← Back
BuildNYC
One family attached or semi-detached
537 HOLLYWOOD AVENUE
BRONX · BIN 2077229
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R4Zoning
1,998 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Fire damaged repair1p · 1 filing · 10 docs
Floor 1
CellarResidence renovation and fire damage repair6p · 1 filing · 12 docs
BasementResidence renovation and fire damage repair5p · 2 filings · 20 docs
Sub-BasementFire damaged repair1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kenneth Koons, Architects305/28/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A Guaman ConstructionGeneral Contractor707/08/2026
M&G Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Kenneth Koons, Architects1548305/28/2022
Building Lifecycle
03/22/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X00634959-I1-GC
04/04/2023
Permit renewed — General Construction
Renewed without changes
X00634959-I1-GC
12/19/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA Guaman Construction04/04/2023
DOB NOWGeneral ConstructionPermit IssuedA Guaman Construction07/26/2022
DOB NOWPlumbingSigned-offM&G Plumbing and Heating06/01/2022
DOB NOWGeneral ConstructionPermit IssuedA Guaman Construction03/30/2022
1 project · most recent 05/28/2022
Gas Water/Sanitary
FiledStatusContractorScope
05/28/2022Signed-offM&G Plumbing and HeatingGas, Water/Sanitary
1 project · most recent 05/27/2022
General Wiring
FiledStatusContractorScope
05/27/2022CompleteR.M.F. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/19/2022Fail-Final General Construction Non-Directive 14FailView ↗
09/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/31/2022Fire-Resistant Penetrations and JointsKenneth Koonsspecial
05/31/2022HVAC-R and service water heating equipmentKenneth Koonsenergy_progress
05/28/2022HVAC-R and service water heating equipmentKenneth Koonsenergy_progress
05/28/2022Fire-Resistant Penetrations and JointsKenneth Koonsspecial
11/20/2021Insulation placement and R valuesKenneth Koonsenergy_progress
11/20/2021Fire-Resistant Penetrations and JointsKenneth Koonsspecial
11/20/2021Fenestration and door U-factor and product ratingsKenneth Koonsenergy_progress
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account