Two family frame · Owner of record: ELENA FLOCOS C/O 1922 78TH ST, APT2A, BK, NY 11214 · 4,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneralOther
Floor 213p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Basement22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MP REALTY HOLDING4007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC1303/22/2023
DESIGN BUILD SI, INC.101/19/2022
THINK DESIGN ARCHITECTURE106/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP803/21/2026
A+ EXPEDITING INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MP REALTY HOLDING CORPGeneral Contractor507/08/2026
A. J. CARUSO ELECTRICAL IElectrical203/22/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738703/22/2023
SRA PLANNING & EXPEDITING5677403/16/2023
Building Lifecycle
All (37)Filed (15)Permit Issued (5)Signed Off (3)Inspection (14)
07/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/02/2023
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-S1
04/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2023
Signed off — Alteration
Install 10' wide curb cut
S00525838-I1
03/23/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/22/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P9
03/17/2023
Filed — Alteration
Install 10' wide curb cut
S00525838-P1
03/16/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P8
03/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P7
03/08/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/08/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2023
Signed off — Alteration
S00525743-I1
01/17/2023
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P6
11/19/2022
Permit issued — Curb Cut
S00525838-I1-CC
11/01/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P4
10/28/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/26/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/18/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P5
07/14/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P3
07/12/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/24/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/13/2022
Permit issued — Plumbing
S36172901-S1-PL
06/06/2022
Permit issued — Plumbing
S00513320-S1-PL
03/23/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P2
03/21/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-P1
01/19/2022
Filed — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM. NB APPLICATION #S00513320
S00609123-I1
11/04/2021
Permit issued — Foundation
S00513320-I1-GC-CX
10/28/2021
Permit issued — Construction Fence
S00525743-I1-FN
09/10/2021
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-S1
06/07/2021
Filed — Alteration
Install 10' wide curb cut
S00525838-I1
06/07/2021
Filed — Alteration
S00525743-I1
05/19/2021
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB, INCLUDEING DETACHED GARAGE ON LOT.
S00513320-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMP REALTY HOLDING CORP11/19/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/13/2022
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC06/06/2022
DOB NOWFoundationPermit IssuedMP REALTY HOLDING CORP11/04/2021
DOB NOWConstruction FenceSigned-offMP REALTY HOLDING CORP10/28/2021
2 projects · most recent 03/22/2023
Plumbing-Sprinkler Water/Sanitary Gas Storm
FiledStatusContractorScope
03/22/2023Signed-offK.M.D MECHANICAL 1443 LLCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
01/19/2022——Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 08/20/2022
General Wiring
FiledStatusContractorScope
08/20/2022CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 03/22/2023
FiledStatusContractorScope
03/22/2023Signed-offK.M.D MECHANICAL 1443 LLC2 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/23/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
03/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/08/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/08/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/24/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
03/23/2023Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
03/23/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
03/23/2023Mechanical SystemsWILLIAM MONTAGUEspecial
03/23/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
03/23/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/23/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
03/23/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
03/23/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
03/23/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
03/23/2023FinalWILLIAM MONTAGUEprogress
03/23/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
03/23/2023Footing and FoundationWILLIAM MONTAGUEprogress
03/23/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
03/23/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
03/23/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
03/23/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
03/23/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
03/23/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
03/23/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
03/23/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
03/23/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
03/23/2023FireplacesWILLIAM MONTAGUEenergy_progress
03/23/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
03/23/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
03/23/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
Latest 25 of 61.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026S00525743-I1Request digital key ↗
08/24/2026S00609123-I1Request digital key ↗
08/24/2026S00513320-P4Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits10
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
02/11/2021520450208Open ↗
02/11/2021520450208Open ↗
02/04/2021520373042Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
09/21/2022520373042Open ↗
02/20/2019520373042Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/05/2022520373042Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026S00513320-P1Open ↗
08/13/2026S00513320-P4Open ↗
08/13/2026S00513320-P8Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
02/11/2021520450208Open ↗
02/04/2021520373042Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00513320-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00513320-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026S00525743-I1Open ↗
08/24/2026S00513320-P4Open ↗
08/24/2026S00513320-P5Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00513320-S1Open ↗
08/27/2026S00513320-P4Open ↗
08/27/2026S00513320-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026S00513320-P4Open ↗
08/27/2026S00513320-P4Open ↗
08/24/2026S00513320-I1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00513320-P8Open ↗
08/13/2026S00513320-I1Open ↗
08/13/2026S00513320-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/13/2026S00513320-I1Open ↗
08/13/2026S00513320-P1Open ↗
08/13/2026S00513320-P8Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
02/22/2019520373042Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00513320-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00513320-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00513320-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00513320-I1Open ↗
▸Inspections & Test Reports14
▸DOB NOWSOIL REPORT11
08/13/2026S00513320-P6Open ↗
08/13/2026S00513320-S1Open ↗
08/13/2026S00513320-P1Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/05/2022520373042Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00513320-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00513320-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/05/2022520373042Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
02/04/2021520373042Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
04/16/2020520450208Open ↗
02/20/2019520373042Open ↗
▸BISBOROUGH INTAKE FORM1
04/16/2020520450208Open ↗
▸BISADDITIONAL INFORMATION1
02/11/2021520450208Open ↗
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
10/05/2022520373042Open ↗
10/05/2022520373042Open ↗
10/05/2022520373042Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM4
02/11/2021520450208Open ↗
04/23/2020520450208Open ↗
04/23/2020520450208Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00513320-P4Open ↗
08/13/2026S00513320-P8Open ↗
08/13/2026S00513320-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00513320-P4Open ↗
08/13/2026S00513320-P8Open ↗
08/13/2026S00513320-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
03/07/2019520373042Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/04/2021520373042Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/11/2021520450208Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
02/04/2021520373042Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
02/17/2021520373042Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
02/17/2021520373042Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00513320-I1Open ↗