← Back
BuildNYC
Elevator cooperative
Amele Hall
536 WEST 111TH STREET · Name © OpenStreetMap contributors · Morningside Heights · BIN 1056915
💬 Discuss this project
1910Year Built
8Stories
D4Building Class
R8Zoning
47,020 sfGross Floor Area
40Units
LL97 CoveredRent Stabilized2 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 536 Owners · 8,410 sf lot · 5.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBns Real EstateUnder Construction1p · 1 filing · 10 docs
Floor 78p · 2 filings · 19 docs
Floor 63p · 1 filing · 10 docs
Floor 51p · 1 filing · 5 docs
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorBns Real EstateUnder Construction6p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
536 Owners2803/22/2026
BNS Real Estate1608/27/2026
OM General Contraction408/27/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab107/23/2025
Mariana Riobom Architecture107/09/2025
Lane Engineering Consulting101/14/2025
Forty Seventy-Three302/02/2023
Sarah Jacoby Architect203/18/2020
Royal T&E110/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
Joseph Fellner203/21/2026
MK Exp103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Parsons ConstructionScaffold407/08/2026
Apollo Plumbing & HeatingPlumbing307/08/2026
OM General Contractors CoGeneral Contractor208/27/2026
OM General Contractors CoScaffold208/27/2026
Shuir Electrical ContractorsElectrical203/22/2026
Atrium InteriorsGeneral Contractor203/21/2026
Pilato Brothers Plumbing & Heating CoPlumbing107/08/2026
Reliant Power SystemsElectrical103/22/2026
J & Y Electric and Inter*Electrical103/21/2026
A. Pilato PlumbingPlumbing107/08/2026
AK Electrical MntnceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE2050107/09/2025
Lane Engineering Consulting2967101/14/2025
Aks Architectural & Engineering1957302/02/2023
Building Lifecycle
All (124)Filed (10)Permit Issued (14)Signed Off (5)Facade (FISP) (15)Violation (26)Inspection (8)Objection (32)Special Inspection (14)
08/26/2026
Permit issued — General Construction
M01093609-I1-GC
08/26/2026
Permit issued — Sidewalk Shed
M01256870-I1-SH
08/26/2026
Permit issued — Suspended Scaffold
M01261381-I1-SC
08/25/2026
Violation issued (ECB, closed)
Construction
08/25/2026
Violation issued (ECB, open)
Construction
08/25/2026
Violation issued (ECB, open)
Unknown
05/26/2026
Signed off — Alteration
Propose to replace and relocate existing plumbing fixtures in Unit #57 on the 5th Floor.
M01236367-I1
02/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/17/2025
Cycle 9 facade report submitted
10/17/2025
Cycle 9 facade report signed — SWARMP
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2025
Cycle 9 facade inspection completed
09/05/2025
Permit issued — Plumbing
M01236367-I1-PL
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
08/11/2025
Permit issued — General Construction
M01093609-I1-GC
08/08/2025
Objection raised — Plumbing
08/08/2025
Objection raised — Plumbing
08/08/2025
Objection raised — Plumbing
08/08/2025
Objection raised — Plumbing
08/08/2025
Objection raised — Plumbing
08/08/2025
Objection raised — Other
08/08/2025
Objection raised — Plumbing
08/01/2025
Objection resolved — Addressed
07/30/2025
Permit issued — Suspended Scaffold
M01261381-I1-SC
07/25/2025
Filed — Alteration
INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
M01261381-I1
07/24/2025
Permit issued — Sidewalk Shed
M01256870-I1-SH
07/24/2025
Objection raised — Cost
07/24/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Younes Abouyaala
07/23/2025
Filed — Alteration
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with Chapter #33 of the 2022 Building Code.
M01256870-I1
07/09/2025
Filed — Alteration
Propose to replace and relocate existing plumbing fixtures in Unit #57 on the 5th Floor.
M01236367-I1
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
PAUL MARINO
01/15/2025
Objection raised — Admin
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Scope
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Scope
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Other
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Other
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Mechanical
01/15/2025
Objection resolved — Addressed
01/14/2025
Filed — Alteration
Exterior restoration to include brick replacement, masonry repointing, stone and crack repair as per plans fled herewith. No change to use, egress or occupancy.
M01093609-I1
01/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
01/14/2025
Special inspection requirement — Masonry
Douglas Lane
01/14/2025
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
01/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
08/08/2024
Special inspection requirement — Final
Douglas Lane
08/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
Douglas Lane
12/11/2023
Cycle 9 facade report submitted
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedOM General Contractors Co08/26/2026
DOB NOWSidewalk ShedPermit IssuedOM General Contractors Co08/26/2026
DOB NOWSuspended ScaffoldPermit IssuedOM General Contractors Co08/26/2026
DOB NOWPlumbingSigned-offApollo Plumbing & Heating09/05/2025
DOB NOWGeneral ConstructionPermit IssuedOM General Contractors Co08/11/2025
DOB NOWSuspended ScaffoldPermit IssuedOM General Contractors Co07/30/2025
DOB NOWSidewalk ShedPermit IssuedOM General Contractors Co07/24/2025
DOB NOWPlumbingSigned-offApollo Plumbing & Heating09/01/2023
DOB NOWPlumbingSigned-offApollo Plumbing & Heating01/17/2023
DOB NOWGeneral ConstructionSigned-offAtrium Interiors12/01/2022
DOB NOWPlumbingSigned-offA. Pilato Plumbing06/23/2021
DOB NOWSidewalk ShedSigned-offParsons Construction10/13/2020
DOB NOWPlumbingSigned-offPilato Brothers Plumbing & Heating Co01/15/2020
DOB NOWSidewalk ShedSigned-offParsons Construction10/02/2019
BISOTISSUEDCustom Interiors by Jbi I02/08/2021
BISOTISSUEDOM General Contractors Co09/08/2020
BISOTISSUEDCustom Interiors by Jbi I07/22/2020
BISOTISSUEDOM General Contractors Co05/28/2020
BISOTISSUEDOM General Contractors Co01/10/2020
BISPLISSUEDPractical Plumbing & Heating07/16/2019
BISOTISSUEDAtrium Interiors06/11/2019
BISOTISSUEDOM General Contractors Co10/29/2014
BISOTISSUEDOM General Contractors Co10/29/2014
BISOTISSUEDOM General Contractors Co08/25/2014
BISPLISSUEDOrion Plumbing & Heating10/18/2012
BISOTISSUEDHenrysmith Property Management10/02/2012
BISOTISSUEDM & M Construction01/17/2012
BISPLISSUEDTime Mechanicals03/30/2011
BISOTISSUEDLarry Beddall03/28/2011
BISOTISSUEDLarry Beddall03/28/2008
BISOTISSUEDLarry Beddall01/18/2008
BISEQISSUEDRockledge Scaffold04/04/2006
BISEQISSUEDRockledge Scaffold09/09/2005
BISPLISSUEDP.S.I. Mechanical02/09/2005
BISOTISSUEDLarry Beddall01/20/2005
BISPLISSUEDAccurate Mechanical02/18/2004
BISOTISSUEDLarry Beddall12/22/2003
BISOTISSUEDEuro Central Contracting06/27/2003
BISOTISSUEDUnited Construction Weatherproof05/29/1997
BISEQISSUEDColgate Scaffolding01/24/1997
+ 1 more permits on file
1 project · most recent 07/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/09/2025Signed-offApollo Plumbing & HeatingGas, Water/Sanitary
14 projects · most recent 08/25/2026
General Wiring
FiledStatusContractorScope
08/25/2026Permit IssuedSpice Electric Company—
06/02/2026CompleteAK Electrical MntnceGeneral Wiring
04/17/2026CompleteReliant Power SystemsGeneral Wiring
05/23/2025CompleteShuir Electrical Contractors—
12/16/2024CompleteShuir Electrical ContractorsGeneral Wiring
12/08/2022CompleteKva Electrical CoGeneral Wiring
01/27/2022CompleteRobert Chimenti42 meters, 1 new_meters
05/17/2021CompleteBronxdale ElectricGeneral Wiring
12/01/2020CompleteShuir Electrical ContractorsGeneral Wiring
08/15/2020CompleteOhm Pro Electl ConstructionGeneral Wiring
01/05/2020CompleteGauge Tech ElectricGeneral Wiring
10/01/2019CompleteRichard Neu—
09/23/2019Permit IssuedKva Electrical CoGeneral Wiring
10/12/2018Permit IssuedKva Electrical CoGeneral Wiring
1 project · most recent 07/23/2025
Sidewalk Shed
FiledStatusContractorScope
07/23/2025Permit IssuedOM General Contractors CoSidewalk Shed
1 project · most recent 07/25/2025
Suspended Scaffold
FiledStatusContractorScope
07/25/2025Permit IssuedOM General Contractors CoSuspended Scaffold
1 project · most recent 07/25/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/25/2025Permit IssuedOM General Contractors CoSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/12/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/24/2025Alternative Materials - OTCR Buildings Bulletin NumberYounes Abouyaalaspecial
06/26/2025Tenant Protection Plan CompliancePAUL MARINOspecial
01/14/2025Energy Code Compliance InspectionsDouglas Laneprogress
01/14/2025MasonryDouglas Lanespecial
01/14/2025Air barrier - visual inspectionDouglas Laneenergy_progress
01/14/2025Structural Stability – Alterations of existing buildingsDouglas Lanespecial
08/08/2024FinalDouglas Laneprogress
08/08/2024Tenant Protection Plan ComplianceDouglas Lanespecial
02/03/2023Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
02/02/2023Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
10/10/2022Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
10/10/2022FinalNICHOLAS BROWNprogress
09/30/2019FinalSunil Saigalprogress
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
09/01/2026M08018555-P1Request digital key ↗
08/22/2026M01236367-I1Request digital key ↗
08/22/2026M01256870-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00268484-I1Request digital key ↗
08/15/2026M00268484-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00237442-I1Request digital key ↗
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION16
09/25/2020123887268Open ↗
09/18/2020123887268Open ↗
08/31/2020123887268Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION14
01/13/2020123887268Open ↗
12/20/2019123845358Open ↗
07/16/2019123452708Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWLPC Approval/Permit9
08/13/2026M00268484-I1Open ↗
08/13/2026M08018549-I1Open ↗
08/13/2026M01093609-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
12/17/2019123845358Open ↗
11/26/2019123845358Open ↗
11/26/2019123845358Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00268484-P1Open ↗
09/05/2026M00268484-I1Open ↗
08/22/2026M01236367-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M08018549-I1Open ↗
09/01/2026M01236367-I1Open ↗
09/01/2026M08018555-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M08018549-I1Open ↗
08/29/2026M00237442-I1Open ↗
08/28/2026M01093609-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/10/2019123887268Open ↗
06/10/2019123452708Open ↗
09/18/2012121376028Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/18/2012121376028Open ↗
11/18/2011120888986Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/10/2019123887268Open ↗
06/10/2019123452708Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
12/05/2019123452708Open ↗
12/03/2019123452708Open ↗
11/04/2019123452708Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/14/2012121376028Open ↗
12/13/2012121376028Open ↗
09/18/2012121376028Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
05/31/2013121376028Open ↗
06/10/2011120588257Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
10/10/2019123887268Open ↗
06/10/2019123452708Open ↗
09/01/2020123845358Open ↗
▸DOB NOWTenant Protection Plan3
08/13/2026M00268484-I1Open ↗
08/13/2026M00268484-P1Open ↗
08/13/2026M00237442-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/05/2026M00268484-P1Open ↗
09/05/2026M00268484-I1Open ↗
08/22/2026M01236367-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
07/20/2020123845358Open ↗
11/26/2019123845358Open ↗
10/10/2019123887268Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
12/19/2011120888986Open ↗
01/28/2011120588257Open ↗
01/04/2008110057367Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/10/2019123887268Open ↗
06/10/2019123452708Open ↗
07/10/2015122027555Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/20/2021123845358Open ↗
01/27/2021123887268Open ↗
07/20/2020123845358Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
08/20/2021123845358Open ↗
01/27/2021123887268Open ↗
01/26/2021123452708Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/10/2015122027555Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/20/2021123845358Open ↗
01/27/2021123887268Open ↗
01/26/2021123452708Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/20/2021123845358Open ↗
01/27/2021123887268Open ↗
01/26/2021123452708Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL4
07/20/2020123845358Open ↗
01/10/2020123887268Open ↗
11/26/2019123845358Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/18/2012121376028Open ↗
11/18/2011120888986Open ↗
01/28/2011120588257Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
08/20/2021123845358Open ↗
01/27/2021123887268Open ↗
01/26/2021123452708Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT13
08/20/2021123845358Open ↗
09/25/2020123887268Open ↗
07/20/2020123845358Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/27/2021123887268Open ↗
01/26/2021123452708Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION6
09/25/2020123887268Open ↗
09/01/2020123845358Open ↗
07/20/2020123845358Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET6
11/26/2019123845358Open ↗
10/10/2019123887268Open ↗
06/10/2019123452708Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet1
06/07/2014122027555Open ↗
▸BISBOROUGH INTAKE FORM1
11/04/2019123452708Open ↗
▸Other Documents6
▸DOB NOWProof of Historic Building3
08/13/2026M08018555-P1Open ↗
08/13/2026M08018549-I1Open ↗
08/13/2026M08018555-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
10/03/2012121376028Open ↗
▸DOB NOWCalculations1
08/13/2026M01261381-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01261381-I1Open ↗