← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
54 WEST 74TH STREET
MANHATTAN · BIN 1028688
💬 Discuss this project
1903Year Built
6Stories
RMBuilding Class
C1-8AZoning
56,164 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized14 Active Violations 12 unresolved · 2 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 54 W 74 St Condominium · 10,217 sf lot · 5.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMarbrose Realty INC1p · 1 filing · 7 docs
Floor 6Unit 60712p · 2 filings · 10 docs
Floor 5
Floor 4Unit 402, Unit 405, Unit 40632p · 5 filings · 20 docs
Floor 3
Floor 2Unit 21212p · 2 filings · 13 docs
Floor 1
CellarPioneer Supermarket1 filing · 5 docs
Site & exteriorMarbrose Realty INC10p · 3 filings · 12 docs
Filed — no permit issuedMarbrose Realty INC6p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SJF6507/08/2026
Marbrose Realty1804/08/2026
54 West 74th St Condominuim1803/21/2026
Columbus Foods303/21/2026
Franzblau Trust Holdings - Commerci103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Luke Licalzi, P.E1405/14/2025
FL&M Engineering Design & Inspection104/02/2025
Green Design103/18/2021
Inov Engineers108/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jon Libasci RA2803/21/2026
Geiger E A Group203/21/2026
G Plan Design Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.M.K. ContractingGeneral Contractor707/08/2026
United Restoration & Developmentspecialty_contractor603/21/2026
United Restoration & DevelopmentScaffold403/21/2026
Reyvin Plumbing & HeatingPlumbing407/08/2026
Hecmar ElectricElectrical203/21/2026
Mejia HectorElectrical203/21/2026
Megan Electrical Enterp'sElectrical103/21/2026
AL-Wes Electric ServicesElectrical103/21/2026
Top Shelf ElectricElectrical103/21/2026
Lintech ElectricElectrical103/22/2026
Inner City Electrical ContractorsElectrical103/21/2026
Spring ScaffoldingScaffold104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Luke Licalzi P.E3679705/14/2025
Building Lifecycle
All (148)Filed (17)Permit Issued (16)Signed Off (3)Violation (60)Inspection (9)Objection (34)Special Inspection (9)
10/08/2025
Signed off — Alteration
M01194661-I1
05/27/2025
Objection raised — Structural
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Other
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection raised — Inspections
05/27/2025
Objection resolved — Addressed
05/14/2025
Filed — Alteration
parapet repair
M01194902-I1
04/03/2025
Permit issued — Sidewalk Shed
M01194661-I1-SH
04/02/2025
Filed — Alteration
M01194661-I1
03/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2025
Special inspection requirement — Final
Mark LiCalzi
03/13/2025
Special inspection requirement — Masonry
Mark LiCalzi
03/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mark LiCalzi
03/11/2025
Permit issued — General Construction
M01169906-I1-GC
03/05/2025
Permit issued — Plumbing
M01169918-I1-PL
03/04/2025
Objection resolved — Addressed
02/27/2025
Objection raised — Scope
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection raised — Admin
02/27/2025
Objection raised — Structural
02/27/2025
Objection resolved — Addressed
02/19/2025
Filed — Alteration
interior renovation of apartment 607
M01169906-I1
02/19/2025
Filed — Alteration
M01169918-I1
01/21/2025
Special inspection requirement — Final
Mark LiCalzi
05/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/07/2024
Permit issued — Structural
M00691723-I1-ST
03/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/15/2024
Objection raised — Scope
01/17/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/27/2023
Objection raised — Scope
11/15/2023
Objection resolved — Addressed
11/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2023
Objection resolved — Addressed
10/06/2023
Objection raised — Zoning
10/06/2023
Objection raised — Scope
10/03/2023
Filed — Alteration
interior renovation of apartment 212
M00691723-P1
09/29/2023
Permit issued — Plumbing
M00252522-I1-PL
09/27/2023
Permit issued — Plumbing
M00844574-I1-PL
09/26/2023
Permit issued — General Construction
M00844556-I1-GC
09/26/2023
Permit issued — Structural
M00691723-I1-GC
08/11/2023
Violation issued (ECB, closed)
Construction
08/08/2023
Violation issued (ECB, closed)
Construction
07/31/2023
Signed off — Alteration
facade repair
M00553350-I1
06/30/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/26/2023
Permit issued — Structural
M00553350-I1-ST
06/23/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00489093-I1
06/06/2023
Violation issued (HPD, closed)
C
05/26/2023
Objection raised — Scope
05/26/2023
Objection resolved — Addressed
05/25/2023
Filed — Alteration
M00844556-I1
05/25/2023
Filed — Alteration
plumbing work related to interior renovation of apartment 402
M00844574-I1
05/16/2023
Violation issued (HPD, closed)
C
05/16/2023
Violation issued (HPD, closed)
C
05/16/2023
Violation issued (HPD, closed)
C
05/16/2023
Violation issued (HPD, closed)
C
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSpring Scaffolding04/03/2025
DOB NOWGeneral ConstructionPermit IssuedA.M.K. Contracting03/11/2025
DOB NOWPlumbingPermit IssuedReyvin Plumbing & Heating03/05/2025
DOB NOWStructuralPermit IssuedA.M.K. Contracting03/07/2024
DOB NOWPlumbingPermit IssuedReyvin Plumbing & Heating09/29/2023
DOB NOWPlumbingPermit IssuedReyvin Plumbing & Heating09/27/2023
DOB NOWGeneral ConstructionPermit IssuedA.M.K. Contracting09/26/2023
DOB NOWStructuralPermit IssuedA.M.K. Contracting09/26/2023
DOB NOWStructuralPermit IssuedUnited Restoration & Development06/26/2023
DOB NOWGeneral ConstructionSigned-offUnited Restoration & Development08/26/2022
DOB NOWGeneral ConstructionPermit IssuedA.M.K. Contracting08/03/2022
DOB NOWPlumbingPermit IssuedReyvin Plumbing & Heating08/01/2022
DOB NOWSidewalk ShedSigned-offUnited Restoration & Development04/26/2022
DOB NOWGeneral ConstructionSigned-offUnited Restoration & Development08/02/2021
DOB NOWSidewalk ShedSigned-offUnited Restoration & Development03/19/2021
DOB NOWGeneral ConstructionPermit IssuedA.M.K. Contracting03/16/2021
BISOTISSUEDA.M.K. Contracting01/27/2021
BISOTISSUEDA.M.K. Contracting01/27/2021
BISMHISSUEDD & T Restoration01/15/2021
BISOTISSUEDA.M.K. Contracting09/01/2020
BISOTISSUEDA.M.K. Contracting09/01/2020
BISPLISSUEDI.M.P. Plumbing & Heating07/08/2020
BISOTISSUEDD & T Restoration05/20/2020
BISOTISSUEDA.M.K. Contracting03/05/2020
BISMHISSUEDA.M.K. Contracting08/08/2019
BISPLISSUEDReyvin Plumbing & Heating07/16/2019
BISPLISSUEDI.M.P. Plumbing & Heating05/08/2019
BISOTISSUEDD & T Restoration05/06/2019
BISPLISSUEDReyvin Plumbing & Heating12/11/2018
BISOTISSUEDA.M.K. Contracting06/28/2018
BISOTISSUEDA.M.K. Contracting06/28/2018
BISOTISSUEDA.M.K. Contracting06/28/2018
BISOTISSUEDA.M.K. Contracting12/12/2017
BISPLISSUEDReyvin Plumbing & Heating12/12/2017
BISOTISSUEDA.M.K. Contracting11/02/2017
BISPLISSUEDReyvin Plumbing & Heating11/02/2017
BISOTISSUEDA.M.K. Contracting10/31/2017
BISPLISSUEDReyvin Plumbing & Heating10/31/2017
BISOTISSUEDA.M.K. Contracting10/04/2017
BISPLISSUEDReyvin Plumbing & Heating10/04/2017
+ 26 more permits on file
4 projects · most recent 05/25/2023
Water/Sanitary Gas
FiledStatusContractorScope
05/25/2023Permit IssuedReyvin Plumbing & HeatingGas, Water/Sanitary
02/22/2023Permit IssuedReyvin Plumbing & HeatingGas, Water/Sanitary
10/24/2019Permit IssuedReyvin Plumbing & HeatingWater/Sanitary
08/20/2019——Water/Sanitary
5 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteTimothy Coleman LicensedGeneral Wiring
03/11/2025CompleteTop Shelf Electric—
05/01/2022CompleteRobert Chimenti65 meters, 1 new_meters
04/06/2021Permit IssuedRichard Neu—
07/14/2020Permit IssuedLintech ElectricGeneral Wiring
3 projects · most recent 05/14/2025
Masonry Steel
FiledStatusContractorScope
05/14/2025——Masonry
10/03/2023Permit IssuedA.M.K. ContractingSteel
02/22/2023Permit IssuedA.M.K. Contracting1 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/17/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
11/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/15/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/19/2025Tenant Protection Plan Compliance—special
03/13/2025FinalMark LiCalziprogress
03/13/2025MasonryMark LiCalzispecial
03/13/2025Structural Stability – Alterations of existing buildingsMark LiCalzispecial
01/21/2025FinalMark LiCalziprogress
07/07/2021Structural Stability – Alterations of existing buildingsMark LiCalzispecial
07/07/2021MasonryMark LiCalzispecial
07/07/2021FinalVicente Varelaprogress
08/09/2019Fire-Resistant Penetrations and Joints—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pioneer SupermarketRetailCellar
Project M00198736 Alteration · Approved · 08/20/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 450 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
09/04/2026M00489093-I1Request digital key ↗
09/03/2026M00553350-I1Request digital key ↗
08/31/2026M00647098-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00198736-I1Request digital key ↗
08/15/2026M00252522-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00452211-I1Request digital key ↗
▸Applications & Permits101
▸BISWORK PERMIT APPLICATION44
01/15/2021140841999Open ↗
09/01/2020140917925Open ↗
09/01/2020140906651Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION42
10/22/2025140538185Open ↗
09/28/2023122906043Open ↗
09/27/2023122906043Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWLPC Approval/Permit15
08/14/2026M00647098-I1Open ↗
08/13/2026M01169918-I1Open ↗
08/13/2026M00452211-I1Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications84
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
02/25/2020123858799Open ↗
02/25/2020123858799Open ↗
10/24/2019123693912Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00553350-I1Open ↗
08/31/2026M00647098-I1Open ↗
08/31/2026M00647098-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
04/05/2018123425230Open ↗
12/08/2017123264591Open ↗
10/31/2017123147941Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
04/05/2018123425230Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/27/2020140917925Open ↗
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/17/2026M01194902-I1Open ↗
09/17/2026M01194902-I1Open ↗
08/31/2026M00553350-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/17/2026M01194902-I1Open ↗
09/02/2026M01169906-I1Open ↗
08/31/2026M00553350-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
07/27/2020140917925Open ↗
07/17/2020140906651Open ↗
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
06/14/2018123309106Open ↗
06/13/2018123309106Open ↗
04/05/2018123425230Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING6
04/09/2019140841999Open ↗
11/02/2018140816062Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/24/2020123813052Open ↗
05/28/2020123813052Open ↗
06/24/2019123813052Open ↗
▸BISEQUIPMENT USE PERMITS2
06/24/2020123813052Open ↗
06/24/2020123813052Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/08/2023122906043Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/08/2023122906043Open ↗
▸Safety & Tenant Protection21
▸BISTenant Protection Plan and Notes15
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
02/25/2020123858799Open ↗
Showing 3 of 15 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00198736-I1Open ↗
08/13/2026M00252522-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
08/18/2020140906651Open ↗
08/13/2020140906651Open ↗
08/10/2020140906651Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/03/2026M00553350-I1Open ↗
08/31/2026M00647098-P1Open ↗
08/31/2026M00844556-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
02/25/2020123858799Open ↗
08/27/2019123693912Open ↗
08/02/2019123813052Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
05/28/2020123813052Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/27/2020140917925Open ↗
11/02/2018140816062Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/06/2023122906043Open ↗
▸BISLIGHTING CONTROLS1
09/13/2023122906043Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/13/2023122906043Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/13/2023122906043Open ↗
▸BISFENESTRATION AREAS1
09/13/2023122906043Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION AIR LEAKAGE1
09/13/2023122906043Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/08/2023122906043Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/18/2020140906651Open ↗
05/28/2020123813052Open ↗
05/28/2020123813052Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
10/06/2023122906043Open ↗
09/11/2023122906043Open ↗
▸Approvals, Objections & Sign-offs36
▸BISLANDMARKS APPROVAL14
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
02/25/2020123858799Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/06/2023122906043Open ↗
05/28/2020123813052Open ↗
04/23/2018120327119Open ↗
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
10/06/2023122906043Open ↗
09/11/2023122906043Open ↗
▸BISLANDMARKS SIGNOFF1
09/07/2023122906043Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00489093-I1Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT24
08/18/2020140906651Open ↗
07/27/2020140917925Open ↗
02/25/2020123858799Open ↗
Showing 3 of 24 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
03/10/2020123858799Open ↗
06/29/2018123309106Open ↗
06/29/2018123425230Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/11/2023122906043Open ↗
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET20
02/25/2020123858799Open ↗
08/27/2019123693912Open ↗
06/24/2019123813052Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION13
12/16/2020140841999Open ↗
09/17/2020140841999Open ↗
02/14/2020140841999Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/27/2020140917925Open ↗
07/24/2020140906651Open ↗
04/09/2019140841999Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
05/20/2020140841999Open ↗
06/13/2018123309106Open ↗
04/23/2018120327119Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/13/2017123264591Open ↗
Showing 1 of 2 on file for this type
▸BISSupporting Document: Fee Deferment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01169906-I1Open ↗
08/13/2026M01194902-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/05/2023122906043Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type