← Back
BuildNYC
Elevator apt, fireproof without stores
Arverne View
54-22 BEACH CHANNEL DRIVE · BIN 4436451
💬 Discuss this project
1960Year Built
9Stories
D3Building Class
R4Zoning
820,910 sfGross Floor Area
813Units
LL97 CoveredRent Stabilized83 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Ocean Bay Rad · 916,193 sf lot · 0.9 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofOcean Bay Rad LLC1 filing · 7 docs
Floor 1Heavy duty sidewalk shed installation10p · 1 filing · 6 docs
Site & exteriorOcean Bay Rad LLC9p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority3903/21/2026
Ocean Bay Rad1007/08/2026
NYC Housining Authority103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Frame Design Corps106/24/2024
Syed Engineering207/01/2022
V. Shames, P.E110/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting203/21/2026
SKY Management Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yarks NYCScaffold607/08/2026
SNS OrgnizationGeneral Contractor303/21/2026
View 360 ConstructionGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519106/24/2024
Frame Design and Construction7971106/24/2024
PSI Agency254110/22/2019
Building Lifecycle
All (104)Filed (4)Permit Issued (9)Signed Off (3)Facade (FISP) (20)Violation (60)Special Inspection (8)
03/28/2026
Violation issued (HPD, closed)
B
03/28/2026
Violation issued (HPD, closed)
C
03/28/2026
Violation issued (HPD, closed)
C
03/28/2026
Violation issued (HPD, closed)
C
03/26/2026
Violation issued (HPD, closed)
C
03/10/2026
Violation issued (HPD, closed)
C
03/10/2026
Violation issued (HPD, closed)
C
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, closed)
C
03/10/2026
Violation issued (HPD, closed)
C
03/10/2026
Violation issued (HPD, closed)
B
03/10/2026
Violation issued (HPD, closed)
B
02/26/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00726426-I1
02/07/2026
Violation issued (HPD, closed)
C
02/07/2026
Violation issued (HPD, closed)
B
01/14/2026
Violation issued (HPD, closed)
A
01/14/2026
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, closed)
B
12/05/2025
Violation issued (HPD, closed)
B
12/05/2025
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
C
08/05/2025
Permit issued — Sidewalk Shed
Q00726426-I1-SH
07/16/2025
Cycle 9 facade report submitted
07/09/2025
Signed off — Alteration
Exterior facade repair, waterproofing, brick replacement, lintel repair
Q01066417-I1
07/08/2025
Cycle 9 facade inspection completed
05/19/2025
Cycle 9 facade report signed — SAFE
01/16/2025
Permit issued — General Construction
Q01066417-I1-GC
01/15/2025
Violation issued (HPD, closed)
A
12/13/2024
Violation issued (HPD, closed)
C
12/13/2024
Violation issued (HPD, closed)
C
11/22/2024
Permit issued — General Construction
Q01066417-I1-GC
11/16/2024
Violation issued (HPD, closed)
C
11/16/2024
Violation issued (HPD, closed)
B
11/16/2024
Violation issued (HPD, closed)
B
11/16/2024
Violation issued (HPD, closed)
C
06/24/2024
Filed — Alteration
Exterior facade repair, waterproofing, brick replacement, lintel repair
Q01066417-I1
06/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SURESH WARREN
06/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
06/20/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SURESH WARREN
06/20/2024
Special inspection requirement — Masonry
SURESH WARREN
06/20/2024
Special inspection requirement — Post-installed Anchors
SURESH WARREN
06/13/2024
Special inspection requirement — Final
SURESH WARREN
04/18/2024
Permit issued — Sidewalk Shed
Q00726426-I1-SH
03/04/2024
Permit issued — Sidewalk Shed
Q00726426-I1-SH
07/27/2023
Cycle 9 facade report submitted
07/27/2023
Cycle 9 facade report signed — UNSAFE
07/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/14/2023
Cycle 9 facade inspection completed
02/21/2023
Permit issued — Sidewalk Shed
Q00726426-I1-SH
02/15/2023
Permit issued — Sidewalk Shed
Q00726426-I1-SH
10/17/2022
Violation issued (ECB, closed)
Construction
07/01/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00726426-P1
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offYarks NYC08/05/2025
DOB NOWGeneral ConstructionSigned-offView 360 Construction01/16/2025
DOB NOWGeneral ConstructionSigned-offView 360 Construction11/22/2024
DOB NOWSidewalk ShedSigned-offYarks NYC04/18/2024
DOB NOWSidewalk ShedSigned-offYarks NYC03/04/2024
DOB NOWSidewalk ShedSigned-offYarks NYC02/21/2023
DOB NOWSidewalk ShedSigned-offYarks NYC02/15/2023
DOB NOWSidewalk ShedSigned-offYarks NYC04/28/2022
DOB NOWMechanical SystemsSigned-offSNS Orgnization11/08/2019
BISMHISSUEDSNS Orgnization03/08/2019
BISMHISSUEDArc Electrical & Mechanical Con03/07/2019
BISOTISSUEDAmb Construction02/14/2019
BISOTISSUEDSNS Orgnization07/18/2018
BISOTISSUEDSNS Orgnization05/18/2018
BISBLISSUEDStuart N Schwartz05/17/2018
BISPLISSUEDEagle 1 Mechanical04/06/2018
BISOTISSUEDBright Power Installation03/01/2018
BISOTISSUEDMDG Design & Construction02/09/2018
BISMHISSUEDArc Electrical & Mechanical Con01/25/2018
BISEQISSUEDAmb Construction01/17/2018
BISPLISSUEDHay Mechanical Solutions12/27/2017
BISOTISSUEDAmb Construction12/20/2017
BISPLISSUEDTradeline Plumbing11/27/2017
BISMHISSUEDArc Electrical & Mechanical Con07/18/2017
BISOTISSUEDSNS Orgnization07/10/2017
BISBLISSUEDStuart N Schwartz05/05/2017
BISOTISSUEDMDG Design & Construction02/01/2017
BISOTISSUEDMDG Design & Construction02/01/2017
BISOTISSUEDMDG Design & Construction12/21/2016
BISOTISSUEDMDG Design & Construction12/20/2016
BISEQISSUEDAmb Construction12/19/2016
BIS—ISSUEDMDG Design & Construction12/16/2016
BISBLISSUEDStuart N Schwartz12/01/2016
BISPLISSUEDTradeline Plumbing12/01/2016
BISEQISSUEDSkyworx Contracting05/06/2016
BISEQISSUEDZoria Housing03/29/2013
BISEQISSUEDZoria Housing03/29/2013
BISOTISSUEDZoria Housing12/20/2012
BISEQISSUEDZoria Housing11/20/2012
BISEQISSUEDZoria Housing11/20/2012
+ 19 more permits on file
3 projects · most recent 10/17/2019
Lighting
FiledStatusContractorScope
10/17/2019CompleteKLK ElectricLighting
05/29/2018CompleteModern Trend Electrical Contracting—
12/13/2017CompleteKLK ElectricLighting
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/20/2024Structural Stability – Alterations of existing buildingsSURESH WARRENspecial
06/20/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
06/20/2024Exterior Insulation and Finish Systems (EIFS)SURESH WARRENspecial
06/20/2024MasonrySURESH WARRENspecial
06/20/2024Post-installed AnchorsSURESH WARRENspecial
06/13/2024FinalSURESH WARRENprogress
10/08/2019FinalVALERY SHAMESprogress
10/08/2019Mechanical SystemsMAURICIO ANDRADEspecial
▾Documents — 358 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/26/2026Q00726426-I1Request digital key ↗
08/26/2026Q00726426-P1Request digital key ↗
08/22/2026Q01066417-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00242303-I1Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION37
04/24/2020400480001Open ↗
01/31/2020421382569Open ↗
06/01/2019440352529Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION26
03/12/2019440352529Open ↗
03/08/2019440529732Open ↗
02/15/2019440349099Open ↗
Showing 3 of 26 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
03/19/2019440349099Open ↗
02/06/2019440369389Open ↗
04/25/2017440307204Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1132
04/24/2020400480001Open ↗
04/24/2020400480001Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION1
12/19/2016440369389Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
04/24/2020400480001Open ↗
▸BISVERIFY TAX LOT1
06/09/2020421382569Open ↗
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
07/22/2019440352529Open ↗
04/04/2019440529732Open ↗
03/19/2019440349099Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
04/04/2017440307204Open ↗
03/28/2017440307204Open ↗
12/21/2016421393307Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/17/2019440529732Open ↗
03/28/2017440307204Open ↗
12/11/2016440369389Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)4
04/04/2017440307204Open ↗
12/21/2016421393307Open ↗
12/21/2016421393307Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00726426-I1Open ↗
08/22/2026Q01066417-I1Open ↗
08/13/2026Q00242303-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026Q00242303-I1Open ↗
08/22/2026Q01066417-I1Open ↗
08/22/2026Q01066417-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/17/2019440529732Open ↗
12/11/2016440369389Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
05/19/2017440395261Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/17/2019440529732Open ↗
12/11/2016440369389Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q00242303-I1Open ↗
08/22/2026Q01066417-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/08/2018421397731Open ↗
02/01/2018421382729Open ↗
01/29/2018421382729Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
12/12/2016440352529Open ↗
12/07/2016440352529Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes10
04/04/2017440307204Open ↗
03/28/2017440307204Open ↗
12/21/2016421393307Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026Q00242303-I1Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
06/20/2019440352529Open ↗
06/13/2017440395261Open ↗
12/21/2016421393307Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
12/20/2017440349099Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/19/2019440349099Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/22/2026Q01066417-I1Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
04/04/2019440529732Open ↗
03/19/2019440349099Open ↗
03/19/2019440349099Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
03/08/2019440529732Open ↗
01/17/2019440529732Open ↗
05/19/2017440395261Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/22/2019440352529Open ↗
04/04/2019440529732Open ↗
03/19/2019440349099Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/17/2019440529732Open ↗
▸BISNYCECC ANALYSIS1
01/17/2019440529732Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/08/2019440529732Open ↗
01/17/2019440529732Open ↗
05/19/2017440395261Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
06/11/2020421382569Open ↗
02/20/2020421382569Open ↗
02/10/2020421382569Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
04/24/2020400480001Open ↗
04/24/2020400480001Open ↗
04/24/2020400480001Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/21/2018421382569Open ↗
12/13/2018421382569Open ↗
12/16/2016421382569Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/26/2026Q00726426-I1Open ↗
08/13/2026Q00242303-I1Open ↗
08/13/2026Q00726426-P1Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026Q01066417-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026Q00242303-I1Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT24
07/22/2019440352529Open ↗
04/04/2019440529732Open ↗
03/19/2019440349099Open ↗
Showing 3 of 24 on file for this type
▸Filing & Intake Forms47
▸BISADDITIONAL INFORMATION24
06/20/2019440352529Open ↗
05/14/2019440352529Open ↗
03/06/2019440395261Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET10
12/21/2016421393307Open ↗
Showing 1 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
04/04/2019421382729Open ↗
04/04/2019421382729Open ↗
12/13/2018421382569Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
01/17/2019440529732Open ↗
05/19/2017440395261Open ↗
12/11/2016440369389Open ↗
Showing 3 of 6 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
01/31/2020421382569Open ↗
12/19/2016421382569Open ↗