← Back
Walk-up apt, over six families with stores
54 ELIZABETH STREET
MANHATTAN · SoHo-Little Italy-Hudson Square · BIN 1077584
💬 Discuss this project
1890Year Built
7Stories
C7Building Class
C6-2GZoning
39,368 sfGross Floor Area
67Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: MEELY REALTY CORP. · 6,600 sf lot · 5.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Floor 112p · 1 filing · 20 docs
Site & exterior17p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MEELY REALTY1603/22/2026
BASIC GROUPS CORP1303/22/2026
ROCK GROUP NY1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP405/13/2024
PROJECT TACTICAL SOLUTIONS, LLC106/14/2023
ENTHINK ENGINEERS LLC105/18/2023
ASIF JAMIL, RA106/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor1007/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
PIPESTYLISTS, INCPlumbing307/08/2026
LINTECH ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371405/13/2024
PROJECT TACTICAL SOLUTION5859106/14/2023
Building Lifecycle
All (104)Filed (7)Permit Issued (8)Signed Off (4)Violation (53)Inspection (2)Special Inspection (30)
05/29/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF 1ST FLOOR OF EXISTING 7 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00903077-I1
05/23/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF 1ST FLOOR OF EXISTING 7 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00903077-S1
05/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2024
Special inspection requirement — Final
Eric Sun
05/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
05/15/2024
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
05/15/2024
Special inspection requirement — Interior lighting power
Eric Sun
05/15/2024
Special inspection requirement — Fenestration air leakage
Eric Sun
05/15/2024
Special inspection requirement — Air barrier - visual inspection
Eric Sun
05/15/2024
Special inspection requirement — Lighting controls
Eric Sun
05/15/2024
Special inspection requirement — Fenestration areas
Eric Sun
05/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
05/15/2024
Special inspection requirement — Permanent certificate
Eric Sun
05/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
05/15/2024
Special inspection requirement — Maintenance information
Eric Sun
05/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
05/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
05/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/15/2024
Special inspection requirement — Insulation placement and R values
Eric Sun
05/15/2024
Special inspection requirement — Mechanical Systems
Eric Sun
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
05/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
05/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/13/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF 1ST FLOOR OF EXISTING 7 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00903077-P2
05/13/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF 1ST FLOOR OF EXISTING 7 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00903077-P1
05/13/2024
Special inspection requirement — Fenestration air leakage
Eric Sun
05/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
05/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/13/2024
Special inspection requirement — Mechanical Systems
Eric Sun
05/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
08/29/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00875904-I1
07/21/2023
Permit issued — Mechanical Systems
M00903077-I1-GC-CX
07/21/2023
Permit issued — Plumbing
M00903077-S1-PL
07/19/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF 1ST FLOOR OF EXISTING 7 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00903077-S1
07/14/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF 1ST FLOOR OF EXISTING 7 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00903077-I1
06/22/2023
Permit issued — General Construction
M00884851-I1-GC
06/14/2023
Filed — Alteration
Facade restoration
M00884851-I1
05/18/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00875904-I1
05/18/2023
Permit issued — Sidewalk Shed
M00875904-I1-SH
01/17/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED SHALL & PIPE SCAFFOLD COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00045388-I1
08/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/2019
Violation issued (HPD, closed)
B
07/23/2019
Violation issued (HPD, closed)
C
07/23/2019
Violation issued (HPD, closed)
B
07/23/2019
Violation issued (HPD, closed)
C
07/23/2019
Violation issued (HPD, closed)
B
07/23/2019
Violation issued (HPD, closed)
C
07/23/2019
Violation issued (HPD, closed)
B
07/23/2019
Violation issued (HPD, closed)
C
07/23/2019
Violation issued (HPD, closed)
A
07/23/2019
Violation issued (HPD, closed)
B
07/23/2019
Violation issued (HPD, closed)
A
07/23/2019
Violation issued (HPD, closed)
C
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY07/21/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/21/2023
DOB NOWGeneral ConstructionPermit IssuedPHOENIX SUTTON STR INC06/22/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC05/18/2023
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/20/2018
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/20/2018
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP06/11/2018
DOB NOWSupported ScaffoldSigned-offROCK GROUP NY CORP06/11/2018
BISBLISSUEDK & BH PLUMBING & HTG INC01/10/2019
BISPLISSUEDK & BH PLUMBING & HTG INC01/10/2019
BISOTISSUEDSK ONE CONSTRUCTION INC02/07/2018
BISOTISSUEDSK ONE CONSTRUCTION INC02/01/2017
BISOTISSUEDT & MQ GROUP INC05/18/2016
BISOTISSUEDSK ONE CONSTRUCTION INC04/06/2016
BISOTISSUEDSK ONE CONSTRUCTION INC02/25/2015
BISOTISSUEDSK ONE CONSTRUCTION INC09/22/2014
BISPLISSUEDKIN CHI PLBG & HTG06/15/1999
BISOTISSUEDWAH LEUN GENERAL CONSTRUCTION05/11/1999
BISEQISSUEDWAH LEUN GENERAL CONSTRUCTION05/11/1999
BISEQISSUEDWELLDONE ENTERPRISES INC10/23/1997
2 projects · most recent 05/11/2023
FiledStatusContractorScope
05/11/2023CompleteELPO ELECTRICAL CONTG INC—
05/24/2018Permit IssuedLINTECH ELECTRIC, INC.—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/15/2024FinalEric Sunprogress
05/15/2024Fire-Resistance Rated ConstructionEric Sunprogress
05/15/2024Duct leakage testing, insulation and designEric Sunenergy_progress
05/15/2024Interior lighting powerEric Sunenergy_progress
05/15/2024Fenestration air leakageEric Sunenergy_progress
05/15/2024Air barrier - visual inspectionEric Sunenergy_progress
05/15/2024Lighting controlsEric Sunenergy_progress
05/15/2024Fenestration areasEric Sunenergy_progress
05/15/2024HVAC-R and service water piping design and insulationEric Sunenergy_progress
05/15/2024Permanent certificateEric Sunenergy_progress
05/15/2024HVAC-R and service water heating equipmentEric Sunenergy_progress
05/15/2024Maintenance informationEric Sunenergy_progress
05/15/2024HVAC-R and service water heating system controlsEric Sunenergy_progress
05/15/2024Fenestration and door U-factor and product ratingsEric Sunenergy_progress
05/15/2024Tenant Protection Plan ComplianceEric Sunspecial
05/15/2024Insulation placement and R valuesEric Sunenergy_progress
05/15/2024Mechanical SystemsEric Sunspecial
05/15/2024Fire-Resistant Penetrations and JointsEric Sunspecial
05/15/2024Energy Code Compliance InspectionsEric Sunprogress
05/14/2024Energy Code Compliance InspectionsEric Sunprogress
05/14/2024Tenant Protection Plan ComplianceEric Sunspecial
05/14/2024Fire-Resistant Penetrations and JointsEric Sunspecial
05/13/2024Fenestration air leakageEric Sunenergy_progress
05/13/2024Fire-Resistant Penetrations and JointsEric Sunspecial
05/13/2024Tenant Protection Plan ComplianceEric Sunspecial
Latest 25 of 47.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/06/2026M00045388-I1Request digital key ↗
08/31/2026M00875904-I1Request digital key ↗
08/30/2026M00884851-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION9
08/19/2019123770543Open ↗
01/10/2019123250365Open ↗
01/10/2019123250365Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
08/19/2019123770543Open ↗
04/17/2019123250365Open ↗
04/11/2019123250365Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026M00903077-P1Open ↗
08/31/2026M00903077-P1Open ↗
08/30/2026M00903077-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
10/15/2019123770543Open ↗
08/19/2019123770543Open ↗
07/09/2019123250365Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/06/2026M00045388-I1Open ↗
08/30/2026M00884851-I1Open ↗
08/27/2026M00903077-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026M00903077-P1Open ↗
08/31/2026M00903077-P1Open ↗
08/30/2026M00903077-P2Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/19/2019123770543Open ↗
01/10/2019123250365Open ↗
05/27/2016122665044Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/19/2019123770543Open ↗
01/10/2019123250365Open ↗
05/27/2016122665044Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/17/2019123250365Open ↗
04/11/2019123250365Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/10/2019123250365Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes5
08/19/2019123770543Open ↗
08/19/2019123770543Open ↗
01/10/2019123250365Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/06/2026M00045388-I1Open ↗
08/30/2026M00884851-I1Open ↗
08/27/2026M00903077-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/19/2019123770543Open ↗
01/10/2019123250365Open ↗
05/27/2016122665044Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
10/15/2019123770543Open ↗
08/19/2019123770543Open ↗
07/09/2019123250365Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/15/2019123770543Open ↗
07/09/2019123250365Open ↗
09/05/2018122107521Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
08/22/2014122107521Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/05/2018122107521Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/15/2019123770543Open ↗
07/09/2019123250365Open ↗
09/05/2018122107521Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/15/2019123770543Open ↗
07/14/2016122665044Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
10/15/2019123770543Open ↗
08/19/2019123770543Open ↗
07/09/2019123250365Open ↗
Showing 3 of 10 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
05/27/2016122665044Open ↗
▸Filing & Intake Forms14
▸BISBOROUGH INTAKE FORM5
10/15/2019123770543Open ↗
07/09/2019123250365Open ↗
04/11/2019123250365Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
05/23/2019123250365Open ↗
04/16/2019123250365Open ↗
08/07/2018122107521Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
08/19/2019123770543Open ↗
01/10/2019123250365Open ↗
05/27/2016122665044Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/09/2019123250365Open ↗
06/11/2018122107521Open ↗