| Owner | Filings | Most Recent |
|---|---|---|
| 534 WEST 28TH STREET | 23 | 08/29/2026 |
| KENTAL | 3 | 07/08/2026 |
| WESTSIDE REALTY OF NEW YO | 1 | 03/22/2026 |
| KAZUIN REALTY CORP | 1 | 03/22/2026 |
| KAZVIN REALTY | 11 | 03/21/2026 |
| KAVVIN REALTY | 2 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 06/06/2023 | $24.5M | — | CLINTON PB 27 LLC → 534 WEST 28TH STREET LLC | $788/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| ARCHITECTURE WORKSHOP PC | 3 | 07/06/2026 |
| SIMON JIANG | 2 | 05/19/2026 |
| ALWAYS FAST SERVICES CORP | 1 | 03/24/2026 |
| BGM ENGINEERING | 1 | 05/02/2025 |
| NEW YORK ENGINEERS LLC | 4 | 04/11/2025 |
| MADSEN CONSULTING ENGINEERING, PLLC | 2 | 02/28/2025 |
| AZSK ARCHITECTS PC | 1 | 08/03/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| MMSR CONSULTING GROUP LLC | 20 | 03/21/2026 |
| BSGNY | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| KENTAL LLC | General Contractor | 1 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 1 | 07/08/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PLATINUM SERVICES NY LLC | 04/21/2026 |
| DOB NOW | General Construction | Signed-off | KENTAL LLC | 08/22/2023 |
| BIS | PL | ISSUED | PLUMBING & HTG DOCTOR INC | 01/24/2014 |
| BIS | OT | ISSUED | TREVO DRYWALL & CONTRACTI | 01/21/2014 |
| BIS | MH | ISSUED | GINA DAYA | 02/15/2011 |
| BIS | FP | ISSUED | RELIABLE FIRE PROT. INC | 04/02/2009 |
| BIS | OT | ISSUED | DNP BUILDERS LLC | 01/22/2009 |
| BIS | OT | ISSUED | GO WEST ENTERTAINMENT | 01/26/2007 |
| BIS | — | ISSUED | MONTANA ELECTRICAL DECORATING | 01/18/2007 |
| BIS | OT | ISSUED | MONTANA ELECTRICAL DECORATING | 09/29/2006 |
| BIS | — | ISSUED | EAGLE GLASS CONSTRUCTION | 02/27/2006 |
| BIS | EQ | ISSUED | EAGLE GLASS CONSTRUCTION | 02/27/2006 |
| BIS | PL | ISSUED | PACE PLUMBING CORP | 02/13/2004 |
| BIS | EQ | ISSUED | GO WEST ENTERTAINMENT INC | 01/22/2004 |
| BIS | — | ISSUED | GO WEST ENTERAN. INC | 01/22/2004 |
| BIS | FP | ISSUED | RELIABLE FIRE PROT. | 01/16/2004 |
| BIS | SP | ISSUED | PACE PLUMBING CORP | 01/07/2004 |
| BIS | PL | ISSUED | PACE PLBG CORP | 09/15/2003 |
| BIS | EQ | ISSUED | SPRING SCAFFOLDING | 09/04/2003 |
| BIS | SP | ISSUED | NATIONWIDE MECHANICAL INC | 07/24/2003 |
| BIS | EQ | ISSUED | GO WEST ENTERTAINMENT INC | 07/16/2003 |
| BIS | — | ISSUED | GO WEST ENTERAN. INC | 07/02/2003 |
| BIS | EQ | ISSUED | JKT CONSTRUCTION INC | 03/31/2003 |
| BIS | SP | ISSUED | I.M.P. PLBG & HTG CORP | 11/22/2002 |
| BIS | PL | ISSUED | I.M.P. PLBG. & HTG. CORP | 11/14/2002 |
| BIS | EQ | RE-ISSUED | JKT CONSTRUCTION INC | 09/30/2002 |
| BIS | — | RE-ISSUED | JKT CONSTRUCTION INC | 09/30/2002 |
| BIS | — | ISSUED | BERGER SIGN FABRACATION INC | 06/01/1998 |
| BIS | — | ISSUED | BERGER SIGN FABRACATION INC | 06/01/1998 |
| BIS | PL | ISSUED | MAILLAND PLUMBING & HEATING,INC. | 06/06/1997 |
| BIS | SP | ISSUED | L&C CONTRACTING INC | 05/15/1997 |
| BIS | — | ISSUED | ASSNCO REALTY CORP | 05/02/1997 |
| BIS | — | ISSUED | ASSNCO REALTY CORP | 04/01/1997 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/06/2026 | — | — | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM36NAM2 42,000 BTU · Heat Pump Outdoor ×48 PEAD-A30AA9 883 CFM · Vrf Indoor ×38 MXZ-SM72TAM-U1 84,000 BTU · Heat Pump Outdoor ×14 PEAD-A24AA9, PEAD-A30AA9 742 CFM · Fan Coil Indoor ×14 PEAD-A24AA9,PEAD-A30AA9 742 CFM · Fan Coil Indoor ×14 PYFY-P30NAMU-E1 875 CFM · Vrf Indoor ×6 PEFY-P48NMHU-E2 1,412 CFM · Vrf Indoor ×4 PEPY-P48NMHU-E2 13 tons · Vrf Indoor ×3 PUHY-P72TNU-A 80,000 BTU · Vrf Outdoor ×3 M5Y-G509NA 381 CFM · Fan Coil Indoor ×2 PEAD-A24AA9 24,000 BTU · Vrf Indoor ×2 MITISUBISHI- PUNY-P144TNU-A 13 tons · Vrf Outdoor ×1 Heating Bosch ×3 Ventilation Greenheck USF-15-87 1,500 CFM · Exhaust Fan ×60 AX-31-25-0425-VG 50 CFM · Exhaust Fan ×5 (2)AX-80-275-0620-A200, (2)AX-113-533-0809-A300 20,500 CFM · Exhaust Fan ×4 QEI-20 6,000 CFM · Makeup Air ×4 CSP-A390-VG 100 CFM · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | — | — | Sprinkler System |
| 04/11/2025 | — | — | 2 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | — | — | Concrete, Masonry |
| 05/02/2025 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | — | — | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/11/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 01/15/2026 | Structural Stability – Alterations of existing Buildings | — | special |
| 05/08/2025 | Prestressed Rock and Soil Anchors | — | special |
| 03/27/2025 | Duct leakage testing, insulation and design | — | energy_progress |
| 03/21/2025 | Lighting in dwelling units | — | energy_progress |
| 03/21/2025 | Vestibules | — | energy_progress |
| 03/21/2025 | Exterior lighting power | — | energy_progress |
| 03/21/2025 | Interior lighting power | — | energy_progress |
| 03/21/2025 | Air barrier — testing | — | energy_progress |
| 03/21/2025 | Protection of exposed foundation insulation | — | energy_progress |
| 03/21/2025 | Electrical motors and elevators | — | energy_progress |
| 03/21/2025 | Metering | — | energy_progress |
| 03/21/2025 | Lighting controls | — | energy_progress |
| 03/21/2025 | Air barrier continuity plan testing | — | energy_progress |
| 03/05/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/05/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/05/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/05/2025 | Maintenance information | — | energy_progress |
| 02/24/2025 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 02/24/2025 | Subsurface Investigations (Borings/Test Pits) | JONATHAN BILOW | special |
| 02/24/2025 | Deep Foundation Elements | — | special |
| 02/24/2025 | Concrete - Cast-In-Place | — | special |
| 02/24/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 02/24/2025 | Subgrade Inspections | — | special |
| 02/24/2025 | Post-installed Anchors | — | special |
| 02/06/2025 | Final | — | progress |