Two family brick
54-27 82 STREET
QUEENS · Elmhurst · BIN 4066200
💬 Discuss this project
2024Year Built
3Stories
B1Building Class
R4Zoning
2,589 sfGross Floor Area
2Units
0 Open Violations
Two family brick · 2,500 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction12p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHUN XING CAPITAL IMPT4207/08/2026
L&L CONSTRUCTION DEVELOP103/22/2026
LXC CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ARCHITECT P.C908/22/2025
JUST CONSULTING ENGINEERING410/03/2024
ZHENG & ASSOCIATES LLC109/16/2024
A & T ENGINEERING, P.C.112/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHANG HWA TAN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor804/09/2026
LXC CONSTRUCTION INCGeneral Contractor507/08/2026
HF GROUP PLMBG & SPNKLERFire Protection107/08/2026
YAFE MEOD CORPGeneral Contractor104/09/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUST CONSULTING ENGINEERI58651108/22/2025
Building Lifecycle
All (127)Filed (15)Permit Issued (11)Signed Off (8)Violation (2)Inspection (13)Objection (48)Special Inspection (30)
06/23/2026
Signed off — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-S2
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2026
Signed off — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-S5
03/25/2026
Signed off — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-S3
03/25/2026
Signed off — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-S4
02/19/2026
Signed off — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-S6
02/19/2026
Signed off — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-S7
02/19/2026
Signed off — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-S1
01/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/18/2025
Permit issued — Curb Cut
Q00841424-S6-CC
11/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/30/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/23/2025
Objection resolved — Addressed
09/23/2025
Special inspection requirement — Fenestration areas
XIAOJUN WANG
09/23/2025
Special inspection requirement — Interior lighting power
XIAOJUN WANG
09/23/2025
Special inspection requirement — Permanent certificate
XIAOJUN WANG
09/23/2025
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
09/23/2025
Special inspection requirement — Electric vehicle service equipment requirements
XIAOJUN WANG
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
09/23/2025
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
09/23/2025
Special inspection requirement — Metering
XIAOJUN WANG
09/23/2025
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
09/23/2025
Special inspection requirement — Maintenance information
XIAOJUN WANG
09/23/2025
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
09/23/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOJUN WANG
09/23/2025
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
09/23/2025
Special inspection requirement — Subgrade Inspections
XIAOJUN WANG
09/23/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOJUN WANG
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
09/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
09/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOJUN WANG
09/22/2025
Special inspection requirement — Maintenance information
XIAOJUN WANG
09/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOJUN WANG
09/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOJUN WANG
09/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOJUN WANG
09/22/2025
Special inspection requirement — Permanent certificate
XIAOJUN WANG
09/22/2025
Special inspection requirement — Metering
XIAOJUN WANG
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
09/16/2025
Objection raised — Zoning
09/16/2025
Objection resolved — Addressed
09/16/2025
Objection raised — Scope
09/16/2025
Objection raised — Scope
09/16/2025
Objection resolved — Addressed
09/09/2025
Permit issued — General Construction
Q00841424-I1-GC
08/22/2025
Filed — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-P7
08/22/2025
Filed — New Building
FILE PLUMBING PERMIT- OPEN SPACE IN ACCORDANCE WITH APPROVED SD1+2 (HCQ-875/23-1) REQUIRED BY THE DOB PLUMBING CHIEF.
Q00841424-P6
08/19/2025
Special inspection requirement — Interior lighting power
XIAOJUN WANG
08/19/2025
Special inspection requirement — Metering
XIAOJUN WANG
08/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOJUN WANG
08/19/2025
Special inspection requirement — Maintenance information
XIAOJUN WANG
08/19/2025
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
06/25/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
06/11/2025
Permit issued — Plumbing
Q00841424-S7-PL
03/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offYAFE MEOD CORP12/18/2025
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP09/09/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC06/11/2025
DOB NOWSprinklersSigned-offHF GROUP PLMBG & SPNKLER02/13/2025
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP02/13/2025
DOB NOWStructuralSigned-offL&L CONSTRUCTION DEVELOP11/14/2024
DOB NOWConstruction FencePermit IssuedL&L CONSTRUCTION DEVELOP09/19/2024
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP09/06/2024
DOB NOWSupport of ExcavationSigned-offLXC CONSTRUCTION INC08/08/2024
DOB NOWEarth WorkSigned-offLXC CONSTRUCTION INC08/08/2024
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC12/28/2023
BIS—ISSUEDLXC CONSTRUCTION INC06/20/2024
1 project · most recent 08/22/2025
Sprinkler System
FiledStatusContractorScope
08/22/2025Signed-offHF GROUP PLMBG & SPNKLERSprinkler System
1 project · most recent 08/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/22/2025Signed-offTRI STATE PLBG & HTG INCGas, Storm, Water/Sanitary
1 project · most recent 03/04/2025
General Wiring
FiledStatusContractorScope
03/04/2025CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 08/22/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/22/2025Signed-offYAFE MEOD CORPSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/30/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2025Pass-Final House ConnectionPassView ↗
03/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
09/23/2025Air barrier - visual inspectionXIAOJUN WANGenergy_progress
09/23/2025MeteringXIAOJUN WANGenergy_progress
09/23/2025Permanent certificateXIAOJUN WANGenergy_progress
09/23/2025Fenestration air leakageXIAOJUN WANGenergy_progress
09/23/2025Air barrier — testing XIAOJUN WANGenergy_progress
09/23/2025Electric vehicle service equipment requirementsXIAOJUN WANGenergy_progress
09/23/2025Maintenance informationXIAOJUN WANGenergy_progress
09/23/2025Insulation placement and R valuesXIAOJUN WANGenergy_progress
09/23/2025Fenestration areasXIAOJUN WANGenergy_progress
09/23/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
09/23/2025Excavations - Sheeting, Shoring, and BracingXIAOJUN WANGspecial
09/23/2025Subgrade InspectionsXIAOJUN WANGspecial
09/23/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOJUN WANGspecial
09/23/2025Energy Code Compliance InspectionsXIAOJUN WANGprogress
09/23/2025Protection of exposed foundation insulationXIAOJUN WANGenergy_progress
09/23/2025Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
09/23/2025Interior lighting powerXIAOJUN WANGenergy_progress
09/22/2025HVAC-R and service water piping design and insulationXIAOJUN WANGenergy_progress
09/22/2025HVAC-R and service water heating equipmentXIAOJUN WANGenergy_progress
09/22/2025Permanent certificateXIAOJUN WANGenergy_progress
09/22/2025HVAC-R and service water heating system controlsXIAOJUN WANGenergy_progress
09/22/2025MeteringXIAOJUN WANGenergy_progress
09/22/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
09/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOJUN WANGspecial
09/22/2025Maintenance informationXIAOJUN WANGenergy_progress
Latest 25 of 72.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/23/2026Q00817237-I1Request digital key ↗
08/21/2026Q01111518-I1Request digital key ↗
08/21/2026Q00841424-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/09/2026440780905Open ↗
05/01/2023421814825Open ↗
▸BISWORK PERMIT APPLICATION1
06/10/2025421814825Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00841424-P4Open ↗
08/13/2026Q00841424-P7Open ↗
08/13/2026Q00841424-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00841424-I1Open ↗
08/13/2026Q00841424-P7Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00841424-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/23/2026Q00817237-I1Open ↗
08/21/2026Q01111518-I1Open ↗
08/21/2026Q00841424-S5Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00841424-P7Open ↗
09/01/2026Q00841424-P7Open ↗
08/31/2026Q00841424-P6Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00841424-P7Open ↗
09/01/2026Q00841424-S1Open ↗
08/31/2026Q00841424-P6Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/29/2023440780905Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00841424-I1Open ↗
08/13/2026Q00841424-P4Open ↗
08/13/2026Q00841424-P7Open ↗
▸BISGAS CUT-OFF1
12/01/2025421814825Open ↗
▸BISELECTRIC CUT-OFF1
12/01/2025421814825Open ↗
▸BISSEWER CUT-OFF1
12/01/2025421814825Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00841424-P4Open ↗
08/13/2026Q00841424-P7Open ↗
08/13/2026Q00841424-I1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/01/2025421814825Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/01/2025421814825Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/01/2025421814825Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00841424-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00841424-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00841424-I1Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
12/01/2025421814825Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/01/2025421814825Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/21/2026Q00841424-S2Open ↗
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q00841424-S5Open ↗
08/13/2026Q00841424-S3Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/01/2025421814825Open ↗
12/01/2025421814825Open ↗
12/01/2025421814825Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/06/2025421814825Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
05/01/2023421814825Open ↗
▸BISEFILING COVER SHEET1
05/01/2023421814825Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/13/2026Q00841424-I1Open ↗
08/13/2026Q00841424-P4Open ↗
08/13/2026Q00841424-P7Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00841424-P4Open ↗
08/13/2026Q00841424-P7Open ↗
08/13/2026Q00841424-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q00841424-P7Open ↗
08/21/2026Q00841424-P4Open ↗
08/14/2026Q00841424-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00841424-S3Open ↗
08/13/2026Q00841424-S5Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00841424-I1Open ↗