| Owner | Filings | Most Recent |
|---|---|---|
| ST.JOHN THE BAPTIST OF CHINA INC | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ANDREW ROBERT LEVENBAUM P.E. | 3 | 07/29/2025 |
| THOMAS C. TUNG, P.E. | 5 | 06/23/2025 |
| NELSON AND POPE | 3 | 06/20/2025 |
| HOWARD I SHAPIRO & ASSOCIATES | 4 | 05/08/2025 |
| JAMES L. ROBINSON, RA | 6 | 05/26/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| HOWARD I SHAPIRO ASSOCIATES | 8 | 03/21/2026 |
| SUN | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| C.M. TESTING LABORATORY, | 1352 | 2 | 05/08/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/29/2025 | — | — | Heating and Air Conditioning Systems | Heat / Cool Lg ZRNU073SJS4 254 CFM · Vrf Outdoor ×5 ZRNU243SKS4 537 CFM · Vrf Outdoor ×4 ZRUM096BTE6 8 tons · Vrf Outdoor ×4 ZRNU053SJS4 240 CFM · Vrf Indoor ×3 ZRNU183SKS4 494 CFM · Vrf Indoor ×3 ZRNU093SJS4 276 CFM · Vrf Indoor ×2 RNU123SJS4 300 CFM · Vrf Indoor ×1 ZRNU093MAA4 354 CFM · Vrf Indoor ×1 ZRUM072BTE6 8 tons · Vrf Outdoor ×1 |
| 05/26/2022 | — | — | Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2021 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2025 | Permit Issued | TRIANGLE ELECTRIC INC. | 3 meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2025 | — | — | Steel, Concrete, Masonry |
| 06/10/2022 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/15/2022 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/19/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 06/19/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/19/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/19/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/19/2025 | Maintenance information | — | energy_progress |
| 06/19/2025 | Shutoff dampers | — | energy_progress |
| 06/19/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 06/19/2025 | Heating Systems | — | special |
| 06/19/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 06/06/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/05/2025 | Masonry | — | special |
| 06/03/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 06/03/2025 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 06/03/2025 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 06/03/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 06/03/2025 | Concrete - Cast-In-Place | — | special |
| 06/03/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/03/2025 | Structural Cold-Formed Steel | — | special |
| 06/03/2025 | Concrete - Cast-In-Place | — | special |
| 06/03/2025 | Sprayed fire-resistant materials | — | special |
| 06/03/2025 | Structural Steel - Details | — | special |
| 06/03/2025 | Structural Steel - High Strength Bolting | — | special |
| 06/03/2025 | Structural Steel - Welding | — | special |
| 05/14/2025 | Final | — | progress |
| 05/14/2025 | Mechanical Systems | — | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| The Roman Catholic | John The Baptist Of China, Inc | Residential | — | Project Q00451143 |