P.S. 262 El Hajj Malik El Shabazz Elementary School
538 MACON STREET · BIN 3046876
💬 Discuss this project
1960Year Built
3Stories
W1Building Class
R6BZoning
191,520 sfGross Floor Area
0Units
LL97 Covered3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 102,800 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
General
Permit Issued — active, not yet Signed-off
Floor 3Under Construction1p · 1 filing · 20 docs
Floor 2
Floor 1
CellarUnder Construction1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3207/08/2026
TRIUMPH CONSTRUCTION503/22/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION 0403/22/2026
ROCON CORP.103/22/2026
DOE P.S. 262403/22/2026
DEPT.OF EDUCATION PS 262503/22/2026
DOE P.S.262 EL HAJJ MALIK103/22/2026
DOE K262 040103/22/2026
DEPARTMENT OF EDUCATION503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROHAN ENGINEERING, PC106/05/2026
JOSEPH MENZER702/26/2026
AK CONSULTING SERVICES, INC211/20/2025
ROCON CORP.310/11/2022
LOMBARDO PROFESSIONAL ENGINEERING111/01/2021
AKRF ENGINEERING, P.C.208/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOMBARDO BUILDING CONSULTANTS103/21/2026
SMB CONSULTANT203/21/2026
CASO ASSOCIATES1403/21/2026
ACE EXPEDITING & CONSULTING SERVICE603/21/2026
AK CONSULTING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCON CORPGeneral Contractor2507/08/2026
FRANCIS RICHARDSElectrical603/21/2026
TRIUMPH CONSTRUCTION CORPGeneral Contractor403/21/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
OM GENERAL CONTRACTORS COGeneral Contractor204/09/2026
OLYMPIC PLBG & HTG SVC INPlumbing207/08/2026
RUSS FLAUMElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
CREAMER ENVIRONMENTAL INCGeneral Contractor107/02/2026
VITAL PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317202/26/2026
FUTURE TECH CONSULTANTS O589210/11/2022
AKRF, INC.4728108/12/2021
UNIVERSAL TESTING AND INS400208/12/2021
Building Lifecycle
All (129)Filed (16)Permit Issued (20)Signed Off (3)Violation (60)Inspection (9)Objection (10)Special Inspection (11)
08/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/30/2026
Permit issued — Construction Fence
B01410826-I1-FN
06/29/2026
Objection resolved — Addressed
06/18/2026
Objection raised — Other
06/05/2026
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE FOR SOIL REMEDIATION
B01410826-I1
04/24/2026
Permit issued — Plumbing
B01020411-S1-PL
03/02/2026
Permit issued — General Construction
B01020411-I1-GC
02/26/2026
Filed — Alteration
Remove asphalt, concrete pavements, athletic surface paint & benches. Install trees, concrete curbs & pavement, chain link fences, gates, painted games, volleyball court, track & basketball half court & relocate drinking fountain. PAA in comments
B01020411-P4
02/26/2026
Filed — Alteration
Remove asphalt, concrete pavements, athletic surface paint & benches. Install trees, concrete curbs & pavement, chain link fences, gates, painted games, volleyball court, track & basketball half court & relocate drinking fountain. PAA in comments
B01020411-P5
02/25/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
01/21/2026
Permit issued — Construction Fence
B01278315-I1-FN
12/31/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Other
11/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01288440-I1
11/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 262K AT 500 MACON STREETBROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01278315-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Violation issued (FDNY_ORDER, closed)
09/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/28/2025
Objection resolved — Addressed
05/22/2025
Violation issued (ECB, open)
Construction
05/22/2025
Objection raised — Other
05/16/2025
Filed — Alteration
Remove asphalt, concrete pavements, athletic surface paint & benches. Install trees, concrete curbs & pavement, chain link fences, gates, painted games, volleyball court, track & basketball half court & relocate drinking fountain. PAA in comments
B01020411-P3
04/25/2025
Permit issued — Construction Fence
B00793896-I1-FN
03/18/2025
Permit issued — Sidewalk Shed
B00793896-I1-FN
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/07/2024
Violation issued (FDNY_ORDER, closed)
11/01/2024
Permit issued — General Construction
B00793896-S2-GC-CX
10/04/2024
Permit issued — Construction Fence
B00793896-I1-SH
05/08/2024
Filed — Alteration
Remove asphalt, concrete pavements, athletic surface paint & benches. Install trees, concrete curbs & pavement, chain link fences, gates, painted games, volleyball court, track & basketball half court & relocate drinking fountain. PAA in comments
B01020411-P2
05/07/2024
Filed — Alteration
Remove asphalt, concrete pavements, athletic surface paint & benches. Install trees, concrete curbs & pavement, chain link fences, gates, painted games, volleyball court, track & basketball half court & relocate drinking fountain. PAA in comments
B01020411-P1
03/25/2024
Filed — Alteration
Remove asphalt, concrete pavements, athletic surface paint & benches. Install trees, concrete curbs & pavement, chain link fences, gates, painted games, volleyball court, track & basketball half court & relocate drinking fountain. PAA in comments
B01020411-I1
03/25/2024
Filed — Alteration
Remove asphalt, concrete pavements, athletic surface paint & benches. Install trees, concrete curbs & pavement, chain link fences, gates, painted games, volleyball court, track & basketball half court & relocate drinking fountain. PAA in comments
B01020411-S1
03/19/2024
Permit issued — Sidewalk Shed
B00793896-I1-FN
11/07/2023
Permit issued — General Construction
B00793896-S2-GC-CX
10/10/2023
Permit issued — Construction Fence
B00793896-I1-FN
10/06/2023
Permit issued — Sidewalk Shed
B00793896-I1-SH
08/02/2023
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE RETENTION) PER DEP ON-SITE PUBLIC PROPERTY GREEN INFRASTRUCTURE RETROFIT CONTACT, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00516878-I1
02/09/2023
Violation issued (ECB, closed)
Construction
02/09/2023
Violation issued (ECB, closed)
Construction
02/09/2023
Violation issued (ECB, closed)
Construction
02/09/2023
Violation issued (ECB, closed)
Construction
02/09/2023
Violation issued (ECB, closed)
Construction
02/06/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/18/2023
Violation issued (ECB, closed)
Construction
11/07/2022
Permit issued — Boiler Equipment
B00793896-S1-BE
11/07/2022
Permit issued — General Construction
B00793896-S2-GC-CX
10/27/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/24/2022
Permit issued — Construction Fence
B00793896-I1-SH
10/24/2022
Permit issued — Construction Fence
B00793896-I1-FN
10/18/2022
Signed off — Alteration
B00621892-I1
10/14/2022
Objection raised — Other
10/14/2022
Objection resolved — Addressed
10/13/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/11/2022
Filed — Alteration
Filing Construction Fence and Sidewalk Shed Applications in conjunction with BIS DOB #322054085 , There is no change in Use, Occupancy or Egress.
B00793896-S2
10/11/2022
Special inspection requirement — Post-installed Anchors
Noel Tolentino
10/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
10/11/2022
Special inspection requirement — Chimneys and vents
Noel Tolentino
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedCREAMER ENVIRONMENTAL INC06/30/2026
DOB NOWPlumbingPermit IssuedVITAL PLUMBING, INC04/24/2026
DOB NOWGeneral ConstructionPermit IssuedOM GENERAL CONTRACTORS CO03/02/2026
DOB NOWConstruction FencePermit IssuedOM GENERAL CONTRACTORS CO01/21/2026
DOB NOWConstruction FencePermit IssuedROCON CORP04/25/2025
DOB NOWSidewalk ShedPermit IssuedROCON CORP03/18/2025
DOB NOWGeneral ConstructionPermit IssuedROCON CORP11/01/2024
DOB NOWConstruction FencePermit IssuedROCON CORP10/04/2024
DOB NOWSidewalk ShedPermit IssuedROCON CORP03/19/2024
DOB NOWGeneral ConstructionPermit IssuedROCON CORP11/07/2023
DOB NOWConstruction FencePermit IssuedROCON CORP10/10/2023
DOB NOWSidewalk ShedPermit IssuedROCON CORP10/06/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC11/07/2022
DOB NOWGeneral ConstructionPermit IssuedROCON CORP11/07/2022
DOB NOWConstruction FencePermit IssuedROCON CORP10/24/2022
DOB NOWConstruction FencePermit IssuedROCON CORP10/24/2022
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN09/22/2022
DOB NOWGeneral ConstructionSigned-offTRIUMPH CONSTRUCTION CORP11/10/2021
DOB NOWConstruction FenceSigned-offTRIUMPH CONSTRUCTION CORP11/03/2021
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN09/22/2021
BISOTISSUEDROCON CORP03/26/2026
BISMHISSUEDROCON CORP03/26/2026
BISPLISSUEDROCON CORP12/18/2025
BISOTISSUEDROCON CORP03/17/2025
BISOTISSUEDROCON CORP03/17/2025
BISMHISSUEDROCON CORP03/17/2025
BISPLISSUEDROCON CORP12/04/2024
BISBLISSUEDJACK PICCINI, INC10/10/2024
BISFBISSUEDJACK PICCINI, INC10/10/2024
BISOTISSUEDROCON CORP03/18/2024
BISMHISSUEDROCON CORP03/18/2024
BISOTISSUEDROCON CORP03/18/2024
BISMHISSUEDROCON CORP03/18/2024
BISPLISSUEDROCON CORP12/14/2023
BISBLISSUEDJACK PICCINI, INC10/11/2023
BISFBISSUEDJACK PICCINI, INC10/11/2023
BISBLRE-ISSUEDJACK PICCINI, INC03/27/2023
BISOTISSUEDROCON CORP03/17/2023
BISMHISSUEDROCON CORP03/17/2023
BISOTISSUEDROCON CORP03/17/2023
+ 24 more permits on file
1 project · most recent 10/11/2022
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/11/2022Permit IssuedROCON CORPHeating Systems
Heating
Burnham 3L-350 Boiler ×1
14 projects · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026Permit IssuedWIRE ELECTRIC INSTALLATION CO., INCGeneral Wiring
07/30/2026Permit IssuedWIRE ELECTRIC INSTALLATION CO., INCGeneral Wiring
06/15/2026CompleteCHARAN ELEC'L ENTERP'S IN—
10/19/2022Permit IssuedHEXAGON CONST & ELECL GRPGeneral Wiring
10/19/2022Permit IssuedHEXAGON CONST & ELECL GRP—
10/19/2022Permit IssuedHEXAGON CONST & ELECL GRP—
10/19/2022Permit IssuedHEXAGON CONST & ELECL GRPGeneral Wiring
09/02/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
04/05/2022CompleteALL VOLTS ELECTRICAL INCGeneral Wiring
08/27/2021CompleteCHARAN ELEC'L ENTERP'S IN—
03/04/2021CompleteABM ELECTRIC, INC—
09/26/2019Permit IssuedSTABILITY ELEC ENTERP INCGeneral Wiring
12/16/2018CompleteLASER ELEC'L CONSTR'G INCGeneral Wiring
04/13/2018CompleteA & S ELECTRIC INC.—
1 project · most recent 11/20/2025
FiledStatusContractorScope
11/20/2025——2 scope_items
3 projects · most recent 06/05/2026
Fence Sidewalk Shed
FiledStatusContractorScope
06/05/2026Permit IssuedCREAMER ENVIRONMENTAL INCFence
11/20/2025Permit IssuedOM GENERAL CONTRACTORS COFence
10/11/2022Permit IssuedROCON CORPFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/06/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/27/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/06/2022Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
02/25/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
09/16/2025Excavations - Sheeting, Shoring, and Bracing—special
10/11/2022Post-installed AnchorsNoel Tolentinospecial
10/11/2022HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
10/11/2022Chimneys and ventsNoel Tolentinospecial
10/09/2022FinalMichael Marcheseprogress
10/09/2022Mechanical SystemsNoel Tolentinospecial
08/19/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsNoel Tolentinospecial
05/05/2021Subgrade InspectionsNELSON LOPEZspecial
05/05/2021Subsurface Investigations (Borings/Test Pits)GARY MARCUSspecial
05/05/2021FinalWENDY HOprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
El Hajj Malik El ShabazzEducation—
Project B01410826 Alteration · Permit Entire · 06/05/2026
P.S. 262Education—
Project B01288440 Alteration · Approved · 11/20/2025
P.s.262k-brooklynEducation—
Project B01278315 Alteration · Permit Entire · 11/20/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/01/2026B00516878-I1Request digital key ↗
09/01/2026B00516868-I1Request digital key ↗
08/31/2026B00621892-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit10
09/01/2026B00516878-I1Open ↗
09/01/2026B00516868-I1Open ↗
08/13/2026B00793896-S2Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/07/2022321802803Open ↗
10/03/2019321802803Open ↗
07/13/2018321802803Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
04/29/2019321802803Open ↗
09/27/2013320900236Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/18/2019321802803Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026B00516878-I1Open ↗
09/01/2026B00516868-I1Open ↗
08/31/2026B00621892-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00793896-S1Open ↗
09/01/2026B00516868-I1Open ↗
09/01/2026B00516868-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/13/2018321802803Open ↗
09/27/2013320900236Open ↗
08/30/2013320900236Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00516868-I1Open ↗
08/26/2026B00793896-S2Open ↗
08/26/2026B00793896-S2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/30/2013320900236Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/30/2013320900236Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/03/2019321802803Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026B00793896-I1Open ↗
08/13/2026B01278315-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B00793896-S1Open ↗
08/25/2026B01020411-P4Open ↗
08/25/2026B01020411-P3Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/13/2018321802803Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/13/2018321802803Open ↗
09/27/2013320900236Open ↗
08/30/2013320900236Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Plot Diagram1
09/01/2026B00516868-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
09/01/2026B00516868-I1Open ↗
▸DOB NOWSOIL REPORT1
09/01/2026B00516868-I1Open ↗
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/01/2026B00516878-I1Open ↗
09/01/2026B00516868-I1Open ↗
08/31/2026B00621892-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
09/01/2026B00516878-I1Open ↗
09/01/2026B00516868-I1Open ↗
08/15/2026B01410826-I1Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/27/2013320900236Open ↗
09/27/2013320900236Open ↗
08/30/2013320900236Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
09/01/2026B00516868-I1Open ↗
08/13/2026B01020411-I1Open ↗
08/13/2026B01020411-S1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/30/2013320900236Open ↗
▸BISLANDMARKS SIGNOFF1
01/30/2023321802803Open ↗
▸BISLANDMARKS APPROVAL1
11/07/2018321802803Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/19/2022321802803Open ↗
07/13/2018321802803Open ↗
08/30/2013320900236Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/13/2018321802803Open ↗
08/30/2013320900236Open ↗
▸Other Documents18
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal13
08/15/2026B01410826-I1Open ↗
08/13/2026B01020411-P1Open ↗
08/13/2026B01020411-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026B01020411-I1Open ↗
08/13/2026B01020411-P3Open ↗
08/13/2026B01020411-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01288440-I1Open ↗