555-I1-MS
11/29/2022
Signed off — Alteration
New kitchen pantry and hot water heater
M00737228-I1
11/17/2022
Permit issued — Mechanical Systems
M00753775-I1-MS
11/17/2022
Permit issued — General Construction
M00753758-I1-GC
11/17/2022
Permit issued — Plumbing
M00753788-I1-PL
11/15/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/09/2022
Special inspection requirement — Sprinkler Systems
Young Suh
10/28/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/26/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/17/2022
Permit issued — Sprinklers
M00678591-I1-EW-SP
09/12/2022
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
09/08/2022
Filed — Alteration
Modification of existing sprinkler system for renovation of office space on 3rd floor.
M00737175-P2
09/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
09/08/2022
Special inspection requirement — Heating Systems
Young Suh
09/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
09/08/2022
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
Latest 60 of 268 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON02/22/2024
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP08/01/2023
DOB NOWStructuralSigned-offEUROSTRUCT INC12/21/2022
DOB NOWSprinklersSigned-offNATIONWIDE MECHANICAL INC12/07/2022
DOB NOWMechanical SystemsSigned-offHVAC SERVICES LLC12/01/2022
DOB NOWMechanical SystemsSigned-offHVAC SERVICES LLC11/17/2022
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC11/17/2022
DOB NOWPlumbingSigned-offWTC PLBG & HEATING CORP11/17/2022
DOB NOWSprinklersSigned-offNATIONWIDE MECHANICAL INC10/17/2022
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP08/26/2022
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP07/18/2022
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC06/23/2022
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC06/13/2022
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP06/10/2022
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP06/09/2022
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN06/09/2022
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC05/28/2022
DOB NOWSprinklersSigned-offWTC PLUMBING & HTG CORP11/30/2021
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC11/29/2021
DOB NOWPlumbingSigned-offWTC PLBG & HEATING CORP10/26/2021
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC09/30/2021
DOB NOWBoiler EquipmentSigned-offRANSHAW PLBG & HTG LLC09/08/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC08/09/2021
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC03/26/2021
DOB NOWSprinklersSigned-offNATIONWIDE MECHANICAL INC03/25/2021
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC03/18/2021
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC03/17/2021
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC03/01/2021
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC03/01/2021
DOB NOWMechanical SystemsSigned-offHVAC SERVICES LLC11/23/2020
DOB NOWConstruction FenceSigned-offEUROSTRUCT INC08/05/2020
DOB NOWConstruction FenceSigned-offEUROSTRUCT INC07/10/2020
DOB NOWConstruction FenceSigned-offEUROSTRUCT INC06/09/2020
DOB NOWConstruction FenceSigned-offEUROSTRUCT INC04/24/2020
DOB NOWSprinklersSigned-offWTC PLUMBING & HTG CORP12/16/2019
DOB NOWPlumbingSigned-offWTC PLBG & HEATING CORP12/16/2019
DOB NOWMechanical SystemsSigned-offHVAC SERVICES LLC12/11/2019
DOB NOWConstruction FenceSigned-offEUROSTRUCT INC10/16/2019
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*05/07/2019
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*05/06/2019
+ 50 more permits on file
8 projects · most recent 10/12/2022
General Wiring
FiledStatusContractorScope
10/12/2022CompleteALBA ELECTRIC CORPGeneral Wiring
06/09/2022CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
03/03/2022CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/26/2021CompleteALBA ELECTRIC CORPGeneral Wiring
05/18/2021CompleteBIG SHOT ELECTRIC CORP.General Wiring
03/11/2021CompleteBIG SHOT ELECTRIC CORP.General Wiring
03/11/2021CompleteBIG SHOT ELECTRIC CORP.General Wiring
05/02/2019CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
05/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/26/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/01/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/01/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
12/01/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
01/23/2024FinalSALVATOR CARADONNAprogress
07/25/2023Public Assembly Emergency Lighting—progress
04/26/2023Mechanical SystemsYoung Suhspecial
04/26/2023FinalYoung Suhprogress
04/26/2023Energy Code Compliance InspectionsYoung Suhprogress
04/26/2023Emergency and Standby Power Systems (Generator)Young Suhspecial
04/26/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
04/05/2023Sprinkler SystemsYoung Suhspecial
11/09/2022Sprinkler SystemsYoung Suhspecial
09/12/2022Sprinkler SystemsALEKSANDR LEVINspecial
09/08/2022Heating SystemsYoung Suhspecial
09/08/2022HVAC-R and service water heating equipmentYoung Suhenergy_progress
09/08/2022Shutoff dampersYoung Suhenergy_progress
09/08/2022HVAC-R and service water heating system controlsYoung Suhenergy_progress
09/08/2022Duct leakage testing, insulation and designYoung Suhenergy_progress
09/08/2022Maintenance informationYoung Suhenergy_progress
09/08/2022FinalYoung Suhprogress
09/08/2022Mechanical SystemsYoung Suhspecial
09/08/2022Chimneys and ventsYoung Suhspecial
08/03/2022Sprinkler SystemsALEKSANDR LEVINspecial
07/21/2022Sprinkler SystemsALEKSANDR LEVINspecial
06/08/2022FinalYoung Suhprogress
06/08/2022Mechanical SystemsYoung Suhspecial
06/08/2022FinalYoung Suhprogress
05/20/2022Lighting controlsALEKSANDR LEVINenergy_progress
Latest 25 of 91.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
American Academy In RomeOfficeFloor 3
Project M00737175 Alteration · LOC Issued · 06/06/2022
Project M00737228 Alteration · LOC Issued · 06/06/2022
Project M00741138 Alteration · LOC Issued · 06/02/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 543 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch22
09/03/2026M00511302-P1Request digital key ↗
09/03/2026M00558673-P3Request digital key ↗
09/03/2026M00558673-P2Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00208302-I1Request digital key ↗
09/04/2026M00371895-I1Request digital key ↗
09/04/2026M00371895-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00215474-P1Request digital key ↗
09/03/2026M00437068-I1Request digital key ↗
08/15/2026M00437068-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00208311-I1Request digital key ↗
09/05/2026M00208311-P1Request digital key ↗
09/04/2026M00434104-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/03/2026M00371922-P1Request digital key ↗
09/03/2026M00371922-I1Request digital key ↗
08/15/2026M00371922-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00469596-P1Request digital key ↗
09/03/2026M00469596-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
09/04/2026M00347514-P1Request digital key ↗
09/04/2026M00347514-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00162220-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00162236-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00196099-I1Request digital key ↗
▸Applications & Permits72
▸BISPLAN / WORK APPROVAL APPLICATION51
12/11/2024121189542Open ↗
08/01/2024121189542Open ↗
04/30/2024121189542Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION14
06/28/2024121189542Open ↗
08/17/2021121189542Open ↗
10/23/2020140925006Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit6
09/04/2026M00434090-I1Open ↗
Showing 1 of 6 on file for this type
▸BISPLACE OF ASSEMBLY (PA) SIGNOFF1
02/04/2025121189542Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
11/22/2021121189542Open ↗
▸BISFLOOD ZONE COMPLIANCE1
12/12/2022123528548Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
10/14/2020140925006Open ↗
▸Seals & Professional Certifications132
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/05/2026M00215474-P1Open ↗
09/05/2026M00215474-I1Open ↗
09/05/2026M00208311-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
09/01/2026M00680204-I1Open ↗
09/01/2026M00678555-I1Open ↗
09/01/2026M00678555-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/23/2026M00371922-I1Open ↗
09/01/2026M00680204-I1Open ↗
09/01/2026M00437068-P1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
01/03/2020121189542Open ↗
01/03/2020121189542Open ↗
01/03/2020121189542Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
07/31/2020140925006Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/31/2020140925006Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment45
▸BISSCHEDULE B - PLUMBING20
04/23/2024121189542Open ↗
04/15/2024121189542Open ↗
04/11/2024121189542Open ↗
Showing 3 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS19
11/23/2021121189542Open ↗
11/18/2021121189542Open ↗
11/18/2021121189542Open ↗
Showing 3 of 19 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/23/2021121189542Open ↗
11/18/2021121189542Open ↗
11/02/2021121189542Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/03/2020104704483Open ↗
01/07/2020104704483Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/26/2021123528548Open ↗
▸Safety & Tenant Protection52
▸DOB NOWHPD-1: Anti-Harassment Area Checklist41
09/05/2026M00215474-P1Open ↗
09/05/2026M00208311-I1Open ↗
09/05/2026M00208311-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWCertificate of No Harassment6
09/04/2026M00434090-I1Open ↗
08/13/2026M00511302-P1Open ↗
Showing 2 of 6 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISANTI-HARASSMENT AREA CHECKLIST1
10/14/2020140925006Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
09/05/2026M00215474-P1Open ↗
09/05/2026M00208311-I1Open ↗
09/05/2026M00208311-P1Open ↗
Showing 3 of 34 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/04/2019121189542Open ↗
09/19/2019140862886Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
10/21/2020140925006Open ↗
Showing 1 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
10/14/2020140925006Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/04/2026M00371895-I1Open ↗
Showing 1 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
10/22/2021121189542Open ↗
10/21/2020140925006Open ↗
10/19/2020140925006Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/04/2026M00434090-I1Open ↗
09/02/2026M00741138-I1Open ↗
Showing 2 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/08/2021140862886Open ↗
03/08/2021140862886Open ↗
03/08/2021140925006Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/03/2020121189542Open ↗
10/03/2019140862886Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/31/2020140925006Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/23/2021121189542Open ↗
▸Inspections & Test Reports38
▸BISTECHNICAL REPORT: RESPONSIBILITY30
02/12/2024102882418Open ↗
11/02/2021121189542Open ↗
10/22/2021121189542Open ↗
Showing 3 of 30 on file for this type
▸BISTR1 IDENTIFYING RDP ASSUMING RESPONSIBILITY FOR FINAL INSPECTION.2
03/08/2021140862886Open ↗
03/05/2021140862886Open ↗
▸BISTR1 CERTIFYING COMPLETION OF FINAL INSPECTION(3C)2
03/08/2021140862886Open ↗
03/05/2021140862886Open ↗
▸BISTR1 ACKNOWLEDGING RDP WILL BE RESPONSIBLE FOR FINAL INSPECTION(3A)2
03/08/2021140862886Open ↗
03/05/2021140862886Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
01/26/2021140826854Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE11
10/05/2021121189542Open ↗
09/14/2021121189542Open ↗
08/12/2021121189542Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
02/13/2024102882418Open ↗
12/13/2022123528548Open ↗
03/09/2021140826854Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/14/2020140925006Open ↗
12/19/2019121189542Open ↗
11/21/2019121189542Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT13
03/09/2021140826854Open ↗
03/08/2021140862886Open ↗
03/08/2021140925006Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/09/2023121189542Open ↗
12/13/2022123528548Open ↗
▸Filing & Intake Forms44
▸BISADDITIONAL INFORMATION28
08/16/2024121189542Open ↗
05/02/2024121189542Open ↗
08/10/2021121189542Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM7
06/28/2024121189542Open ↗
08/17/2021121189542Open ↗
09/16/2020140925006Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
10/14/2020140925006Open ↗
09/16/2020140925006Open ↗
Showing 2 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/31/2020140925006Open ↗
Showing 1 of 3 on file for this type
▸Other Documents7
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
08/13/2026M00162220-I1Open ↗
08/13/2026M00162236-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
08/13/2026M00162220-I1Open ↗
08/13/2026M00162236-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTCO - Supporting Documents1
06/06/2021121189542Open ↗
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type