← Back
General warehouse
535 ATKINS AVENUE
BROOKLYN · BIN 3099004
💬 Discuss this project
1962Year Built
1Stories
E1Building Class
M1-1Zoning
46,000 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: 553-575 COZINE AVENUE LLC · 41,000 sf lot · 1.12 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 20 docs
Floor 11p · 1 filing · 3 docs
Mezzanine3p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J P WANK INDUSTRIAL REAL ESTATE2007/31/2026
553-575 COZINE AVENUE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP207/09/2026
M JUST ARCHITECTURE PC505/07/2026
ASHRAF CORP106/18/2025
KEMS ENGINEERING AND CONSTRUCTION204/28/2023
ROYAL ENGINEERING, P.C210/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE403/21/2026
LEWSAN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor808/07/2026
SERVE-WELL P&H INCPlumbing607/08/2026
SAAJAN GENERAL CONST INCGeneral Contractor207/31/2026
RICHARD NEUElectrical103/22/2026
ROOPCHAND SINGHElectrical103/21/2026
SVE WELL PLUMBING & HEATGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899205/07/2026
HANSEN ENGINEERING PC8174105/06/2024
Building Lifecycle
All (89)Filed (12)Permit Issued (9)Signed Off (5)Violation (6)Inspection (3)Objection (46)Special Inspection (8)
08/06/2026
Permit issued — Sidewalk Shed
B01375990-I1-SH
07/30/2026
Permit issued — General Construction
B01352573-I1-GC-CX
07/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01375990-P1
06/15/2026
Special inspection requirement — Masonry
ARIEL GOLSHAN
06/15/2026
Special inspection requirement — Final
ARIEL GOLSHAN
06/10/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/08/2026
Objection raised — Mechanical
05/08/2026
Objection raised — Cost
05/07/2026
Filed — Alteration
General Construction and Structural work to replace parapet at roof at existing commercial building indicated on drawings filed herewith no change in use egress or occupancy under this application
B01352573-P1
05/05/2026
Special inspection requirement — Masonry
ARIEL GOLSHAN
05/05/2026
Special inspection requirement — Final
ARIEL GOLSHAN
03/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01375990-I1
03/27/2026
Permit issued — Sidewalk Shed
B01375990-I1-SH
03/27/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Cost
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
02/12/2026
Objection raised — Other
02/12/2026
Objection raised — Other
02/10/2026
Objection raised — Structural
02/10/2026
Objection raised — Structural
02/10/2026
Objection raised — Other
02/03/2026
Filed — Alteration
General Construction and Structural work to replace parapet at roof at existing commercial building indicated on drawings filed herewith no change in use egress or occupancy under this application
B01352573-I1
08/26/2025
Violation issued (FDNY_ORDER, closed)
08/14/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01242302-I1
07/30/2025
Signed off — Alteration
Remove existing window and infill with 2-hr rated non-load bearing masonry infill at 1st floor mezzanine indicated on drawings filed herewith. No Change in Use Egress or Occupancy under this application.
B00945785-I1
06/23/2025
Permit issued — Sidewalk Shed
B01242302-I1-SH
06/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01242302-I1
04/16/2025
Permit issued — Structural
B00945785-I1-ST
03/13/2025
Violation issued (FDNY_NOV, closed)
10/11/2024
Special inspection requirement — Final
Ryan Hansen
10/10/2024
Objection resolved — Addressed
10/08/2024
Objection resolved — Addressed
10/08/2024
Objection resolved — Addressed
10/04/2024
Objection raised — Structural
10/02/2024
Objection resolved — Addressed
10/02/2024
Objection resolved — Addressed
10/02/2024
Objection resolved — Addressed
09/05/2024
Objection raised — Scope
09/05/2024
Objection raised — Structural
09/05/2024
Objection raised — Fire_Protection
09/05/2024
Objection raised — Structural
08/23/2024
Objection raised — Inspections
08/20/2024
Filed — Alteration
Remove existing window and infill with 2-hr rated non-load bearing masonry infill at 1st floor mezzanine indicated on drawings filed herewith. No Change in Use Egress or Occupancy under this application.
B00945785-P2
05/09/2024
Objection resolved — Addressed
05/09/2024
Objection resolved — Addressed
05/08/2024
Objection raised — Cost
05/08/2024
Objection raised — Scope
05/06/2024
Filed — Alteration
Remove existing window and infill with 2-hr rated non-load bearing masonry infill at 1st floor mezzanine indicated on drawings filed herewith. No Change in Use Egress or Occupancy under this application.
B00945785-P1
05/02/2024
Special inspection requirement — Final
Ryan Hansen
05/02/2024
Special inspection requirement — Structural Steel - Details
Ryan Hansen
05/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ryan Hansen
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC08/06/2026
DOB NOWGeneral ConstructionPermit IssuedSAAJAN GENERAL CONST INC07/30/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC03/27/2026
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/23/2025
DOB NOWStructuralSigned-offSAAJAN GENERAL CONST INC04/16/2025
DOB NOWGeneral ConstructionSigned-offSVE WELL PLUMBING & HEAT05/08/2023
DOB NOWPlumbingSigned-offSERVE-WELL P&H INC04/28/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/04/2019
DOB NOWConstruction FencePermit IssuedPHOENIX SUTTON STR INC09/13/2019
BISOTISSUEDS&R CONSTRUCTION SVC INC08/29/2019
3 projects · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026Permit IssuedRICHARD NEU—
01/13/2026CompleteANDEO ELECTRICAL LLC—
10/04/2019CompleteRICHARD NEU—
1 project · most recent 05/07/2026
Masonry
FiledStatusContractorScope
05/07/2026Permit IssuedSAAJAN GENERAL CONST INCMasonry
1 project · most recent 07/09/2026
Sidewalk Shed
FiledStatusContractorScope
07/09/2026Permit IssuedPHOENIX SUTTON STR INCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/15/2026MasonryARIEL GOLSHANspecial
06/15/2026FinalARIEL GOLSHANprogress
05/05/2026MasonryARIEL GOLSHANspecial
05/05/2026FinalARIEL GOLSHANprogress
10/11/2024FinalRyan Hansenprogress
05/02/2024FinalRyan Hansenprogress
05/02/2024Structural Steel - DetailsRyan Hansenspecial
05/02/2024Structural Stability – Alterations of existing buildingsRyan Hansenspecial
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch11
08/27/2026B00852568-I1Request digital key ↗
08/27/2026B00852572-I1Request digital key ↗
08/21/2026B01242302-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00227719-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00239430-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
03/03/2020321982020Open ↗
03/03/2020321982020Open ↗
08/08/2019321982020Open ↗
▸BISWORK PERMIT APPLICATION1
09/11/2019321982020Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026B00852572-I1Open ↗
08/26/2026B00945785-P1Open ↗
08/26/2026B00945785-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/30/2026B00945785-I1Open ↗
08/28/2026B01352573-I1Open ↗
08/23/2026B00945785-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/26/2020321982020Open ↗
01/16/2020321982020Open ↗
11/06/2019321982020Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B01352573-I1Open ↗
08/23/2026B00945785-P1Open ↗
08/23/2026B01352573-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/08/2019321982020Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/08/2019321982020Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026B00239430-I1Open ↗
08/13/2026B00227719-I1Open ↗
▸BISSTREET TREE CHECKLIST1
08/08/2019321982020Open ↗
▸BISTenant Protection Plan and Notes1
08/08/2019321982020Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00852572-I1Open ↗
08/17/2026B01352573-P2Open ↗
08/15/2026B00945785-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/08/2019321982020Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/26/2020321982020Open ↗
01/16/2020321982020Open ↗
11/06/2019321982020Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/26/2020321982020Open ↗
11/06/2019321982020Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/07/2020321982020Open ↗
05/07/2020321982020Open ↗
03/26/2020321982020Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/26/2020321982020Open ↗
11/14/2019321982020Open ↗
11/06/2019321982020Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM4
03/26/2020321982020Open ↗
03/03/2020321982020Open ↗
11/14/2019321982020Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
08/08/2019321982020Open ↗