← Back
Two family brick
534 85 STREET
BROOKLYN · BIN 3153203
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R4-1Zoning
2,514 sfGross Floor Area
2Units
Two family brick · 2,575 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 22p · 1 filing · 10 docs
Floor 1
Cellar1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP210/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371210/19/2022
Building Lifecycle
All (12)Filed (2)Permit Issued (1)Signed Off (1)Inspection (4)Special Inspection (4)
07/27/2023
Signed off — Alteration
INSTALL 1 NEW COMB BOILER, REPLACE 1 EXISTING BOILER AND EXISTING GAS PIPING IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B08014402-I1
11/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/24/2022
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/19/2022
Filed — Alteration
INSTALL 1 NEW COMB BOILER, REPLACE 1 EXISTING BOILER AND EXISTING GAS PIPING IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B08014402-P1
10/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/07/2022
Permit issued — Plumbing
B08014402-I1-PL
10/03/2022
Filed — Alteration
INSTALL 1 NEW COMB BOILER, REPLACE 1 EXISTING BOILER AND EXISTING GAS PIPING IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B08014402-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/07/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/24/2022Fire-Resistant Penetrations and JointsEric Sunspecial
10/24/2022Energy Code Compliance InspectionsEric Sunprogress
10/19/2022Fire-Resistant Penetrations and JointsEric Sunspecial
10/19/2022Energy Code Compliance InspectionsEric Sunprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B08014402-I1Request digital key ↗
08/28/2026B08014402-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026B08014402-I1Open ↗
08/28/2026B08014402-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026B08014402-P1Open ↗
08/26/2026B08014402-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B08014402-P1Open ↗
08/26/2026B08014402-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B08014402-I1Open ↗
08/28/2026B08014402-P1Open ↗