← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 54 W 74 Condominium
54 WEST 74 STREET · BIN 1028688
💬 Discuss this project
1903Year Built
6Stories
RMBuilding Class
C1-8AZoning
56,164 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized18 Open Violations 16 unresolved · 2 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 54 W 74 ST CONDOMINIUM CORP · 10,217 sf lot · 5.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 2 filings · 14 docs
Floor 612p · 2 filings · 10 docs
Floor 5
Floor 432p · 5 filings · 20 docs
Floor 3
Floor 213p · 2 filings · 13 docs
Floor 1
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SJF6507/08/2026
MARBROSE REALTY2004/08/2026
54 WEST 74TH ST CONDOMINUIM1703/22/2026
54 W 74TH ST CONDO603/22/2026
CREST MANAGEMENT COMPANY103/22/2026
SNOW FLAKE DEVEL CORP103/22/2026
PIONEER MANAGEMENT103/22/2026
COLUMBUS FOODS INC303/21/2026
54 W 74 CONDOMINIUM203/21/2026
FRANZBLAU TRUST HOLDINGS - COMMERCI103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUKE LICALZI, P.E., P.C.1405/14/2025
FL&M ENGINEERING DESIGN &INSPECTION104/02/2025
GREEN DESIGN103/18/2021
INOV ENGINEERS LLC108/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON LIBASCI RA2803/21/2026
GEIGER E A GROUP203/21/2026
G PLAN DESIGN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED RESTORATION & DEVGeneral Contractor1003/21/2026
A.M.K. CONTRACTING CORPGeneral Contractor707/08/2026
REYVIN PLBG & HTG CORPPlumbing407/08/2026
MEJIA HECTORElectrical203/21/2026
HECTOR MEJIAElectrical203/21/2026
FRANK LA GREGAElectrical103/21/2026
MITACEK, JOHNElectrical103/21/2026
LINTECH ELECTRIC, INC.Electrical103/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor104/08/2026
JOSEPH SORTINOElectrical103/21/2026
GLEICH, BERNARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LUKE LICALZI P.E.,P.C.3679705/14/2025
Building Lifecycle
All (153)Filed (17)Permit Issued (16)Signed Off (3)Violation (60)Inspection (14)Objection (34)Special Inspection (9)
10/08/2025
Signed off — Alteration
M01194661-I1
05/27/2025
Objection raised — Other
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Structural
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Inspections
05/27/2025
Objection resolved — Addressed
05/14/2025
Filed — Alteration
parapet repair
M01194902-I1
04/03/2025
Permit issued — Sidewalk Shed
M01194661-I1-SH
04/02/2025
Filed — Alteration
M01194661-I1
03/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2025
Special inspection requirement — Final
Mark LiCalzi
03/13/2025
Special inspection requirement — Masonry
Mark LiCalzi
03/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mark LiCalzi
03/11/2025
Permit issued — General Construction
M01169906-I1-GC
03/05/2025
Permit issued — Plumbing
M01169918-I1-PL
03/04/2025
Objection resolved — Addressed
02/27/2025
Objection raised — Scope
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection raised — Admin
02/27/2025
Objection raised — Structural
02/27/2025
Objection resolved — Addressed
02/19/2025
Filed — Alteration
M01169918-I1
02/19/2025
Filed — Alteration
interior renovation of apartment 607
M01169906-I1
01/21/2025
Special inspection requirement — Final
Mark LiCalzi
05/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/21/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/03/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/07/2024
Permit issued — Structural
M00691723-I1-ST
03/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/15/2024
Objection raised — Scope
01/17/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/27/2023
Objection raised — Scope
11/15/2023
Objection resolved — Addressed
11/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2023
Objection resolved — Addressed
10/06/2023
Objection raised — Scope
10/06/2023
Objection raised — Zoning
10/03/2023
Filed — Alteration
interior renovation of apartment 212
M00691723-P1
09/29/2023
Permit issued — Plumbing
M00252522-I1-PL
09/27/2023
Permit issued — Plumbing
M00844574-I1-PL
09/26/2023
Permit issued — General Construction
M00844556-I1-GC
09/26/2023
Permit issued — Structural
M00691723-I1-GC
08/11/2023
Violation issued (ECB, closed)
Construction
08/08/2023
Violation issued (ECB, closed)
Construction
07/31/2023
Signed off — Alteration
facade repair
M00553350-I1
06/30/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/26/2023
Permit issued — General Construction
M00553350-I1-ST
06/23/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00489093-I1
06/06/2023
Violation issued (HPD, closed)
C
05/26/2023
Objection raised — Scope
05/26/2023
Objection resolved — Addressed
05/25/2023
Filed — Alteration
M00844556-I1
05/25/2023
Filed — Alteration
plumbing work related to interior renovation of apartment 402
M00844574-I1
05/16/2023
Violation issued (HPD, closed)
C
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/03/2025
DOB NOWGeneral ConstructionPermit IssuedA.M.K. CONTRACTING CORP03/11/2025
DOB NOWPlumbingPermit IssuedREYVIN PLBG & HTG CORP03/05/2025
DOB NOWStructuralPermit IssuedA.M.K. CONTRACTING CORP03/07/2024
DOB NOWPlumbingPermit IssuedREYVIN PLBG & HTG CORP09/29/2023
DOB NOWPlumbingPermit IssuedREYVIN PLBG & HTG CORP09/27/2023
DOB NOWGeneral ConstructionPermit IssuedA.M.K. CONTRACTING CORP09/26/2023
DOB NOWStructuralPermit IssuedA.M.K. CONTRACTING CORP09/26/2023
DOB NOWGeneral ConstructionPermit IssuedUNITED RESTORATION & DEV06/26/2023
DOB NOWGeneral ConstructionSigned-offUNITED RESTORATION & DEV08/26/2022
DOB NOWGeneral ConstructionPermit IssuedA.M.K. CONTRACTING CORP08/03/2022
DOB NOWPlumbingPermit IssuedREYVIN PLBG & HTG CORP08/01/2022
DOB NOWSidewalk ShedSigned-offUNITED RESTORATION & DEV04/26/2022
DOB NOWGeneral ConstructionSigned-offUNITED RESTORATION & DEV08/02/2021
DOB NOWSidewalk ShedSigned-offUNITED RESTORATION & DEV03/19/2021
DOB NOWGeneral ConstructionPermit IssuedA.M.K. CONTRACTING CORP03/16/2021
BISOTISSUEDA.M.K. CONTRACTING CORP01/27/2021
BISOTISSUEDA.M.K. CONTRACTING CORP01/27/2021
BISMHISSUEDD & T RESTORATION INC01/15/2021
BISOTISSUEDA.M.K. CONTRACTING CORP09/01/2020
BISOTISSUEDA.M.K. CONTRACTING CORP09/01/2020
BISPLISSUEDI.M.P. PLBG. & HTG. CORP07/08/2020
BISOTISSUEDD & T RESTORATION INC05/20/2020
BISOTISSUEDA.M.K. CONTRACTING CORP03/05/2020
BISMHISSUEDA.M.K. CONTRACTING CORP08/08/2019
BISPLISSUEDREYVIN PLBG & HTG CORP07/16/2019
BISPLISSUEDI.M.P. PLBG. & HTG. CORP05/08/2019
BISOTISSUEDD & T RESTORATION INC05/06/2019
BISPLISSUEDREYVIN PLBG & HTG CORP12/11/2018
BISOTISSUEDA.M.K. CONTRACTING CORP06/28/2018
BISOTISSUEDA.M.K. CONTRACTING CORP06/28/2018
BISOTISSUEDA.M.K. CONTRACTING CORP06/28/2018
BISOTISSUEDA.M.K. CONTRACTING CORP12/12/2017
BISPLISSUEDREYVIN PLBG & HTG CORP12/12/2017
BISOTISSUEDA.M.K. CONTRACTING CORP11/02/2017
BISPLISSUEDREYVIN PLBG & HTG CORP11/02/2017
BISOTISSUEDA.M.K. CONTRACTING CORP10/31/2017
BISPLISSUEDREYVIN PLBG & HTG CORP10/31/2017
BISOTISSUEDA.M.K. CONTRACTING CORP10/04/2017
BISPLISSUEDREYVIN PLBG & HTG CORP10/04/2017
+ 26 more permits on file
4 projects · most recent 05/25/2023
Water/Sanitary Gas
FiledStatusContractorScope
05/25/2023Permit IssuedREYVIN PLBG & HTG CORPGas, Water/Sanitary
02/22/2023Permit IssuedREYVIN PLBG & HTG CORPGas, Water/Sanitary
10/24/2019Permit IssuedREYVIN PLBG & HTG CORPWater/Sanitary
08/20/2019——Water/Sanitary
5 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
03/11/2025CompleteTOP SHELF ELECTRIC CORP—
05/01/2022CompleteROBERT CHIMENTI65 meters, 1 new_meters
04/06/2021Permit IssuedRICHARD NEU—
07/14/2020Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
3 projects · most recent 05/14/2025
Masonry Steel
FiledStatusContractorScope
05/14/2025——Masonry
10/03/2023Permit IssuedA.M.K. CONTRACTING CORPSteel
02/22/2023Permit IssuedA.M.K. CONTRACTING CORP1 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2024Fail-Final General Construction Non-Directive 14FailView ↗
05/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/17/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
11/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/15/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/19/2025Tenant Protection Plan Compliance—special
03/13/2025FinalMark LiCalziprogress
03/13/2025MasonryMark LiCalzispecial
03/13/2025Structural Stability – Alterations of existing buildingsMark LiCalzispecial
01/21/2025FinalMark LiCalziprogress
07/07/2021Structural Stability – Alterations of existing buildingsMark LiCalzispecial
07/07/2021MasonryMark LiCalzispecial
07/07/2021FinalVicente Varelaprogress
08/09/2019Fire-Resistant Penetrations and Joints—special
▾Documents — 450 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
09/04/2026M00489093-I1Request digital key ↗
09/03/2026M00553350-I1Request digital key ↗
08/31/2026M00647098-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00198736-I1Request digital key ↗
08/15/2026M00252522-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00452211-I1Request digital key ↗
▸Applications & Permits101
▸BISWORK PERMIT APPLICATION44
01/15/2021140841999Open ↗
09/01/2020140917925Open ↗
09/01/2020140906651Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION42
10/22/2025140538185Open ↗
09/28/2023122906043Open ↗
09/27/2023122906043Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWLPC Approval/Permit15
08/14/2026M00647098-I1Open ↗
08/13/2026M00553350-I1Open ↗
08/13/2026M00844556-I1Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications84
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
02/25/2020123858799Open ↗
02/25/2020123858799Open ↗
10/24/2019123693912Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00553350-I1Open ↗
08/31/2026M00647098-P1Open ↗
08/31/2026M00647098-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
04/05/2018123425230Open ↗
12/08/2017123264591Open ↗
10/31/2017123147941Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
04/05/2018123425230Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/27/2020140917925Open ↗
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/17/2026M01194902-I1Open ↗
09/17/2026M01194902-I1Open ↗
08/31/2026M00553350-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/17/2026M01194902-I1Open ↗
09/02/2026M01169906-I1Open ↗
08/31/2026M00553350-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
07/27/2020140917925Open ↗
07/17/2020140906651Open ↗
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
06/14/2018123309106Open ↗
06/13/2018123309106Open ↗
04/05/2018123425230Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING6
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/24/2020123813052Open ↗
05/28/2020123813052Open ↗
06/24/2019123813052Open ↗
▸BISEQUIPMENT USE PERMITS2
06/24/2020123813052Open ↗
06/24/2020123813052Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/08/2023122906043Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/08/2023122906043Open ↗
▸Safety & Tenant Protection21
▸BISTenant Protection Plan and Notes15
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
02/25/2020123858799Open ↗
Showing 3 of 15 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00198736-I1Open ↗
08/13/2026M00252522-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
08/18/2020140906651Open ↗
08/13/2020140906651Open ↗
08/10/2020140906651Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/03/2026M00553350-I1Open ↗
08/31/2026M00647098-P1Open ↗
08/31/2026M00844556-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
02/25/2020123858799Open ↗
08/27/2019123693912Open ↗
08/02/2019123813052Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
05/28/2020123813052Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/27/2020140917925Open ↗
11/02/2018140816062Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/06/2023122906043Open ↗
▸BISLIGHTING CONTROLS1
09/13/2023122906043Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/13/2023122906043Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/13/2023122906043Open ↗
▸BISFENESTRATION AREAS1
09/13/2023122906043Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION AIR LEAKAGE1
09/13/2023122906043Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/08/2023122906043Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/18/2020140906651Open ↗
05/28/2020123813052Open ↗
05/28/2020123813052Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
10/06/2023122906043Open ↗
09/11/2023122906043Open ↗
▸Approvals, Objections & Sign-offs36
▸BISLANDMARKS APPROVAL14
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
02/25/2020123858799Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/06/2023122906043Open ↗
05/28/2020123813052Open ↗
04/23/2018120327119Open ↗
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
10/06/2023122906043Open ↗
09/11/2023122906043Open ↗
▸BISLANDMARKS SIGNOFF1
09/07/2023122906043Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00489093-I1Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT24
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
02/25/2020123858799Open ↗
Showing 3 of 24 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
03/10/2020123858799Open ↗
06/29/2018123309106Open ↗
06/29/2018123425230Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/11/2023122906043Open ↗
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET20
02/25/2020123858799Open ↗
08/27/2019123693912Open ↗
06/24/2019123813052Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION13
12/16/2020140841999Open ↗
09/17/2020140841999Open ↗
02/14/2020140841999Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/27/2020140917925Open ↗
07/24/2020140906651Open ↗
04/09/2019140841999Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
05/20/2020140841999Open ↗
06/13/2018123309106Open ↗
04/23/2018120327119Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/13/2017123264591Open ↗
Showing 1 of 2 on file for this type
▸BISSupporting Document: Fee Deferment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01169906-I1Open ↗
08/13/2026M01194902-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/05/2023122906043Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type