← Back
Miscellaneous theatre
537 WEST 26 STREET
MANHATTAN · BIN 1012390
💬 Discuss this project
1914Year Built
1Stories
J9Building Class
M1-5Zoning
15,254 sfGross Floor Area
2Units
3 Open Violations ▸
Miscellaneous theatre · Owner of record: VNO 537 WEST 26TH STREET OWNER LLC · 13,825 sf lot · 1.1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Roof5p · 3 filings · 20 docs
Floor 140p · 20 filings · 19 docs
Mezzanine4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VORNADO REALTY TRUST7909/22/2026
VORNADO OFFICE MANAGEMENT1607/08/2026
962 THIRD AVENUE ASSOCIATES407/08/2026
547 WEST 26TH STREET OWNER203/21/2026
EMM203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2018$44.0M—— → —$2,883/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS3903/21/2026
BOYD CONSULTING403/21/2026
ARCHETYPE CONSULTANTS2403/21/2026
SEAN OBRIEN ARCHITECTURE203/21/2026
NEW YORK SIGN CONSULTANTS803/21/2026
NYCCODE203/21/2026
BUILDING BROTHERS403/21/2026
DAVID STERN ARCHITECTURE103/21/2026
PATRICIA L. GASS203/21/2026
ABRAMSON ARCHITECTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYFF EVENTS LLCGeneral Contractor2509/22/2026
WINICK PRODUCTIONS, LLCGeneral Contractor1007/15/2026
SPECTRUM.WIDE PRODUCTIONSGeneral Contractor707/08/2026
CAPITAL IMPROVEMENT SERVICESGeneral Contractor707/08/2026
ARENA EVENT SERVICES INCGeneral Contractor707/08/2026
MAUCERI SIGNScaffold407/08/2026
FONTAO MANAGEMENT INCGeneral Contractor207/08/2026
R G M SIGNSScaffold107/08/2026
TRISTATE PLBG SVCS CORPFire Protection107/08/2026
VILLAGE P & H NY INCFire Protection107/08/2026
STEELDECK NY INCGeneral Contractor107/08/2026
TRISTATE PLBG SVCS CORPPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
E G ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983506/09/2021
Building Lifecycle
All (258)Filed (80)Permit Issued (49)Signed Off (17)Violation (12)Inspection (3)Objection (67)Special Inspection (30)
09/21/2026
Permit issued — General Construction
M01455806-I1-GC
09/09/2026
Permit issued — General Construction
M01453360-I1-GC
07/29/2026
Signed off — Alteration
Temporary Installation to be used on a temporary event " Real Self Summit". All the Installations are to be removed upon completion of the event.
M01391317-I1
07/29/2026
Signed off — Alteration
Temporary Installations to be used on a temporary event " ANKER DAY 2026". All the Installations are to be removed upon completion of the event.
M01398256-I1
07/29/2026
Signed off — Alteration
Temporary Installations to be used on a temporary event " Future of Finance Road Show". All the Installations are to be removed upon completion of the event.
M01394243-I1
07/14/2026
Permit issued — General Construction
M01427754-I1-GC
07/10/2026
Filed — Alteration
Temporary structures for soccer watch party event. Structures removed at the end of the programing. No changes to existing structures, use or egress.
M01427754-I1
07/10/2026
Filed — No Work
M01427796-I1
07/08/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
06/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/15/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Other
06/12/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
06/11/2026
Filed — Alteration
Temporary interior structures for events. Removed at the end of the programing. No changes to existing structures, use or egress.
M01292961-P2
06/10/2026
Filed — No Work
M01414365-I1
06/09/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
05/20/2026
Permit issued — General Construction
M01398256-I1-GC
05/18/2026
Objection resolved — Addressed
05/17/2026
Objection raised — Other
05/15/2026
Filed — Alteration
Temporary Installations to be used on a temporary event " ANKER DAY 2026". All the Installations are to be removed upon completion of the event.
M01398256-I1
05/15/2026
Filed — No Work
M01398257-I1
05/15/2026
Special inspection requirement — Final
Christopher Carrano
05/12/2026
Permit issued — General Construction
M01394243-I1-GC
05/11/2026
Objection resolved — Addressed
05/09/2026
Objection raised — Other
05/07/2026
Filed — Alteration
Temporary Installations to be used on a temporary event " Future of Finance Road Show". All the Installations are to be removed upon completion of the event.
M01394243-I1
05/07/2026
Filed — No Work
M01394244-I1
05/07/2026
Permit issued — General Construction
M01391317-I1-GC
05/07/2026
Special inspection requirement — Final
Christopher Carrano
05/01/2026
Filed — Alteration
Temporary Installation to be used on a temporary event " Real Self Summit". All the Installations are to be removed upon completion of the event.
M01391317-I1
05/01/2026
Filed — No Work
M01391318-I1
04/28/2026
Special inspection requirement — Final
Christopher Carrano
04/21/2026
Filed — No Work
M01386983-I1
04/13/2026
Signed off — Alteration
Temporary Installations to be used on a temporary event " Automotive Press Reveal". All the Installations are to be removed upon completion of the event.
M01371989-I1
04/10/2026
Permit issued — General Construction
M01382706-I1-GC
04/09/2026
Filed — No Work
M01382756-I1
04/08/2026
Filed — Alteration
Install of temp platform, LED screen, scenic walls, no alt to exist structures for Paramount Upfront. A TPA is required. Producer is responsible to monitor site safety. All production equipment removed upon event completion.
M01382706-I1
04/03/2026
Special inspection requirement — Final
DANNY TRUJILLO
04/02/2026
Filed — No Work
M01381602-I1
03/25/2026
Permit issued — General Construction
M01371989-I1-GC
03/23/2026
Filed — Alteration
Temporary Installations to be used on a temporary event " Automotive Press Reveal". All the Installations are to be removed upon completion of the event.
M01371989-I1
03/23/2026
Filed — No Work
M01371988-I1
03/23/2026
Filed — Alteration
Temporary interior structures for events. Removed at the end of the programing. No changes to existing structures, use or egress.
M01292961-P1
03/23/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
03/20/2026
Filed — No Work
M01374573-I1
03/18/2026
Special inspection requirement — Final
Christopher Carrano
03/12/2026
Signed off — Alteration
Temporary Installations to be used on a temporary event "Alera Skin Care". All the Installations are to be removed upon completion of the event.
M01294654-I1
02/12/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Admin
02/10/2026
Filed — No Work
M01357498-I1
02/02/2026
Filed — No Work
M01352306-I1
01/28/2026
Signed off — Alteration
M01322540-I1
01/20/2026
Signed off — Alteration
M01312696-I1
12/01/2025
Filed — No Work
M01322920-P1
12/01/2025
Permit issued — General Construction
M01322540-I1-GC
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/25/2025
Filed — Alteration
M01322540-I1
11/25/2025
Filed — No Work
M01322920-I1
11/25/2025
Objection raised — Structural
Latest 60 of 258 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYFF EVENTS LLC09/21/2026
DOB NOWGeneral ConstructionPermit IssuedNYFF EVENTS LLC09/09/2026
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC07/14/2026
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC05/20/2026
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC05/12/2026
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC05/07/2026
DOB NOWGeneral ConstructionPermit IssuedFONTAO MANAGEMENT INC04/10/2026
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC03/25/2026
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC12/01/2025
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC11/13/2025
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC10/03/2025
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC10/01/2025
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC04/24/2025
DOB NOWGeneral ConstructionPermit IssuedFONTAO MANAGEMENT04/24/2025
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC03/27/2025
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC03/21/2025
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC02/04/2025
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC09/19/2024
DOB NOWGeneral ConstructionSigned-offSTEELDECK NY INC05/17/2024
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC04/19/2024
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC04/15/2024
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC03/14/2024
DOB NOWGeneral ConstructionSigned-offARENA EVENT SERVICES INC02/07/2024
DOB NOWGeneral ConstructionPermit IssuedSPECTRUM.WIDE PRODUCTIONS01/23/2024
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC11/22/2023
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC10/27/2023
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC09/29/2023
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC06/08/2023
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC05/02/2023
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC04/11/2023
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC11/15/2022
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC11/15/2022
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC11/15/2022
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC11/14/2022
DOB NOWGeneral ConstructionSigned-offSPECTRUM.WIDE PRODUCTIONS10/31/2022
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC10/17/2022
DOB NOWGeneral ConstructionSigned-offSPECTRUM.WIDE PRODUCTIONS10/07/2022
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC09/14/2022
DOB NOWGeneral ConstructionSigned-offARENA EVENT SERVICES INC08/23/2022
DOB NOWGeneral ConstructionSigned-offARENA EVENT SERVICES INC05/03/2022
+ 37 more permits on file
5 projects · most recent 05/12/2025
General Wiring
FiledStatusContractorScope
05/12/2025CompleteA & S ELECTRIC INC.—
06/26/2023CompleteA & S ELECTRIC INC.—
12/20/2022CompleteA & S ELECTRIC INC.—
01/04/2022CompleteE G ELECTRIC INCGeneral Wiring
02/24/2021CompleteE G ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/16/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/08/2026FinalANDY ENGLER ROTHprogress
06/12/2026FinalANDY ENGLER ROTHprogress
06/09/2026FinalANDY ENGLER ROTHprogress
05/15/2026FinalChristopher Carranoprogress
05/07/2026FinalChristopher Carranoprogress
04/28/2026FinalChristopher Carranoprogress
04/03/2026FinalDANNY TRUJILLOprogress
03/23/2026FinalANDY ENGLER ROTHprogress
03/18/2026FinalChristopher Carranoprogress
10/02/2025FinalChristopher Carranoprogress
03/31/2025FinalDANNY TRUJILLOprogress
03/20/2025FinalChristopher Carranoprogress
08/27/2024FinalChristopher Carranoprogress
05/02/2024Finalsean obrienprogress
04/09/2024FinalDANNY TRUJILLOprogress
03/04/2024FinalChristopher Carranoprogress
01/09/2024FinalDANNY TRUJILLOprogress
11/20/2023FinalChristopher Carranoprogress
10/18/2023FinalChristopher Carranoprogress
09/18/2023FinalChristopher Carranoprogress
08/14/2023Public Assembly Emergency LightingALEXIS SCHLESSINGERMANprogress
05/23/2023FinalChristopher Carranoprogress
05/05/2023Finalsean obrienprogress
02/03/2023FinalANDY ENGLER ROTHprogress
09/26/2022FinalDANNY TRUJILLOprogress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Experiential GroupOtherFloor 1
Project M01427754 Alteration · Permit Entire · 07/10/2026
Bureau BetakOtherFloor 1
Project M01322540 Alteration · LOC Issued · 11/25/2025
BentleyRetailGround
Project M01312696 Alteration · LOC Issued · 11/06/2025
Parlux EventOther—
Project M01278230 No Work · TA Certificate of Operation Issued · 09/02/2025
Motorola RazrOtherFloor 1
Project M01203291 Alteration · Permit Entire · 04/21/2025
Infinity MarketingOther—
Project M01206849 No Work · TA Certificate of Operation Issued · 04/14/2025
Giant Spoon LLCRestaurant / Food ServiceFloor 1
Project M01199705 No Work · TA Certificate of Operation Issued · 04/08/2025
Cbs SurviorOther—
Project M01180402 No Work · TA Certificate of Operation Issued · 02/14/2025
McDonalds Change of FashionRestaurant / Food Service—
Project M01173200 Alteration · LOC Issued · 01/31/2025
Vancouver Fashion WeekOtherGround
Project M01169043 No Work · TA Certificate of Operation Issued · 01/27/2025
Chelsea Factory Presents Jacob's PillowOther—
Project M01135122 No Work · TA Certificate of Operation Issued · 11/01/2024
Fremont Art ShowOther—
Project M01114475 No Work · TA Certificate of Operation Issued · 09/30/2024
Snapchat Beauty & Luxury SummitsOffice—
Project M01102690 No Work · TA Certificate of Operation Issued · 09/17/2024
Stuart Weissman ProductionsRestaurant / Food ServiceFloor 1
Project M01105544 No Work · TA Certificate of Operation Issued · 09/11/2024
Urban OutfittersRetail—
Project M01072724 No Work · TA Certificate of Operation Issued · 07/02/2024
Women's Sports SummitOtherGround
Project M01032678 Alteration · Permit Entire · 04/15/2024
Fete At The FactoryRestaurant / Food Service—
Project M01008369 No Work · TA Certificate of Operation Issued · 02/22/2024
Img FocusOtherFloor 1
Project M01000679 Alteration · LOC Issued · 02/05/2024
LululemonRetailFloor 1
Project M00988016 Alteration · Permit Entire · 01/19/2024
StarzOtherGround
Project M00965181 No Work · TA Certificate of Operation Issued · 11/21/2023
Project M00965180 Alteration · LOC Issued · 11/20/2023
Omega EventOther—
Project M00949871 Alteration · LOC Issued · 10/23/2023
Agency Upfront DinnersRestaurant / Food ServiceFloor 1
Project M00854281 No Work · TA Certificate of Operation Issued · 04/05/2023
GallimOtherGround
Project M08018799 Alteration · LOC Issued · 10/13/2022
Project M08019101 No Work · TA Certificate of Operation Issued · 10/13/2022
Polka Dot WeddingOtherGround
Project M08001121 Alteration · LOC Issued · 09/19/2022
Nars PowermatteRetail—
Project M08000640 Alteration · LOC Issued · 09/13/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 569 on file (BIS + DOB NOW)
▸Plans & Drawings144
▸DOB NOWPlans/Sketch - Temporary Place of Assembly94
09/05/2026M00122855-I1Request digital key ↗
09/05/2026M00158433-I1Request digital key ↗
09/05/2026M00158715-I1Request digital key ↗
Showing 3 of 94 on file for this type
▸DOB NOWPlans/Sketch36
09/03/2026M00524343-I1Request digital key ↗
09/01/2026M08000640-I1Request digital key ↗
09/01/2026M08010347-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/03/2026M00336414-P1Request digital key ↗
09/03/2026M00336414-P3Request digital key ↗
09/03/2026M00336414-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
09/03/2026M00424447-P3Request digital key ↗
09/03/2026M00424447-I1Request digital key ↗
09/03/2026M00424447-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00168499-P1Request digital key ↗
09/05/2026M00168499-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/03/2026M00336416-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/04/2026M00336411-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00336413-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION22
05/03/2022141008923Open ↗
09/17/2021140914580Open ↗
09/16/2021140914580Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION13
02/11/2021140914580Open ↗
02/11/2021140914580Open ↗
02/24/2020123569227Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWLPC Approval/Permit11
09/03/2026M00336414-P3Open ↗
09/03/2026M00336414-P2Open ↗
09/03/2026M00336414-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/18/2020140914580Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/20/2021140914580Open ↗
▸BISPLACE OF ASSEMBLY1
01/15/2019104091956Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE DESIGN CERTIFICATION2
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
▸Seals & Professional Certifications240
▸DOB NOWDPL-1: Design Professional Seal & Signature146
09/05/2026M00158715-I1Open ↗
09/05/2026M00191127-I1Open ↗
09/05/2026M00215623-I1Open ↗
Showing 3 of 146 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/25/2026M01427754-I1Open ↗
09/24/2026M00988016-I1Open ↗
09/02/2026M00935414-I1Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
02/11/2021140914580Open ↗
02/11/2021140914580Open ↗
04/24/2020123746704Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
02/24/2020123569227Open ↗
12/26/2019123726637Open ↗
11/12/2019123742913Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
02/24/2020123569227Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/27/2026M00336411-P1Open ↗
08/27/2026M00336411-P1Open ↗
08/27/2026M00336411-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/20/2008110237360Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT3
01/23/2009110237360Open ↗
01/22/2009110237360Open ↗
06/01/2009110237360Open ↗
▸Safety & Tenant Protection35
▸DOB NOWHPD-1: Anti-Harassment Area Checklist20
09/03/2026M00336414-I1Open ↗
09/03/2026M00336414-P3Open ↗
09/03/2026M00336414-P1Open ↗
Showing 3 of 20 on file for this type
▸BISANTI-HARASSMENT CHECKLIST9
02/24/2020123569227Open ↗
12/26/2019123726637Open ↗
11/12/2019123742913Open ↗
Showing 3 of 9 on file for this type
▸BISANTI-HARASSMENT AREA CHECKLIST2
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
▸BISSTREET TREE CHECKLIST1
11/18/2020140914580Open ↗
▸BISSTREET TREE SIGNOFF1
11/08/2021140914580Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
03/26/2019123733102Open ↗
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/04/2026M00336411-I1Open ↗
09/04/2026M00336411-P1Open ↗
09/03/2026M00336414-P3Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/20/2008110237360Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/18/2020140914580Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/10/2015122379345Open ↗
▸BISNYCECC EXEMPTION1
11/18/2020140914580Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/03/2022141008923Open ↗
11/08/2021140914580Open ↗
06/11/2021123569227Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/24/2024123334418Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
06/11/2021123569227Open ↗
04/24/2020123746704Open ↗
03/17/2020123726637Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL2
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
▸BISFINAL1
05/24/2024123334418Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/20/2008110237360Open ↗
▸BISLANDMARKS SIGNOFF1
04/06/2022140914580Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
11/18/2020140914580Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
11/14/2019123887552Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET12
02/24/2020123569227Open ↗
12/26/2019123726637Open ↗
11/12/2019123742913Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM7
02/11/2021140914580Open ↗
04/24/2020123746704Open ↗
03/17/2020123726637Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
09/17/2021140914580Open ↗
07/01/2021140914580Open ↗
11/18/2020140914580Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/03/2022141008923Open ↗
11/18/2020140914580Open ↗
▸Other Documents26
▸DOB NOWAlternate Plan 53
09/03/2026M00424447-P2Open ↗
09/03/2026M00424447-P3Open ↗
09/03/2026M00424447-I1Open ↗
▸DOB NOWAlternate Plan 63
09/03/2026M00424447-P2Open ↗
09/03/2026M00424447-P3Open ↗
09/03/2026M00424447-I1Open ↗
▸DOB NOWAlternate Plan 93
09/03/2026M00424447-P2Open ↗
09/03/2026M00424447-I1Open ↗
09/03/2026M00424447-P3Open ↗
▸DOB NOWAlternate Plan 83
09/03/2026M00424447-P2Open ↗
09/03/2026M00424447-P3Open ↗
09/03/2026M00424447-I1Open ↗
▸DOB NOWAlternate Plan 103
09/03/2026M00424447-P2Open ↗
09/03/2026M00424447-P3Open ↗
09/03/2026M00424447-I1Open ↗
▸DOB NOWAlternate Plan 73
09/03/2026M00424447-P2Open ↗
09/03/2026M00424447-P3Open ↗
09/03/2026M00424447-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTCO - Supporting Documents1
04/06/2022140914580Open ↗
▸BISPLOT DIAGRAM1
11/18/2020140914580Open ↗