← Back
BuildNYC
Elevator cooperative
Valerie Arms
54-40 LITTLE NECK PARKWAY · BIN 4171524
💬 Discuss this project
1962Year Built
6Stories
D4Building Class
R3-2Zoning
240,925 sfGross Floor Area
252Units
LL97 CoveredRent Stabilized140 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Valerie Arms Apartment · 118,124 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofVenture NY Property ManagementUnder Construction20p · 7 filings · 20 docs
Floor 1New natural gas generator and transfer switch installationUnder Construction3p · 2 filings · 14 docs
Site & exteriorMulti-family elevator building telecommunication facilityUnder Construction2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Valeria Arms Apartment2603/22/2026
Charles H. Greethal2011/07/2026
Vision Enterprises703/21/2026
Valerie Arms Apt503/21/2026
Mark Greenberg Real Estate303/21/2026
Clear Wireless103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering510/21/2025
Azimuth Engineering102/14/2023
Grant112/14/2021
Scherer Design Group109/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C P Professional Consulting203/21/2026
Construction Permit Services903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ramapo CommunicationGeneral Contractor607/08/2026
Watch Hill Wireless SolutionsGeneral Contractor603/21/2026
Odyssia Global CommercialGeneral Contractor510/20/2026
Associated Electric Cont of NElectrical403/21/2026
Fast Track Electricspecialty_contractor203/21/2026
Aura PlumbingPlumbing211/07/2026
Caputek Electrical ServicesElectrical203/21/2026
Stellmann ElectricalElectrical103/22/2026
Alom Elect'lElectrical103/21/2026
HV ElectricElectrical103/21/2026
Red Wing Electric of New YorkElectrical103/21/2026
RNH Electric CompanyElectrical103/21/2026
Ronald Testa, JRElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering106310/21/2025
Jeremy K McKeon, P.E.7263102/14/2023
Grant Engineering Consulting3512112/14/2021
Scherer Design Group7921109/22/2020
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 03/30/2026, status Swarmp
10/19/2026
Permit renewed — Mechanical Systems
Renewed with changes
Q00525760-I1-MS
10/14/2026
Permit renewed — Plumbing
Renewed with changes
Q00529002-I1-PL
07/29/2026
Co-op apartment 1O sold for $215,000
05/25/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · open
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedOdyssia Global Commercial10/19/2026
DOB NOWPlumbingPermit IssuedAura Plumbing10/14/2026
DOB NOWAntennaSigned-offRamapo Communication03/22/2023
DOB NOWAntennaSigned-offWatch Hill Wireless Solutions05/13/2022
DOB NOWAntennaSigned-offWatch Hill Wireless Solutions01/04/2022
DOB NOWMechanical SystemsPermit IssuedRamapo Communication10/31/2021
DOB NOWGeneral ConstructionPermit IssuedRamapo Communication10/14/2021
DOB NOWPlumbingPermit IssuedAura Plumbing09/28/2021
DOB NOWGeneral ConstructionPermit IssuedRamapo Communication09/28/2021
DOB NOWAntennaSigned-offOdyssia Global Commercial03/08/2021
DOB NOWAntennaSigned-offOdyssia Global Commercial01/29/2021
DOB NOWAntennaSigned-offFast Track Electric12/03/2020
BISOTISSUEDEverlast Solutions12/20/2021
BISOTISSUEDEverlast Solutions06/18/2021
BISOTISSUEDEverlast Solutions01/13/2021
BISOTISSUEDM&A Projects Restoration11/13/2018
BISPLISSUEDFJP Mechanical11/14/2017
BISOTISSUEDGreentree Construction10/25/2017
BISOTISSUEDIronbo07/26/2017
BISOTISSUEDCrosslink Wireless08/19/2016
BISOTISSUEDTelcom Engineering GP07/21/2016
BISOTISSUEDSato Construction01/13/2016
BISEQISSUEDRock Group NY12/08/2015
BISOTISSUEDCharles M Dwyer09/29/2015
BISOTISSUEDTelcom Engineering GP07/17/2015
BISOTISSUEDTelcom Engineering GP07/03/2014
BISOTISSUEDCel Tech Electric04/08/2014
BISOTISSUEDTelcom Engineering GP10/22/2013
BISOTISSUEDRally Restoration05/09/2013
BISMHISSUEDTechnical Solutions04/25/2013
BISEQISSUEDRock Group NY04/22/2013
BISOTISSUEDCommunication Component S12/19/2012
BISOTISSUEDOdyssia Global Commercial07/03/2012
BISOTISSUEDCostrotta Construction MG05/02/2012
BISPLISSUEDA & C Heating Services06/14/2011
BISOTISSUEDBci Communications04/20/2010
BISOTISSUEDArete Development02/24/2010
BISPLISSUEDAbr Plumbing & Heating Contracting12/02/2009
BISOTISSUEDTelcom Engineering GP07/13/2009
BISFBISSUEDA&C Heating Services06/12/2008
+ 11 more permits on file
1 project · most recent 08/10/2021
Gas
FiledStatusContractorScope
08/10/2021Permit IssuedAura PlumbingGas
2 projects · most recent 03/14/2023
General Wiring
FiledStatusContractorScope
03/14/2023Permit IssuedRedgrave Electl Maintnce—
07/10/2018CompleteStellmann ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/19/2025Mechanical SystemsANTONIO GUALTIERIspecial
11/19/2025FinalANTONIO GUALTIERIprogress
09/04/2025Mechanical SystemsANTONIO GUALTIERIspecial
09/04/2025FinalANTONIO GUALTIERIprogress
08/10/2021Post-installed AnchorsANTONIO GUALTIERIspecial
07/06/2021FinalANTONIO GUALTIERIprogress
331 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account