RoofUnder Construction16p · 3 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction
HEREWITH FILE TO RENOVATE EAT-IN & TO-GO STORE. WORK INCLUDES NEW PLUMBING FIXTURE WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. MODIFICATION OF EXISTING SPRINKLER HEAD AS SHOWN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
37 documents · 3 drawing sheets
GENERAL INTERIOR RENOVATION AT 6TH FLOOR APT# 21 AND TO ADD BULKHEAD SPACE TO ROOF
On file for this project
6 documents · 4 drawing sheets
EXTERIOR FACADE REPAIRS. WORK SHALL INCLUDE MORTAR JOINT REPOINTING, CRACKED EXTERIOR WYTHE BRICK REPLACEMENT AND DECORATIVE STONE REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Floor 611p · 1 filing · 6 docs
ArchitectureDM
Issued Permit Scope
General Construction
GENERAL INTERIOR RENOVATION AT 6TH FLOOR APT# 21 AND TO ADD BULKHEAD SPACE TO ROOF
On file for this project
6 documents · 6 drawing sheets
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction11p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
HEREWITH FILE TO RENOVATE EAT-IN & TO-GO STORE. WORK INCLUDES NEW PLUMBING FIXTURE WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. MODIFICATION OF EXISTING SPRINKLER HEAD AS SHOWN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
37 documents · 1 drawing sheet
HEREWITH FILE FOR TENANT FIT-OUT SPACE. INTERIOR DEMO WORK INCLUDES REMOVAL OF NON-LOAD BEARING PARTITION WALL, FLOOR COVERING, MILLWORK, CEILING TILE FINISH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
CellarUnder Construction5p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
HEREWITH FILE TO RENOVATE EAT-IN & TO-GO STORE. WORK INCLUDES NEW PLUMBING FIXTURE WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. MODIFICATION OF EXISTING SPRINKLER HEAD AS SHOWN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
37 documents
HEREWITH FILE FOR TENANT FIT-OUT SPACE. INTERIOR DEMO WORK INCLUDES REMOVAL OF NON-LOAD BEARING PARTITION WALL, FLOOR COVERING, MILLWORK, CEILING TILE FINISH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
3 documents
Site & exterior5p · 2 filings · 8 docs
ArchitectureElectricalEquipmentGeneral
Issued Permit Scope
General Construction · Sidewalk Shed
EXTERIOR FACADE REPAIRS. WORK SHALL INCLUDE MORTAR JOINT REPOINTING, CRACKED EXTERIOR WYTHE BRICK REPLACEMENT AND DECORATIVE STONE REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents · 4 drawing sheets
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Filed — no permit issued10p · 2 filings · 6 docs
ArchitectureDMGeneralPlumbingOther
No filed description on record for this project.
On file for this project
3 documents · 6 drawing sheets
INTERIOR PLUMBING WORK OF APT 21 AS PER PLANS FILED HEREWITH
On file for this project
3 documents · 4 drawing sheets