← Back
Two family converted from one family
54-36 82 STREET
QUEENS · BIN 4066246
💬 Discuss this project
1930Year Built
3Stories
B3Building Class
R4Zoning
3,495 sfGross Floor Area
2Units
3 Open Violations 0 unresolved · 3 paperwork only ▸
Two family converted from one family · 4,675 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivilGeneral
Roof3p · 1 filing · 9 docs
Floor 26p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Basement18p · 4 filings · 20 docs
3 jobs · most recent 05/20/2024
General Wiring
FiledStatusContractorScope
05/20/2024CompleteAMPACITY ELECTRICAL INC—
01/21/2024CompleteBERGER QUALITY ELEC'L CON—
04/21/2023CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
1 job · most recent 12/01/2023
Concrete Wood
FiledStatusContractorScope
12/01/2023Permit IssuedJUAHOL CONSTRUCTION INCConcrete, Wood
Building Lifecycle
All (116)Filed (10)Permit Issued (16)Signed Off (5)Violation (3)Inspection (10)Objection (42)Special Inspection (30)
04/17/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00979442-I1
03/19/2025
Signed off — Alteration
New sprinkler installation for an existing residential building work to add new plumbing fixtures in the basement, first, and second floors in conjunction with ALTERATION CO #Q00689520. There is no change in use, egress, or occupancy.
Q00830391-I1
02/25/2025
Signed off — Alteration
On existing two-story and attic single-family residence, filing this application for miscellaneous interior renovation from the Cellar through the Attic as per plan herewith. No change of use, egress, or occupancy.
Q00606481-I1
02/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/04/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2025
Special inspection requirement — Air barrier - visual inspection
ROBESPIERRE ARISTILDE
01/22/2025
Special inspection requirement — Fenestration areas
ROBESPIERRE ARISTILDE
01/22/2025
Special inspection requirement — Lighting in dwelling units
ROBESPIERRE ARISTILDE
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
01/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBESPIERRE ARISTILDE
01/22/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ROBESPIERRE ARISTILDE
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
01/21/2025
Signed off — Alteration CO
HEREWITH FILING TO CONVERT EXISTING 1-FAMILY RESIDENCE INTO A 2-FAMILY; ALSO, TO INCLUDE HORIZONTAL ENLARGEMENT TO THE BASEMENT, FIRST AND SECOND FLOOR AS PER PLAN HEREWITH. NEW C of O TO BE OBTAINED.
Q00689520-S1
01/21/2025
Filed — Alteration
On existing two-story and attic single-family residence, filing this application for miscellaneous interior renovation from the Cellar through the Attic as per plan herewith. No change of use, egress, or occupancy.
Q00606481-P1
01/21/2025
Special inspection requirement — Fenestration areas
ROBESPIERRE ARISTILDE
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
01/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBESPIERRE ARISTILDE
01/21/2025
Special inspection requirement — Lighting in dwelling units
ROBESPIERRE ARISTILDE
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
01/21/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ROBESPIERRE ARISTILDE
01/21/2025
Special inspection requirement — Air barrier - visual inspection
ROBESPIERRE ARISTILDE
10/24/2024
Signed off — Alteration
MISCELLANEOUS PLUMBING WORK ON EXISTING. TWO-STORY ONE-FAMILY HOUSE AS PER PLAN HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00622417-I1
10/24/2024
Permit issued — General Construction
Q00606481-I1-GC
10/23/2024
Permit issued — Foundation
Q00689520-I1-GC
09/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/02/2024
Special inspection requirement — Concrete - Cast-In-Place
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Structural Cold-Formed Steel
JOMO CHARLES
08/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Interior lighting power
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Insulation placement and R values
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Footing and Foundation
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Fenestration air leakage
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Boss
08/02/2024
Special inspection requirement — Subgrade Inspections
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Fenestration areas
ROBESPIERRE ARISTILDE
08/02/2024
Special inspection requirement — Lighting in dwelling units
ROBESPIERRE ARISTILDE
07/29/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Zoning
07/15/2024
Objection resolved — Addressed
05/09/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
02/23/2024
Permit issued — Solar
Q00979442-I1-SL
02/15/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00979442-I1
12/21/2023
Objection resolved — Addressed
12/19/2023
Objection raised — Structural
12/19/2023
Objection raised — Inspections
12/19/2023
Objection raised — Zoning
12/19/2023
Objection raised — Fire_Protection
12/19/2023
Objection raised — Zoning
12/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 116 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGE ENGINEERING, LLC901/21/2025
TOM PETERSEN ARCHITECT, LLC102/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCOMETRIC DESIGN1803/21/2026
Streekout Solutions103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FREDD & H CONSTRUCION CORGeneral Contractor1907/08/2026
JUAHOL CONSTRUCTION INCGeneral Contractor1107/08/2026
ARANDA PLBG & HTG CORPPlumbing207/08/2026
AMPACITY ELECTRICAL INCElectrical103/22/2026
SURF CLEAN ENERGY INCGeneral Contractor107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AGE ENGINEERING, LLC6695801/21/2025
THOMAS PETERSEN ARCHITECT7854102/15/2024
SCA CODE AND PLANNING, LL6599212/01/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJUAHOL CONSTRUCTION INC10/24/2024
DOB NOWFoundationPermit IssuedJUAHOL CONSTRUCTION INC10/23/2024
DOB NOWSolarSigned-offSURF CLEAN ENERGY INC02/23/2024
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP11/15/2023
DOB NOWSprinklersSigned-offARANDA PLBG & HTG CORP10/17/2023
DOB NOWStructuralPermit IssuedFREDD & H CONSTRUCION COR07/12/2023
DOB NOWFoundationPermit IssuedFREDD & H CONSTRUCION COR07/11/2023
DOB NOWGeneral ConstructionPermit IssuedFREDD & H CONSTRUCION COR06/26/2023
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP06/16/2023
DOB NOWConstruction FenceSigned-offJUAHOL CONSTRUCTION INC05/08/2023
DOB NOWGeneral ConstructionPermit IssuedFREDD & H CONSTRUCION COR05/02/2023
DOB NOWEarth WorkPermit IssuedFREDD & H CONSTRUCION COR05/02/2023
DOB NOWStructuralPermit IssuedFREDD & H CONSTRUCION COR05/02/2023
DOB NOWStructuralPermit IssuedFREDD & H CONSTRUCION COR05/02/2023
DOB NOWGeneral ConstructionSigned-offJUAHOL CONSTRUCTION INC02/06/2023
DOB NOWGeneral ConstructionSigned-offJUAHOL CONSTRUCTION INC11/01/2021
BISCCISSUEDM.B.M GEN CONT INC03/11/1998
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
02/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/04/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
01/22/2025Air barrier - visual inspectionROBESPIERRE ARISTILDEenergy_progress
01/22/2025Exterior Insulation and Finish Systems (EIFS)ROBESPIERRE ARISTILDEspecial
01/22/2025Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
01/22/2025Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
01/22/2025Lighting in dwelling unitsROBESPIERRE ARISTILDEenergy_progress
01/22/2025Fenestration areasROBESPIERRE ARISTILDEenergy_progress
01/22/2025Fenestration and door U-factor and product ratingsROBESPIERRE ARISTILDEenergy_progress
01/21/2025Fenestration areasROBESPIERRE ARISTILDEenergy_progress
01/21/2025Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
01/21/2025Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
01/21/2025Air barrier - visual inspectionROBESPIERRE ARISTILDEenergy_progress
01/21/2025Lighting in dwelling unitsROBESPIERRE ARISTILDEenergy_progress
01/21/2025Fenestration and door U-factor and product ratingsROBESPIERRE ARISTILDEenergy_progress
01/21/2025Exterior Insulation and Finish Systems (EIFS)ROBESPIERRE ARISTILDEspecial
08/02/2024Concrete - Cast-In-PlaceROBESPIERRE ARISTILDEspecial
08/02/2024Structural Cold-Formed SteelJOMO CHARLESspecial
08/02/2024Subsurface Conditions – Fill Placement & In-Place DensityROBESPIERRE ARISTILDEspecial
08/02/2024Subsurface Investigations (Borings/Test Pits)Daniel Bossspecial
08/02/2024Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
08/02/2024Air barrier - visual inspectionROBESPIERRE ARISTILDEenergy_progress
08/02/2024Fenestration and door U-factor and product ratingsROBESPIERRE ARISTILDEenergy_progress
08/02/2024Lighting in dwelling unitsROBESPIERRE ARISTILDEenergy_progress
08/02/2024Interior lighting powerROBESPIERRE ARISTILDEenergy_progress
08/02/2024Fenestration areasROBESPIERRE ARISTILDEenergy_progress
08/02/2024Fenestration air leakageROBESPIERRE ARISTILDEenergy_progress
Latest 25 of 61.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026Q00622417-I1Request digital key ↗
08/25/2026Q00622417-P1Request digital key ↗
08/24/2026Q00830391-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
07/14/2023421817467Open ↗
02/25/2020400832426Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026Q00689520-S1Open ↗
08/13/2026Q00689520-I1Open ↗
08/13/2026Q00689520-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00689520-P1Open ↗
08/13/2026Q00689520-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature15
09/29/2026Q00622417-P1Open ↗
09/23/2026Q00689520-P1Open ↗
09/23/2026Q00830391-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/29/2026Q00622417-P1Open ↗
09/23/2026Q00689520-P1Open ↗
09/02/2026Q00606481-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026Q00622417-P1Open ↗
08/25/2026Q00622417-I1Open ↗
08/24/2026Q00830391-P1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00689520-I1Open ↗
08/13/2026Q00689520-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00689520-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026Q00622417-I1Open ↗
08/25/2026Q00622417-P1Open ↗
08/24/2026Q00830391-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00606481-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00689520-I1Open ↗
08/13/2026Q00689520-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00689520-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/31/2023421817467Open ↗
03/31/2023421817467Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/04/2020400832426Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00979442-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/14/2023421817467Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/15/2026Q00689520-I1Open ↗
08/14/2026Q00689520-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00689520-I1Open ↗
08/13/2026Q00689520-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00689520-I1Open ↗
08/13/2026Q00689520-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00689520-I1Open ↗
08/13/2026Q00689520-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00689520-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00689520-I1Open ↗