← Back
One story retail building
5402 CHURCH AVENUE
BROOKLYN · East Flatbush-Rugby · BIN 3103013
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
R5Zoning
3,402 sfGross Floor Area
7Units
8 Open Violations ▸FDNY Report ↗
One story retail building · 8,667 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Roof5p · 1 filing · 20 docs
Floor 123p · 5 filings · 20 docs
Cellar14p · 2 filings · 20 docs
Site & exterior2p · 1 filing · 1 doc
Filed — no permit issued8p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5402 REALTY1303/21/2026
THE ABECO ORGANIZATION903/22/2026
TRUDZ 876504/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2024$2.0M—— → —$588/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLD3 ENGINEERING PLLC305/31/2025
MADRIAGA ENGINEERING P.C.411/13/2024
AG ENGINEERING PLLC108/07/2024
NY BUILDING ASSOCIATES INC106/28/2024
TSL ARCHITECT,P.C.207/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC403/21/2026
A & D BUILDING SOLUTIONS303/21/2026
HIGH QUALITY CONSTRUCTION 338203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor707/08/2026
VISION 21 INCGeneral Contractor603/21/2026
SCAFFTECH LLCGeneral Contractor303/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
ANTONY GIRONTAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616205/31/2025
J&R DESIGN AND INSPECTION6637411/13/2024
AG ENGINEERING PLLC8899108/07/2024
NKM ENGINEERING PLLC6244106/28/2024
AA BUILDING & INSPECTION1519207/25/2022
Building Lifecycle
All (110)Filed (11)Permit Issued (8)Signed Off (4)Violation (15)Inspection (8)Objection (34)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/2025
Filed — Alteration
FILING FOR VENTILATION SYSTEM FOR THE STANLESS STEEL HOOD COOKING.
B01035520-S2
02/20/2025
Signed off — Alteration
FILE GENERAL CONSTRUCTION WORK AT PROPOSED STORE WITH NEW PARTITIONS, FLOOR TILES, DOORS, DROP CEILING, PAINTING WORK AND REPLACE STOREFRONT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01067671-S2
02/20/2025
Signed off — Alteration
FILE GENERAL CONSTRUCTION WORK AT PROPOSED STORE WITH NEW PARTITIONS, FLOOR TILES, DOORS, DROP CEILING, PAINTING WORK AND REPLACE STOREFRONT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01067671-S1
02/20/2025
Signed off — Alteration
FILE GENERAL CONSTRUCTION WORK AT PROPOSED STORE WITH NEW PARTITIONS, FLOOR TILES, DOORS, DROP CEILING, PAINTING WORK AND REPLACE STOREFRONT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01067671-I1
02/14/2025
Signed off — Alteration
FILE EXTERIOR WORK AT EXISTING COMMERCIAL BUILDING TO INSTALL NEW ALUMINUM AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01092360-I1
02/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/06/2025
Permit issued — Plumbing
B01035520-S1-PL
01/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/23/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
FAHAD FATEH
01/23/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/17/2025
Objection raised — Plumbing
01/17/2025
Objection resolved — Addressed
01/17/2025
Objection raised — Plumbing
01/17/2025
Objection resolved — Addressed
01/17/2025
Objection raised — Inspections
01/17/2025
Objection resolved — Addressed
01/17/2025
Objection raised — Scope
01/17/2025
Objection resolved — Addressed
01/15/2025
Filed — Alteration
FILING FOR VENTILATION SYSTEM FOR THE STANLESS STEEL HOOD COOKING.
B01035520-S1
11/18/2024
Special inspection requirement — Fenestration air leakage
Robert Truskosky
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
11/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
11/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
11/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
11/18/2024
Special inspection requirement — Interior lighting power
Robert Truskosky
11/18/2024
Special inspection requirement — Fenestration areas
Robert Truskosky
11/18/2024
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
11/13/2024
Filed — Alteration
FILE GENERAL CONSTRUCTION WORK AT PROPOSED STORE WITH NEW PARTITIONS, FLOOR TILES, DOORS, DROP CEILING, PAINTING WORK AND REPLACE STOREFRONT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01067671-P1
10/25/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/15/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/03/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/11/2024
Permit issued — General Construction
B01067917-I1-GC
09/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/30/2024
Permit issued — Mechanical Systems
B01067671-S2-MS
08/29/2024
Filed — Alteration
FILE GENERAL CONSTRUCTION WORK AT PROPOSED STORE WITH NEW PARTITIONS, FLOOR TILES, DOORS, DROP CEILING, PAINTING WORK AND REPLACE STOREFRONT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01067671-S2
08/19/2024
Special inspection requirement — Exterior lighting power
NARESH MAHANGU
08/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
08/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
08/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
08/13/2024
Permit issued — General Construction
B01092360-I1-GC
08/07/2024
Filed — Alteration
FILE EXTERIOR WORK AT EXISTING COMMERCIAL BUILDING TO INSTALL NEW ALUMINUM AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01092360-I1
08/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/07/2024
Objection resolved — Addressed
08/01/2024
Special inspection requirement — Mechanical Systems
Robert Truskosky
08/01/2024
Special inspection requirement — Final
Jonar Madriaga
07/24/2024
Objection raised — Fire_Protection
07/24/2024
Objection raised — Zoning
07/24/2024
Objection resolved — Addressed
07/17/2024
Objection resolved — Addressed
07/17/2024
Objection resolved — Addressed
07/17/2024
Objection resolved — Addressed
07/11/2024
Objection raised — Other
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN02/06/2025
DOB NOWGeneral ConstructionPermit IssuedNY BUILDING ASSOCIATES IN09/11/2024
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN08/30/2024
DOB NOWGeneral ConstructionSigned-offSCAFFTECH LLC08/13/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.06/26/2024
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN06/25/2024
DOB NOWGeneral ConstructionPermit IssuedVISION 21 INC11/03/2022
DOB NOWGeneral ConstructionPermit IssuedVISION 21 INC03/03/2022
BISPLISSUEDPASQUALE QUARATINO INC02/22/2005
BISBLISSUEDPLUMBING & HTG DOCTOR INC03/02/2004
BISMHISSUEDLUIS FERMIN02/02/2004
BISEQISSUEDLUIS FERMIN02/02/2004
BIS—ISSUEDLUIS FERMIN02/02/2004
BISMHISSUEDLUIS FERMIN09/04/2003
BISEQISSUEDLUIS FERMIN09/04/2003
BISOTISSUEDLUIS FERMIN05/15/2003
BIS—ISSUEDLUIS FERMIN05/15/2003
BISPLISSUEDPLUMBING & HTG DOCTOR INC05/15/2003
BISEQISSUEDLUIS FERMIN05/13/2003
BIS—ISSUEDM & D CONSTRUCTION04/20/2000
BISBLISSUEDW.G. PLUMBING & HEATING03/28/2000
BISPLISSUEDW. G. PLUMBING & HEATING05/24/1999
BISPLISSUEDGOODWILL PLBG & HTG CO02/01/1999
BIS—ISSUEDM & D CONSTRUCTION01/28/1999
1 project · most recent 05/31/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/31/2025——Ventilation Systems
Ventilation
Greenheck GB-300-50140X3QD-DR2 15,000 CFM · Exhaust Fan ×1
1 project · most recent 05/31/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/31/2025Permit IssuedPRIME PIPING & HEATING INGas, Water/Sanitary
3 projects · most recent 09/16/2025
General Wiring
FiledStatusContractorScope
09/16/2025CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
05/04/2025CompleteWCK ELECTRIC CORP.General Wiring
10/23/2024CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/25/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
01/23/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/23/2025High Temperature Hot Water Piping (Welding)FAHAD FATEHspecial
01/23/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/18/2024Fenestration air leakageRobert Truskoskyenergy_progress
11/18/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
11/18/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
11/18/2024Fire-Resistance Rated ConstructionRobert Truskoskyprogress
11/18/2024Fenestration and door U-factor and product ratingsRobert Truskoskyenergy_progress
11/18/2024Interior lighting powerRobert Truskoskyenergy_progress
11/18/2024Fenestration areasRobert Truskoskyenergy_progress
11/18/2024Air barrier - visual inspectionRobert Truskoskyenergy_progress
08/19/2024Exterior lighting powerNARESH MAHANGUenergy_progress
08/16/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
08/16/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
08/16/2024HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
08/16/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
08/16/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
08/01/2024Mechanical SystemsRobert Truskoskyspecial
08/01/2024FinalJonar Madriagaprogress
06/28/2024Lighting controlsNARESH MAHANGUenergy_progress
06/26/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
06/26/2024Fenestration air leakageNARESH MAHANGUenergy_progress
06/26/2024Interior lighting powerNARESH MAHANGUenergy_progress
06/26/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/26/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
Latest 25 of 30.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00585005-I1Request digital key ↗
08/29/2026B00596517-I1Request digital key ↗
08/24/2026B01067671-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature17
08/30/2026B01067671-S2Open ↗
08/30/2026B01067671-S2Open ↗
08/30/2026B01067671-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00585005-I1Open ↗
08/29/2026B00596517-I1Open ↗
08/24/2026B01067671-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026B01067671-S2Open ↗
08/30/2026B01067671-S2Open ↗
08/27/2026B01067917-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00585005-I1Open ↗
08/29/2026B00596517-I1Open ↗
08/24/2026B01067671-I1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/15/2026B01067917-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01067917-I1Open ↗