← Back
Elevator cooperative
Boulevard Gardens
54-17 31 AVENUE · BIN 4431251
💬 Discuss this project
1935Year Built
6Stories
D4Building Class
R5Zoning
743,160 sfGross Floor Area
970Units
LL97 CoveredRent Stabilized209 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: BOULEVARD GARDENS OWNERS CORPORATION CO DOUGLAS ELLIMAN PROPERTY MANAG · 511,000 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOULEVARD GARDENS OWNERS CORP.3107/08/2026
LEMX607/08/2026
BOULEVARD GARDENS203/22/2026
BOULEVARD GDNS OWNERS103/22/2026
BLVD GARDENS C O INSIGNIA RESIDE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
POLY ENGINEER PC206/01/2023
MERRITT ENGINEERING CONSULTANTS, DPC212/20/2022
ENTHINK ENGINEERS LLC205/03/2022
ASPEN DESIGNS108/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC403/21/2026
SM DESIGN CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TEXTURES RENOVATIONS LLCGeneral Contractor603/21/2026
LEMX CORPGeneral Contractor507/08/2026
MUALLIUMS, SULAYMANElectrical103/21/2026
SQUILLANTE, AElectrical103/21/2026
MARIO PYNEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008206/01/2023
MERRITT ENGINEERING CONSU460212/20/2022
ASPEN DESIGNS2974108/26/2021
Building Lifecycle
All (116)Filed (7)Permit Issued (6)Signed Off (3)Facade (FISP) (12)Violation (58)Inspection (3)Objection (8)Special Inspection (19)
08/16/2024
Violation issued (ECB, closed)
Construction
06/13/2024
Violation issued (HPD, closed)
C
10/18/2023
Signed off — Alteration
Proposed interior renovation and combine 2 adjacent apartments 4K and 4J as shown on plans. No changes in use, egress or occupancy.
Q00565731-I1
06/20/2023
Cycle 9 facade report submitted
06/20/2023
Cycle 9 facade report signed — SAFE
06/20/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/13/2023
Cycle 9 facade inspection completed
06/01/2023
Filed — Alteration
Proposed interior renovation and combine 2 adjacent apartments 4K and 4J as shown on plans. No changes in use, egress or occupancy.
Q00565731-P1
05/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
05/30/2023
Special inspection requirement — Lighting controls
De Gao
05/30/2023
Special inspection requirement — Lighting in dwelling units
De Gao
05/30/2023
Special inspection requirement — Fenestration areas
De Gao
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
05/30/2023
Special inspection requirement — Masonry
GLEN LANGER
05/30/2023
Special inspection requirement — Sprayed fire-resistant materials
GLEN LANGER
05/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
05/30/2023
Special inspection requirement — Structural Steel - Details
GLEN LANGER
05/30/2023
Special inspection requirement — Structural Steel - High Strength Bolting
GLEN LANGER
05/30/2023
Special inspection requirement — Structural Steel - Welding
GLEN LANGER
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
05/30/2023
Special inspection requirement — Final
GLEN LANGER
05/24/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/10/2023
Signed off — Alteration
LINTEL REPLACEMENT, BRICK REPLACEMENT, MORTAR RE-POINTING, REPLACE WINDOW SHUTTER, PARAPET REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00466983-I1
04/04/2023
Permit issued — General Construction
Q00565731-I1-GC-CX
03/20/2023
Permit issued — General Construction
Q00466983-I1-GC
12/20/2022
Filed — Alteration
LINTEL REPLACEMENT, BRICK REPLACEMENT, MORTAR RE-POINTING, REPLACE WINDOW SHUTTER, PARAPET REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00466983-P1
12/13/2022
Special inspection requirement — Masonry
Christopher Krepcio
12/13/2022
Special inspection requirement — Final
Christopher Krepcio
12/13/2022
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
12/13/2022
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
09/28/2022
Violation issued (HPD, open)
A
05/06/2022
Signed off — Alteration
Q00563244-I1
05/03/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00705837-P1
04/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/29/2022
Permit issued — Sidewalk Shed
Q00705837-I1-SH
03/25/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00705837-I1
03/24/2022
Permit issued — Structural
Q00565731-I1-GC-CX
03/15/2022
Permit issued — General Construction
Q00466983-I1-GC
02/25/2022
Permit issued — General Construction
Q00563244-I1-GC
11/19/2021
Filed — Alteration
Proposed interior renovation and combine 2 adjacent apartments 4K and 4J as shown on plans. No changes in use, egress or occupancy.
Q00565731-I1
08/26/2021
Filed — Alteration
Q00563244-I1
08/19/2021
Objection raised — Other
08/19/2021
Objection resolved — Addressed
07/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andrew Sayers
07/22/2021
Special inspection requirement — Final
Andrew Sayers
06/30/2021
Objection raised — Scope
06/30/2021
Objection resolved — Addressed
06/30/2021
Objection raised — Inspections
06/30/2021
Objection resolved — Addressed
06/30/2021
Objection raised — Structural
06/30/2021
Objection resolved — Addressed
06/15/2021
Filed — Alteration
LINTEL REPLACEMENT, BRICK REPLACEMENT, MORTAR RE-POINTING, REPLACE WINDOW SHUTTER, PARAPET REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00466983-I1
06/09/2021
Violation issued (ECB, closed)
Elevators
03/05/2020
Violation issued (ECB, closed)
Construction
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/24/2018
Cycle 8 facade report submitted
10/21/2018
Cycle 8 facade report signed — SWARMP
10/11/2018
Cycle 8 facade inspection completed
03/03/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/03/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTEXTURES RENOVATIONS LLC04/04/2023
DOB NOWGeneral ConstructionSigned-offLEMX CORP03/20/2023
DOB NOWSidewalk ShedPermit IssuedLEMX CORP03/29/2022
DOB NOWStructuralSigned-offTEXTURES RENOVATIONS LLC03/24/2022
DOB NOWGeneral ConstructionSigned-offLEMX CORP03/15/2022
DOB NOWGeneral ConstructionSigned-offMARIO PYNE02/25/2022
BISEQISSUEDROMEL CONSTRUCTION CORP09/17/2015
BISOTISSUEDROMEL CONSTRUCTION CORP09/17/2015
BISOTISSUEDROMEL CONSTRUCTION CORP01/24/2007
BISFSISSUEDCHAMPION COMBUSTION CORP02/25/2005
BISPLISSUEDMETRO INCORPORATED01/07/2002
BISFSISSUEDJACK PICCINI, INC11/05/2001
11 projects · most recent 04/03/2025
General Wiring
FiledStatusContractorScope
04/03/2025CompleteVALENTIS ELECTRIC, INC.General Wiring
10/01/2023CompleteALL BORO ELECTRIC CORPGeneral Wiring
03/06/2023Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
03/29/2022CompleteELPO ELECTRICAL CONTG INC—
03/23/2022CompleteVALENTIS ELECTRIC, INC.General Wiring
05/03/2021CompleteVALENTIS ELECTRIC, INC.General Wiring
10/27/2020CompleteVALENTIS ELECTRIC, INC.General Wiring
09/24/2020Permit IssuedCOPPOLA & SON ELECTRIC, I1 meters
09/15/2020CompleteELPO ELECTRICAL CONTG INC—
08/24/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
06/22/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
1 project · most recent 05/03/2022
Sidewalk Shed
FiledStatusContractorScope
05/03/2022Permit IssuedLEMX CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/20/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/24/2023Fail-Final General Construction Non-Directive 14FailView ↗
04/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/30/2023Fire-Resistance Rated ConstructionGLEN LANGERprogress
05/30/2023Lighting controlsDe Gaoenergy_progress
05/30/2023Lighting in dwelling unitsDe Gaoenergy_progress
05/30/2023Fenestration areasDe Gaoenergy_progress
05/30/2023Fire-Resistant Penetrations and JointsGLEN LANGERspecial
05/30/2023MasonryGLEN LANGERspecial
05/30/2023Sprayed fire-resistant materialsGLEN LANGERspecial
05/30/2023Structural Stability – Alterations of existing buildingsGLEN LANGERspecial
05/30/2023Structural Steel - DetailsGLEN LANGERspecial
05/30/2023Structural Steel - High Strength BoltingGLEN LANGERspecial
05/30/2023Structural Steel - WeldingGLEN LANGERspecial
05/30/2023Energy Code Compliance InspectionsGLEN LANGERprogress
05/30/2023FinalGLEN LANGERprogress
12/13/2022MasonryChristopher Krepciospecial
12/13/2022FinalChristopher Krepcioprogress
12/13/2022Fenestration air leakageChristopher Krepcioenergy_progress
12/13/2022Air barrier - visual inspectionChristopher Krepcioenergy_progress
07/22/2021Fire-Resistant Penetrations and JointsAndrew Sayersspecial
07/22/2021FinalAndrew Sayersprogress
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/27/2026Q00563244-I1Request digital key ↗
08/26/2026Q00705837-P1Request digital key ↗
08/26/2026Q00705837-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00466983-P1Request digital key ↗
08/15/2026Q00466983-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
09/24/2015421010300Open ↗
09/24/2015421163680Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/11/2015421163680Open ↗
12/04/2014421010300Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00466983-P1Open ↗
09/01/2026Q00466983-P1Open ↗
09/01/2026Q00466983-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00466983-I1Open ↗
08/26/2026Q00705837-I1Open ↗
08/26/2026Q00705837-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/21/2016421010300Open ↗
05/16/2016421163680Open ↗
09/24/2015421163680Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00466983-P1Open ↗
08/24/2026Q00563244-I1Open ↗
08/23/2026Q00565731-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/11/2015421163680Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/11/2015421163680Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026Q00466983-I1Open ↗
08/13/2026Q00563244-I1Open ↗
08/13/2026Q00466983-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/21/2015421010300Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/11/2015421163680Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026Q00565731-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/21/2016421010300Open ↗
12/04/2014421010300Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00565731-I1Open ↗
08/13/2026Q00466983-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/21/2016421010300Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/21/2016421010300Open ↗
05/16/2016421163680Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/11/2015421163680Open ↗
12/04/2014421010300Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/16/2016421163680Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/21/2016421010300Open ↗
12/04/2014421010300Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
06/11/2015421163680Open ↗
12/04/2014421010300Open ↗
▸BISADDITIONAL INFORMATION1
12/04/2014421010300Open ↗