← Back
Elevator apt, semi-fireproof without stores
538 EAST 21 STREET
BROOKLYN · Flatbush · BIN 3119498
💬 Discuss this project
1931Year Built
6Stories
D1Building Class
R7AZoning
41,772 sfGross Floor Area
53Units
LL97 CoveredRent Stabilized40 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: DITMAS PARK ASSOCIATES LLC, · 10,000 sf lot · 4.18 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar6p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHAMCO MANAGEMENT507/08/2026
DITMAS PARK ASSOCIATES LLC303/22/2026
SHAMAH PROPERTIES LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.304/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALAFOGIANNIS PLBG & HTGPlumbing208/26/2026
CIMENT, BARRYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808304/20/2026
Building Lifecycle
All (78)Filed (3)Permit Issued (3)Signed Off (2)Violation (60)Inspection (4)Special Inspection (6)
06/22/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER AS PER PLANS. INSTALL NEW GAS-FIRED HOT WATER HEATER AND TWO (2) HOT WATER STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01126422-S1
06/22/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER AS PER PLANS. INSTALL NEW GAS-FIRED HOT WATER HEATER AND TWO (2) HOT WATER STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01126422-I1
04/25/2026
Violation issued (HPD, open)
C
04/25/2026
Violation issued (HPD, open)
C
04/25/2026
Violation issued (HPD, closed)
B
04/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
04/20/2026
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER AS PER PLANS. INSTALL NEW GAS-FIRED HOT WATER HEATER AND TWO (2) HOT WATER STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01126422-P1
04/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2026
Violation issued (ECB, closed)
Elevators
02/15/2026
Violation issued (HPD, closed)
B
02/15/2026
Violation issued (HPD, closed)
B
02/06/2026
Permit issued — Plumbing
B01126422-S1-PL
02/03/2026
Violation issued (HPD, closed)
B
02/03/2026
Violation issued (HPD, closed)
B
01/15/2026
Violation issued (HPD, closed)
A
01/15/2026
Violation issued (HPD, closed)
A
01/15/2026
Violation issued (HPD, closed)
A
01/15/2026
Violation issued (HPD, open)
B
01/15/2026
Violation issued (HPD, closed)
C
01/15/2026
Violation issued (HPD, closed)
C
01/15/2026
Violation issued (HPD, open)
B
01/15/2026
Violation issued (HPD, closed)
A
01/15/2026
Violation issued (HPD, closed)
C
01/15/2026
Violation issued (HPD, closed)
A
01/15/2026
Violation issued (HPD, closed)
C
01/15/2026
Violation issued (HPD, closed)
C
01/03/2026
Violation issued (HPD, closed)
B
01/03/2026
Violation issued (HPD, closed)
B
12/09/2025
Violation issued (HPD, closed)
C
12/09/2025
Violation issued (HPD, closed)
C
12/09/2025
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, open)
C
12/05/2025
Violation issued (HPD, closed)
B
12/05/2025
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, closed)
B
12/05/2025
Violation issued (HPD, open)
B
11/09/2025
Violation issued (HPD, closed)
A
11/09/2025
Violation issued (HPD, closed)
B
11/09/2025
Violation issued (HPD, closed)
B
11/06/2025
Violation issued (HPD, closed)
B
11/06/2025
Violation issued (HPD, open)
B
11/06/2025
Violation issued (HPD, open)
B
11/06/2025
Violation issued (HPD, closed)
A
11/06/2025
Violation issued (HPD, open)
B
11/06/2025
Violation issued (HPD, closed)
A
10/27/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/20/2025
Violation issued (HPD, closed)
A
08/20/2025
Violation issued (HPD, open)
C
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, open)
C
08/05/2025
Violation issued (HPD, open)
C
07/21/2025
Violation issued (HPD, closed)
C
07/21/2025
Violation issued (HPD, open)
B
07/21/2025
Violation issued (HPD, open)
C
07/21/2025
Violation issued (HPD, open)
B
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG02/06/2026
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG11/21/2024
DOB NOWBoiler EquipmentSigned-offRB HTG CONSULTING GROUP11/15/2024
BISBLISSUEDAPPROVED OIL CO OF BKLYN09/30/2013
BISPLISSUEDTARDIO PLUMBING, LLC09/30/2013
BISEQISSUEDS S BRIDGING & SCAFFOLDIN07/27/2012
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/21/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
04/01/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
11/06/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
11/06/2024HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
11/06/2024HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
10/14/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026B01126422-S1Request digital key ↗
08/17/2026B01126422-I1Request digital key ↗
08/17/2026B01126422-P1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
10/10/2013320886902Open ↗
10/10/2013320886902Open ↗
07/30/2012320520325Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/10/2013320886902Open ↗
07/30/2012320520325Open ↗
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/10/2013320886902Open ↗
07/30/2012320520325Open ↗
02/18/2015320886902Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01126422-I1Open ↗
08/17/2026B01126422-P1Open ↗
08/17/2026B01126422-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B01126422-S1Open ↗
08/26/2026B01126422-I1Open ↗
08/24/2026B01126422-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/10/2013320886902Open ↗
07/30/2012320520325Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01126422-I1Open ↗
08/26/2026B01126422-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/10/2013320886902Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/30/2012320520325Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE1
07/22/2014320886902Open ↗
▸BISSCHEDULE B - PLUMBING1
10/10/2013320886902Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/10/2013320886902Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026B01126422-I1Open ↗
08/17/2026B01126422-P1Open ↗
08/17/2026B01126422-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/10/2013320886902Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/10/2013320886902Open ↗
10/10/2013320886902Open ↗
▸BISEN2 - As Built Energy Analysis1
02/18/2015320886902Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/18/2015320886902Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
07/22/2014320886902Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
10/10/2013320886902Open ↗
07/30/2012320520325Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
02/18/2015320886902Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/18/2015320886902Open ↗
10/10/2013320886902Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/10/2013320886902Open ↗
07/30/2012320520325Open ↗