← Back
City residence, one family
534 EAST 87 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1051275
💬 Discuss this project
1899Year Built
3Stories
A4Building Class
R8BZoning
3,232 sfGross Floor Area
1Units
2 Open Violations ▸
City residence, one family · 1,116 sf lot · 2.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 7 docs
Floor 3Under Construction38p · 3 filings · 20 docs
Floor 2Under Construction36p · 3 filings · 20 docs
Floor 1Under Construction37p · 3 filings · 20 docs
CellarUnder Construction40p · 4 filings · 20 docs
Sub-BasementUnder Construction36p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICANA CONSTRUCTION GR103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/15/2025$3.3M—Private party → Private party$1,021/sf building
08/31/2022$4.0M—Private party → Private party$1,222/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICANA CONSTRUCTION GRGeneral Contractor304/09/2026
ABCAT ASSOCIATES INCGeneral Contractor104/09/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing108/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YORKOS ENGINEERING, DESIG6991206/03/2026
WORLD DESIGN ARCHITECTURE9323403/31/2026
Building Lifecycle
All (85)Filed (9)Permit Issued (6)Violation (5)Inspection (3)Objection (32)Special Inspection (30)
09/01/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/04/2026
Permit issued — Plumbing
M08053108-S2-PL
06/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
William Alicea
06/17/2026
Special inspection requirement — Structural Steel - Details
William Alicea
06/17/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
06/17/2026
Special inspection requirement — Structural Steel - Welding
William Alicea
06/17/2026
Special inspection requirement — Structural Cold-Formed Steel
William Alicea
06/17/2026
Special inspection requirement — Final
William Alicea
06/17/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
William Alicea
06/17/2026
Special inspection requirement — Masonry
William Alicea
06/17/2026
Special inspection requirement — Post-installed Anchors
William Alicea
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
William Alicea
06/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
06/17/2026
Special inspection requirement — Footing and Foundation
William Alicea
06/03/2026
Filed — Alteration
RENOVATE EXISTING 1-FAMILY RESIDENCE WITH NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK. INTERIOR ALTERATIONS. WINDOW REPLACEMENT. NEW REAR FACADE OPENING FOR ENLARGED WINDOWS AND DOORS.
M08053108-S1
06/03/2026
Filed — Alteration
RENOVATE EXISTING 1-FAMILY RESIDENCE WITH NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK. INTERIOR ALTERATIONS. WINDOW REPLACEMENT. NEW REAR FACADE OPENING FOR ENLARGED WINDOWS AND DOORS.
M08053108-S2
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
BALTU YORKOS
05/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
BALTU YORKOS
05/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BALTU YORKOS
05/21/2026
Special inspection requirement — Maintenance information
BALTU YORKOS
05/13/2026
Violation issued (ECB, closed)
Construction
05/13/2026
Violation issued (ECB, closed)
Construction
05/13/2026
Violation issued (ECB, open)
Construction
05/13/2026
Violation issued (ECB, open)
Unknown
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Final
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Fenestration air leakage
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Exterior lighting power
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Lighting in dwelling units
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Fenestration areas
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Insulation placement and R values
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM ALICEA
04/13/2026
Special inspection requirement — Air barrier - visual inspection
WILLIAM ALICEA
03/31/2026
Filed — Alteration
RENOVATE EXISTING 1-FAMILY RESIDENCE WITH NO CHANGE TO USE, EGRESS, OCCUPANCY, OR BULK. INTERIOR ALTERATIONS. WINDOW REPLACEMENT. NEW REAR FACADE OPENING FOR ENLARGED WINDOWS AND DOORS.
M08053108-P1
03/31/2026
Objection raised — Other
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ALICEA
03/23/2026
Special inspection requirement — Insulation placement and R values
WILLIAM ALICEA
02/09/2026
Objection raised — Other
02/09/2026
Objection raised — Zoning
02/09/2026
Objection raised — Cost
01/20/2026
Filed — Alteration
STRUCTURAL AND FOUNDATION WORK FILED IN CONJUNCTION WITH ARCH. DESIGNS. PROPOSED BENCHING SYSTEM AT CELLAR, OPENING IN REAR FACADE, FLOOR FRAMING REINFORCEMENT. NEW REAR STEEL DECK, DUNNAGE ON ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M08053971-P1
01/15/2026
Filed — Alteration
INTERIOR DEMOLITION WORK IN AN EXISTING ONE-FAMILY RESIDENCE, IN PREPARATION FOR NEW RENOVATION. REMOVE INTERIOR PARTITIONS, FINISHES, AND CABINETRY. REMOVE INTERIOR STAIR FROM CELLAR TO 1st FLOOR.
M08036324-P1
01/06/2026
Violation issued (ECB, closed)
Construction
11/06/2025
Permit issued — Foundation
M08053971-I1-GC-CX
11/05/2025
Permit issued — General Construction
M08053108-I1-GC
10/31/2025
Permit issued — General Construction
M08036324-I1-GC
04/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/31/2023
Objection resolved — Addressed
03/31/2023
Objection resolved — Addressed
03/28/2023
Objection resolved — Addressed
03/15/2023
Filed — Alteration
STRUCTURAL AND FOUNDATION WORK FILED IN CONJUNCTION WITH ARCH. DESIGNS. PROPOSED BENCHING SYSTEM AT CELLAR, OPENING IN REAR FACADE, FLOOR FRAMING REINFORCEMENT. NEW REAR STEEL DECK, DUNNAGE ON ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M08053971-I1
03/15/2023
Objection raised — Admin
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPIPE SOLUTIONS ADVIS INC08/04/2026
DOB NOWFoundationPermit IssuedAMERICANA CONSTRUCTION GR11/06/2025
DOB NOWGeneral ConstructionPermit IssuedAMERICANA CONSTRUCTION GR11/05/2025
DOB NOWGeneral ConstructionPermit IssuedAMERICANA CONSTRUCTION GR10/31/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP02/15/2023
DOB NOWGeneral ConstructionPermit IssuedABCAT ASSOCIATES INC02/06/2023
1 project · most recent 06/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2026Permit IssuedAMERICANA CONSTRUCTION GRHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ2-U1 48,000 BTU · Vrf Outdoor ×2
MXZ-SM42NAMHZ2-U1 42,000 BTU · Vrf Outdoor ×1
MXZ-SM48NAMHZ-U1 48,000 BTU · Vrf Outdoor ×1
1 project · most recent 06/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/03/2026Permit IssuedPIPE SOLUTIONS ADVIS INCGas, Water/Sanitary
1 project · most recent 08/05/2026
General Wiring
FiledStatusContractorScope
08/05/2026Permit IssuedCONTROL SPEC ELECL SYSTEMGeneral Wiring
1 project · most recent 01/20/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
01/20/2026Permit IssuedAMERICANA CONSTRUCTION GRSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/01/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
06/17/2026Structural Steel - High Strength BoltingWilliam Aliceaspecial
06/17/2026Structural Steel - DetailsWilliam Aliceaspecial
06/17/2026Construction Utilizing CLT or SCL, Type IV—special
06/17/2026Structural Steel - WeldingWilliam Aliceaspecial
06/17/2026Structural Cold-Formed SteelWilliam Aliceaspecial
06/17/2026FinalWilliam Aliceaprogress
06/17/2026Construction Operations Influencing Adjacent StructuresWilliam Aliceaspecial
06/17/2026MasonryWilliam Aliceaspecial
06/17/2026Post-installed AnchorsWilliam Aliceaspecial
06/17/2026Concrete - Cast-In-PlaceWilliam Aliceaspecial
06/17/2026Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
06/17/2026Footing and FoundationWilliam Aliceaprogress
05/21/2026Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
05/21/2026Energy Code Compliance InspectionsBALTU YORKOSprogress
05/21/2026HVAC-R and service water heating system controlsBALTU YORKOSenergy_progress
05/21/2026HVAC-R and service water piping design and insulationBALTU YORKOSenergy_progress
05/21/2026Maintenance informationBALTU YORKOSenergy_progress
04/13/2026Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
04/13/2026Energy Code Compliance InspectionsWILLIAM ALICEAprogress
04/13/2026Fire-Resistance Rated ConstructionWILLIAM ALICEAprogress
04/13/2026FinalWILLIAM ALICEAprogress
04/13/2026Fenestration air leakageWILLIAM ALICEAenergy_progress
04/13/2026Exterior lighting powerWILLIAM ALICEAenergy_progress
04/13/2026Lighting in dwelling unitsWILLIAM ALICEAenergy_progress
04/13/2026Fenestration areasWILLIAM ALICEAenergy_progress
Latest 25 of 40.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026M08036339-I1Request digital key ↗
08/19/2026M08036324-P1Request digital key ↗
08/19/2026M08036324-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M08036339-I1Open ↗
08/19/2026M08036324-I1Open ↗
08/19/2026M08036324-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/06/2026M08036324-I1Open ↗
08/30/2026M08053971-I1Open ↗
08/27/2026M08053108-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026M08053971-I1Open ↗
08/27/2026M08053108-P1Open ↗
08/23/2026M08053108-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/16/2026M08053108-S2Open ↗
08/16/2026M08053108-S1Open ↗
08/15/2026M08053971-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026M08036339-I1Open ↗
08/19/2026M08036324-I1Open ↗
08/19/2026M08036324-P1Open ↗