Roof4p · 2 filings · 20 docs
GeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Installation of (1) 3 ton air cooled split system for Office spaces., which will include (1) 8 ton air - cooled RTU.
On file for this project
9 documents · 1 drawing sheet
Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Violation #35459675P. In conj with GC#X00760850-I1. No change to use occupancy or egress under this application
On file for this project
14 documents · 2 drawing sheets
Floor 22p · 1 filing · 11 docs
Architecture
PAA filed herewith for minor layout revisions as per plans filed herewith.
On file for this project
11 documents · 2 drawing sheets
Floor 121p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Minor plumbing work related to installation of backflow device and minor boiler maintenance repairs for annual inspection as per plans filed herewith. In conjunction to PL #X00666605 & GC#X00760850.
On file for this project
4 documents
PAA filed herewith for minor layout revisions as per plans filed herewith.
On file for this project
11 documents
Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Violation #35459675P. In conj with GC#X00760850-I1. No change to use occupancy or egress under this application
On file for this project
14 documents
Filed — no permit issued3p · 1 filing · 3 docs
ArchitectureDMGeneral
No filed description on record for this project.
On file for this project
3 documents · 3 drawing sheets